Resume Summary
Resume Title
Update
Geophysicist
Contact Information
Update
Mezzar Abderrahmane
** *** ** ** ***** appart 135
Email: *******@*****.**
Phone: 003**********
Mobile: 003**********
Mobile : 002**********
Curent Location: France
Personal Information
Update
Date of Birth: 20 Sep 1966
Gender: Male
Nationality: French,Algerian
Language: Arabic, English, French
Religion: Islam
Professional & Educational Details
Update
Work Experience
25 years
Skills
geophysicist
Industry
Oil/ Gas/ Petroleum
Category
Oil & Gas
Roles
Geosciences, Geophysicist (Acquisition and Processing Seismic Data)
Education
Master's Degree, Petroleum, INHC Algeria
Preferred Job Location
Anywhere
Desired Job Type
Permanent,Full Time or contract
Detailed Resume
Update
LAND PROCESSING/ACQUISITION
EXPERTISE
ï ·Land, TZ and swamp seismic processing
ï · Land, TZ and swamp seismic acquisition
ï ·Near surface and static solutions
ï · Various sources: dynamite, vibroseis
ï ·Signal processing, imaging, true amplitude
ï · Various recording systems: Sercel, I/O
PROFESSIONAL SUMMARY
Over 25 years’ experience in large 2D and 3D seismic acquisition and processing projects: 15years international field seismic data acquisition (Middle East, Africa, North and south) in transition zone, swamp, desert, arctic, and savannah. 9 years in land, swamp and TZ processing, including geometry, near surface, signal processing, multiple attenuation, imaging including Prestack Time Migration and Dip Move Out, and true amplitude processing. Extensive experience in testing processing flows and software.
Good IT experience including UNIX, Linux, PC clusters, work stations and the associated geophysical software. Excellent MS Office skills.
EXPERIENCE
DATE
COUNTRY
CLIENT
DETAILS
September2017-
UNTIL July2020
ALGERIA
GEODATAEXPLO
GEOPHYSICIST CONSULTANT PROCESSING SEISMIC DATA TRAINING FOR FRESH ENGINEER FOR SEISMIC DATA ACQUISITION AND PROCESSING.
AUGUST2012-
UNTIL July2016
LIBYA
HAROUGE OIL OPERATION
SENIOR STAFF GEOPHYSICIST SEISMIC ANALYSIS TRAINING FOR FRESH ENGINEER FOR SEISMIC DATA ACQUISITION AND PROCESSING?CONTRACT NEGOCIATION WITH CONTRACTOR’S FOR SEISMIC ACQUISITION AND PROCESSING SOFTWARE USED.
DATE
COUNTRY
CLIENT
DETAILS
June2010-
March2012
PAKISTAN
PPL
GEOPHYSICIST CONSULTANT 2D Operation
QC land crew
as client representative for PPL Pakistani Petroleum Limited in Land seismic 2D and 3D Project. Done by BGP CONTRACTOR
DATE
COUNTRY
CLIENT
DETAILS
March2010-to
May 2010-
PAKISTAN
BP
GEOPHYSICIST CONSULTANT 3D Operation
QC land crew with
Geofizika Krakow using Omega software.
DATE
COUNTRY
CLIENT
DETAILS
March-2008 –until June 2009
MALAYSIA
NIPPON
GEOPHYSICIST CONSULTANT 2D project, reprocessing, acquisition and new processing prospect to follow and fix all the parameters acquisition and processing. To prepare all the relevant documents (contract, and technical parameters).
Supervisor in Processing center CGGveritas Kula-Lumpur Malaysia to QC reprocessing project.
SONATRACH And WesternGeco (Energy)
DATE
COUNTRY
CLIENT
DETAILS
2006
Arabia Saudi
Aramco
QC: preliminary survey design 3D .and control quality
2006
Egypt North
Apache
QC: preliminary survey design 3D .and control quality
2005
Egypt South
Apache
QC: preliminary survey 3D .and control quality
2005
Egypt Cairo processing centre
Near surface modeling evaluation, coherent and random noise elimination, and PSTM advice using Western Geco Omega and Omega2
2005
Chad
Esso
QC: preliminary survey design 2D comparing .and control quality
2004 -2000
Algeria
Sonatrach
Supervision acquisition in different crew land in north and south Algeria acquisition 2D and 3D
2000 - 1997
Algeria
Sonatrach
Supervision Processing data seismic 2D and 3D using different software,Disco,Geovecteur, Geopad,,Focus
1997 - 1993
Algeria
Sonatrach
Processing data seismic 2D and 3D using different software,Disco,Geovecteur, Geopad,,Focus
PREVIOUS CAREER DETAILS
SONATRACH- Data Processing 1993-2000
Land Data Processing Geophysicist based in DATA CONTROL SONATRACH ALGERIA
DATE
COUNTRY
CLIENT
SURVEY TYPE
PROCESSING SYSTEM
DETAILS
1993-2000
Algeria
Sonatrach
Processing 2D - mixed sources & receivers
Geovecteur, Disco GMG
PSTM with true amplitudes analysis
1993
Centre de Perfectionnement de l'Entreprise (CPE) Oran Alegria
Course and training for different software methods and communication
1994
Data Control Sonatrach Algeria
organization of data processing training software and methods
1999-2000
Algeria
Sonatrach
Processing New Project
Seismos, GLI, and GMG method KUPSTAT static for dunes
Near surface static issues, reprocessing geometry, 2D
1999
Algeria
Sonatrach
2D Land test line
Seismos & GMG
Near surface static issues, processing geometry, 2D
1999
Algeria
Sonatrach
2D Land test lines
Seismos & GMG
Near surface issues, ground roll, FK filtering
1999
Algeria
Sonatrach
2D Land test line
Seismos & GMG
Near surface and static issues, survey matching
1999
Algeria
Sonatrach
2D desert vibroseis
Seismos & GMG
Near surface, ground roll, FK filtering
1999
Algeria
Sonatrach
2D desert vibroseis
Seismos & GMG
Statics, and dunes
1999
Algeria
Sonatrach
3D vibroseis
Seismos & GMG
Statics, ground roll
1999
Algeria
Sonatrach
2D repro extraction from d
Seismos & GMG
Statics, ground roll, FK filtering
1999
Algeria
Sonatrach
2D processing new project
Seismos & Hampson-Russell GLI
Statics, noise and imaging
1998-9
Algeria
Sonatrach
Repro sources & receivers
Seismos
Multiple sources and receivers
1998
Algeria
Sonatrach
Repro of 2D desert, vibroseis data
Seismos & Hampson-Russell GLI
Near surface static issues, and reprocessing geometry
June 2010 – Until Now
Crew Supervisor onshore for PPL Pakistani Petroleum Limited
March 2010 – May 2010
Consultant with GEOFIZICA KRAKOW working for BP Pakistan
March 2008 – June 2009
Consultant and supervisor for Nippon Oil Exploration
in data processing center CGGVeritas Malaysia.
Jan 2005 - July 2006
WesternGeco Data,
QC land crew 2D and 3D acquisition in Chad, Egypt and Saudi Arabia Control Quality for all parameters of acquisition.
Processing in processing centre of Cairo Egypt for 1year project 3D marine.
Nov 2000-Aug 2004
Crew Supervisor, for SONATRACH:
Land Crew supervisor in the south of Algeria many area and many projects.
Nov1993-Nov 2000
Many projects processing and reprocessing data in processing centre (DATA CONTROL) SONATRACH .2D vintage and modern data, including transition zone.
The near surface was the main issue, requiring extensive modeling and static application. Rayleigh wave interpretation of shot records was used for top layer. Full report was written as all the final product of Projects for the near surface, as well as a full processing report. Geophysical (GMG) and (GLI) software was extensively used to build the model, solve for the near surface.