Pakistan Engineering Council
P.E.C. # ELECT/ ****8
Government of the Punjab
Exemption Certificate of competency Category “B”
Certificate # CE (P)/B-171
Membership # 92679719
IAENG
Membership no.
HAFIZ MUHAMMAD ZAMAN ZAHID
JOB FOR ELECTRICAL ENGINEER
DIPLOMAS Y HOBBIES
Formaciones : Diplomados, Congresos, xxxxxxxxxx xxxxxx xxxxxxxxx xxxxxxxxxxxxxxxxx
Hobbies: xxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
OBJECTIVIES:
To provide a solid foundation in the electrical, electronics, telecommunications, computer and software engineering. To develop the concepts of professional practices, innovation and enterprise,
009*********** **************@*****.*** 13-B, Usman Street, Mateen avenue, Gondal chowk, college road, Township,
Lahore, Pakistan.
SOFTWARE
Excel
PowerPoint
Word
xxx
Photoshop
Auto CAD
Mat LAB
WORK EXPERIENCE
LANGUAGES
Urdu: Natal
English: Excellent
French: Poor
09-Sep-2008-To-27-Jan-2010
Address: Pack Tech 138-Main Industrial Estate, Kot Lakhpat, Lahore, Pakistan.
Feb-2010-To-Dec-2012
Address: Quaid-e-Azam Industrial estate, Kot Lukhpat, Lahore, Pakistan.
PACK TECH PRIVATE LIMITED
Assistant Electrical Engineer
Missions or tasks realized: I had worked with Pack Tech. Where I had Responsibilities of trouble shooting on; Diamond engravers (K500, K405) for cylinder making. Eight, Six and five color printing machines. Solvent less lamination machine, Slitting machine for cutting paper real, Center & bottom seal, tri seal machine, Reading and data taking from 35kw Air compressor, 106 kVA, 135 KVA gen sets. Power factor & Energy improvement issues, VFD commissioning & parameters setting.
Whilshire Pharmasuitical Industries Pvt Ltd.
Electrical Engineer
Missions or tasks realized: Responsible for power factor correction, energy amendment of electrical machines. Responsible for hardware repairing of Diamond engraver 9 color machine, Maintenance of Compressor, Chiller, Boilers. Service and trouble shooting of Generators; Perkin, Dominion, Commence, Caterpillar, Waukesha. Responsible for maintenance and servicing the Solvent less lamination machine. Servicing of Power factor and Energy improving issues. Repairing of 10Kva, 135 KVA generator. VFD commissioning & parameters setting working on Delta, puma inverters. Maintenance, servicing the surgery equipment machines, My responsibility as an Electrical engineer is that they are mainly involved in designing, developing and maintaining broad range of electrical systems or components by focusing on safety, economy, reliability, sustainability and quality.
2002
Secondary School
BOARD OF INTERMEDIATE & SECONDARY EDUCATION
Lahore, Pakistan.
Grade = A+
2004
Intermediate
BOARD OF INTERMEDIATE & SECONDARY EDUCATION
Lahore, Pakistan.
Grade = A
2006
Internship (Trainee Engineer)
CREATIVE ENGINEERING PVT. LTD.
150-152/S, Small Industrial Estate, Kot Lukhpat, Lahore, Pakistan.
2008
(B.Sc) Electrical Engineer
UNIVERSITY OF CENTRAL PUNJAB
UCP, 31-Main Gulberg, Lahore, (54660), Pakistan.
CGPA = 2.71
EDUCATION
I have design and manufacture many of the electrical equipments for sectors like manufacturing, transportation, building industry, production and distribution of electricity. They primarily design, employ and enhance electrical products for any purpose. VFD commissioning & parameters setting working on Delta, puma, Yaskawa inverters
OLAYAN DESCON INDUSTRIAL Co.
Electrical & Instrumentation Engineer
Missions or tasks realized: Served as electrical/instrument engineering department at olayan descon industry. Now I’m working with mechanical department in Yanbu to rise the status of workshop. I prepared the electrical and control diagram of rolling machine to keeping an eye on spare parts and raise purchase requisitions whenever required to control operation and for preventive maintenance, One of my major job functions is to work as site Asst. E&I Engineer in SAMREF at YANBU
TECHNOSOLUTION ENGINEERING
Electrical Engineer
Missions or tasks realized: As an Electrical engineer my core responsibilities are mainly involved in designing, site maintenance installation of electrical systems or components by focusing on health safety rulers, I prepared the electrical and control diagram of panels power factor panels, Servicing of Power factor and Energy improving issues, TSE register contractor of oil and gas at Total Parco depots in all over Pakistan, I’m serving as an permit holder at sites and project controller
ALPHA ENGINEERING & SERVICES
Site Manager
Missions or tasks realized: Electrical site engineers direct and oversee electrical engineering projects at construction sites, resolving issues and ensuring that work is completed according to specifications. They balance project management and engineering tasks ranging from designing electrical plans to monitoring contractors.
ZAHID ELECTROPLATING WORKS
Electrical Engineer
Missions or tasks realized: Responsible for Power factor, genset and Energy improving issues. Maintenance Serving and trouble-shooting of electroplating plants to achive the clients desired requirements in the field of surface treatments where our clients are Suzuki Honda Toyota and MG companies and we are here to meets the OEM’s automotive parts manufacturing goals & standards.
03-Mar-2013-To-27-Aug-2013
Address: P.O. Box 31120, yanbu al-Bahar 41951,
Kingdom Of Saudi Arabia.
30-Aug-2013-To-30-Sep-2013
Address: Plot #702, Block-3,
Sector C-2, Hamad Shaheed chowk,
Green town, Lahore, Pakistan.
01-Oct-2013-To-31-Oct-2014
Address: 13-B, Usman Street, Mateen avenue, Gondal chowk, College Road, Lahore, Pakistan.
01-November-2014-till Present
Address: Unit#20, Saidpur, Industrial area, Multan road, Lahore, Pakistan.
SELF PROJECTS
F.R Cables Spell petrochemical (Pvt) Ltd.
Involved in a project from the concept and detail of the design to implementation, testing and handover
Involved in maintenance programs’, gen sets.
Commissioning & parameter setting of intermediate wire drawing machine where two micro master 440 VSD is in master slave mode connected through communication port
Identify requirements of the customer.
Design products and systems.
Read technical drawings and design specifications.
Research appropriate solutions and estimate timescales and costs.
Make prototypes and models of products.
Propose modifications and retest products.
Qualify the final system or product.
Service and maintain equipment.
Prepare product documentation, give presentations and writing reports.
To monitor a product that is in market so as to improve its future design.
SAILKOT INTERNATIONAL AIRPORT LTD, S.I.A.L
Research appropriate solutions and estimate timescales and costs.
Troubleshooting on ATC tower, microcontroller base cards
Make prototypes and models of products.
Work to European, British and other standards.
Liaise with other design team members.
Liaise with contractors and clients.
Attend on site meetings.
SHELL INSTALLATION
Chaklala.
Troubleshooting on transformer rectifier at Nalah Lei.
Work on Cathodic protection issues on pipelines.
Give the standards for impressed current Cathodic Protection system.
Diagnosing insulation leakage in pipelines.
Taking the measurement of half-cell test
@zamanza40070042
Zaman Zahid
url.linkedin
Syed Suleman Shah
ALPHA ENGINEERING & SERVICES CEO
Phone +923*********
*************************@*****.***
Usman Zahid
ZAHID ELECTROPLATING WORKS CEO
Phone +923*********
*****.*******@*****.***
REFERENCES
SOCIAL