CURRICULUM VITAE
MIRZA WAJAHATH ALI BAIG
Phone no : +966*********
Email : *****.**********@*****.***
PASSP CAREER SUMMARY:
1.Working in the Mohammed-Al-Ojaimi company as a electrical engineer from March 2015 to
Till date, EOA.
2.Worked in Power pan kingdom company (PPCO) as a electrical engineer from august 2011 to May 2014, WOA.
3. Worked in first point construction services (India) private limited June 2009 to
August 2011 as an Electrical engineer.
PROFESSIONAL EXPERIENCE: 10 +YEARS
1. MOHAMMED AL OJAIMI CON.EST, DAMMAM-K.S.A
CURRENT PROJECT:
DISMANTLING OF 115KV OHTL FROM AL-MASOUDAI S/S TO NORTH MUBARRAZ S/S.
CN#440*******.
CLIENT : NATIONAL GRID (SEC).
POSITION : ELECTRICAL SITE ENGINEER
Key Responsibilities:
Conducting toolbox talk meeting and safety induction for all workers/employees.
Inspection of work place before commencement of hot work.
Attend the daily meetings and report the activities and daily progress to Project management..
Ensure that availability of resources (Materials & Human).
Quality checking of materials
Maintain the proper man power
Daily and monthly report Preparation
Marinating dismantle OHTL materials until hand over to SEC store
Coordinate with SEC witness for site activity
Preparation of RFI according to site activity
Taking necessary work permits like LOA & STW
Maintaining safety precautions and PPE during work
PROJECT’S
1) INTEGRATION OF PROPOSED 380KV BSP WITH THE 115KV U/G NETWORK IN AL-HASA CN#440*******.
CLIENT : NATIONAL GRID (SEC).
POSITION : ELECTRICAL SITE ENGINEER
Key Responsibilities:
Attend the daily meetings and report the activities and daily progress to Project management.
Co-ordinations with civil and mechanical
Ensure that availability of resources( Materials & Human )
Control time, cost
Quality checking of materials
Maintain the proper man power
Maintain the all necessary records &documentation
Knowledge of Saudi Electricity Company (SEC-EOA) Standards and other International Standards.
Construction of power lines by means of underground cables of 115KV and 230KV.
Trench Excavation, Backfilling the trench and Cable tail, Warning tape, Road Crossing
HV,LV,CONTROL CABLES Laying and termination
Sec Worked permit holder (C1)
Knowledge of 115 KV cable testing
Installation of underground non-metallic fiber optic cable (2-48 cores).
Installation of the link boxes hand holes and communication man holes
Coordinate with Consultant, as built Preparing.
Co-ordinate with SAUDI ELECTRICITY People and consultants.
2) 230 KV POWER SUPPLY TO IBN SINA S/S IN JUBAIL INDUSTRIAL CITY PHASE-1.
CLIENT : SABIC (IBN SINA)
POSITION : ELECTRICAL SITE ENGINEER
Key Responsibilities:
Attend the daily meetings and report the activities and daily progress to Project management
Co-ordinations with civil and mechanical
Ensure that availability of resources( Materials & Human )
Control time, cost and Billing Preparation as per BOQ
Quality checking the materials
Maintain the proper man power
Maintain the all necessary records &documentation
GIS Erection coordinate with SEC person
HV,LV,CONTROL CABLES Laying and termination
Coordinate with Consultant, As built Preparing.
62NOS 1Cx1200SQMM Straight Joint, Indoor and Outdoor End Termination, 1Cx50 End Termination.
Trench Excavation, Backfilling the trench and Cable tail, Warning tape, Road Crossing Duct
Co-ordinate with SAUDI ELECTRICITY People and consultants.
Coordinate with Consultant, As built Preparing.
Cable laying and terminations and co-ordination with Testing and Commissioning
2. POWER PAN KINGDOM (PPCO)
MADINAH-SAUDI ARABIA
POWER DISTRIBUTION PROJECT U/G 13.8KV & 33KV
CLIENT : SEC (WOA)
POSITION : ELECTRICAL SITE ENGINEER
Key Responsibilities:
Preliminary survey of site.
Laying of cables for low tension circuit and high tension circuit.
Cable jointing
Installation of ring main in all available sizes.
Termination of medium tension cables.
Installation and termination of transformers 13.8kv.
Installation of medium voltage switchgears.
Installation of house service of energy meters along with its distribution equipment.
Installation of power distribution cabinets.
Shifting of energy meters and their associated equipment’s. All maintains worked.
POWER DISTRIBUTION PROJECT OVER HEAD LINE 13.8KV & 33KV
MADINAH-SAUDI ARABIA
CLIENT : SEC (WOA)
POSITION : ELECTRICAL SITE ENGINEER
Key Responsibilities:
Install the new H – Pole structure with lazy pole and PMT & make all connections
100 & 200,300 KVA Transformer (PMT) commissioning of on New 13.8&33 KV OHL line.
Preparation of Material list for 13.8&33 KV OHL of Maintenance work (After Site Visit as per our (sec).
Excavate pole pit as required as per soil classification and erect any type of pole with all accessories.
Preventive & Breakdown maintenance of 13.8&33 KV OHL distribution line
Construct & Install of New 13.8&33 KV Overhead line
Replace an Existing HT damage pole with new pole against Fault report
Convert Existing intermediate pole to Section pole and install new ABS.
Replace defective Air break Switch and install new ABS.
Replace Existing defective PMT with new PMT and make all connections
Convert Intermediate pole to Terminal pole and raise cable with pole box.
Carryout all deadline work in the Distribution lines such as Pole Muff, Pole foundation Refurbishment, Red oxide paint & Pole paint
Preparation of Monthly report related to OHL works and submitted to sec
Erection & Commissioning of 13.8&33 KV Automatic Circuit Reclose including V.T
Replace & Re sag the both H.T & L.T Conductor against preventive maintenance.
Hand cleaning and physical checking of insulators
Ground Line patrolling of OHL distribution lines for both H.T & L.T Lines.
Hand cleaning of Insulators in the EHV Lines.
Spacer maintenance carryout in the Conductor of EHV lines.
Making Mid span joint & Repair sleeve in Conductor of EHV Lines.
Provide & Replace Guard Poles in between of span of Transmission Towers
Replace the Danger plate & Circuit plate in the Transmission towers.
Replace broken insulators in the EHV Lines
Track maintenance work carryout under Transmission Towers
STREET LIGHT (HIGH MASS) IN JEDDAH TO MAKKAH ROUTE
CLIENT : MINISTRY OF TRANSPORT (MOT)
POSITION : ELECTRICAL SITE ENGINEER
Key Responsibilities:
Have good knowledge of pole installation and maintenance.
Role, Importance, Responsibility of Electrical Engineer in Industry.
Knowing Client requirements & collection of specific data for projects.
Responsible for monitoring and checking site installations performed by subcontractors to ensure its adherence to the drawings and specifications.
Selection & Sizing of cables & voltage drop calculations.
Single line Diagrams Developing based on the present & future load requirements.
Ensure that the project Electrical work is carried out in accordance with the specifications & approved drawings, agreed procedure and method statements.
Installation of medium voltage equipment’s like ring main unit (rum), transformers, high voltage cable termination, cable laying etc.
Good management skills.
As per approved milestone preparation of monthly plan to achieve the milestone targets & further preparation of monthly and total material requirement as per planning.
Inspection of Equipment’s/system.
Coordination with the consultant.
Material & work management.
Monitoring day-to-day site activities, manpower and equipment and keeping the Project Manager updated on these issues.
3. FIRST POINT CONSTRUCTION SERVICES INDIA PVT LTD.
POSITION : ELECTRICAL SITE ENGINEER
1. Prepared & Verified
Lighting Load calculation
Power load calculation
MCC-load calculation
Single line diagram of lighting load
Single line diagram of power load
Single line diagram of MCC-load
Distribution panel board/load scheduling of lighting load
Distribution panel board/load scheduling of Power load
2. LV & LC cable Tray Sizing
3. Feeder cable voltage drop calculation
PROFESSIONAL AND ACADEMIC QUALIFICATIONS:
Bachelor of Technology in the faculty of Electrical & Electronics Engineering from Ayaan College of Engineering & Technology.
Intermediate Education with Mathematics, Physics, Chemistry from Gotham junior college Hyderabad in the Year 2003.
Secondary School Certificate (S.S.C) from M A IDEAL High School, Hyderabad, in the year 2001.
COMPUTER SKILLS & PROFESSIONAL TRAINING:
Operating System : Microsoft Windows (XP & Vista, Windows
8&Windows 10).
Languages : Turbo C.
Applications : Microsoft Office (Word, Excel and PowerPoint).
Hardware and Networking.
DETAILS:PASSPORT
Passport Number : R2449846
Date of Expiry : 25/03/2027
Place of Issue : Riyadh
Driving license : K S A
PERSONAL PROFILE:
Name : Mirza Wajahath Ali Baig
Father’s Name : Mirza Taqi Ali Baig
Date of Birth : 11/06/1983
Gender : Male
Marital Status : Married
Nationality : Indian
Place: AL HASA MIRZA WAJAHATH ALI BAIG
Date: