Post Job Free
Sign in

Electrical Foreman General Manager

Location:
Myrtle Beach, SC
Salary:
30
Posted:
October 10, 2024

Contact this candidate

Resume:

ALEX R. SALINDATO JR.

Contact Number: 843-***-****

E-mail ******************@*****.***

OBJECTIVES:

Seeking a position in the electrical field where I can perform and develop, in all, but not limited to my experiences and qualifications as well as contributing to the success of the company.

PERSONAL INFORMATION:

Permanent Address:3701 South Ocean Blvd. #207

North Myrtle Beach, SC 29582

Cell No. 843-***-****

Date of Birth:July 27, 1971

Place of Birth:Libis, Talisay

Caloocan City, Philippines

Civil Status:Single

Nationality:Filipino

Religion:Christian

EDUCATIONAL BACKGROUND:

College :BATAAN NATIONAL SCHOOL OF ARTS&

TRADE

Bachelor of Science in Industrial Technology

Balanga, Bataan

High School:BATAAN NATIONAL SCHOOL FOR FILIPINO

CRAFTSMEN

Oraani,Bataan

Elementary : ORANI NORTH ELEMENTARY SCHOOL

Orani, Bataan

Vocational:NATIONAL MANPOWER AND YOUTH COUNCIL

Methodist Orani, Bataa

SEMINAR / TRAININGS:

ARAMCO K.S.A : Work Permit Receiver/ Safety Procedures BECHTEL : P.P.E Safety Training & Electrical safety Rescue

EMPLOYMENT EXPERIENCE :

December 4, 2023-present Electrician Assembler -install conduit and fabricating cable tray and wiring and cable termination Envirocep

31 Aviation Blvd.

Georgetown, SC 29440

Angel Tilton - general manager

*******@*********.*** Tel. 843-***-**** Ext. 235 June 5, 2023-Dec. 1, 2023 Installer-installing awning and solar shades and shutters

Shade and Shutter Expo

3147 Fred Nash Blvd.

Myrtle Beach, SC 29577

Danny Fergus - owner/manager

****@*******************.*** Tel. 843-***-****

March 18,2 019-Sept.30/22 ELECTRICAL FOREMAN

JUNTEE PHILIPPINES INC.

G/F UNIT 108 ESJCENTRE BURGOS ST.BRGY.

VILLAMONTE BACOLOD CITY

6100 NEGROS OCC.PHILIPPINES

Estimate material to be used and taking off materials list, Report daily progress.

installations of conduit pipe, cable tray.

including cable pulling and termination of control cable and Medium voltage cables.

Mounting switchgear panel and primary transformer involving allignment and erection of busduct bar from switchgear panel tto transformer.

March 5,2018- Aug.10,2018 Electrician

TRUE NORTH MANUFACTURING SERVICES

CORPIRATION

Work as a lead man electrical maintenance and estimating materials and taking off materials list plus lay outing and installation of conduit and cable tray for ligting and motors including cable and wire terminations.. August 05,2016 at October 04,2017 - ELECTRICIAN

TRPLE J SAIPAN,INC.

P.O BOX 500487

SAIPAN MP 96950

Working as a maintenance in Sandy Beach Homes building as well as in the construction site. Lay outing and installing electrical conduit,lighting fixtures,circuit breaker,convenience outlet and termination of cables. Including carpentry and assisting in mason work.

February 8, 2014- at Aug.2014 -L/M ELECTRICAL TECHNICIAN RMP-2 PETRON

SUNGJUN INTL. PHIL.

LAMAO, BATAAN

Installation of lighting fixture, cable glanding and termination, mounting instrument transmitter and cable pulling. Perform pre-commissioning including motor solo run test. Report job accomplished and taking off material list.mounting air con window and split type,refill preon and termination of control cable for H.V.A.C December 2012- August 2013- ELECTRICAL TECHNICIAN

RMP2-PETRON

BUMJIN INTL. PHILIPPINES

B.O DUALE LIMAY

BATAAN

Repairing welding machines as well as Tig torch welding. Monitoring generator set as well as maintaining of good condition of it and repair. Install surveilance cameras, and repairing grinder machine, drill machine and others. Installing lighting fixture and power supply from generators to power distribution board. Repairing of vevel and cutting machine for pipe. Lay out individual supply for a

air conditioning and install split type air conditioning September 02,2012- November 02,2012 - ELECTRICAL TECHNICIAN Kentz Company Papua, New Guinea (PNG)

•Cable glanding and cable termination, installation of cable trays, pulling cable and panel installations.

•Layouting cable grounding

Layouting Main Grid Cable and Welding and Fabricating support. Cable Glanding and Cable termination pulling cable, Loop checking and Insulation resistance test . -Working as a Leadman.

March 13, 2010 – September 20, 2010 - CHARGE HAND ELECTRICIAN BECHTEL COMPANY

LNG, SOYO ANGOLA

AFRICA.

Cable glanding and cable termination, installation of cable trays, pulling cable and panel installations.

November 20, 2008 – May 14, 2009 - ELECTRICIAN

IMPREGILO LIDCO

GENERAL CONTRACTING COMPANY

HAY AL ANDALUS, AHMED

TAMIMI ST. P.O. BOX 2243

TRIPOLI, LIBYA

General maintenance, lay-outing lightning and power circuit. Maintaining the camp safe and properly including the plumbing works, installing air condition indoors and split unit. Lay outing LAN cable for communication and do some carpentry works. July 2007 – April 2008 - CHARGEHAND

SOHAR ALUMINUM SMELTER

PROJECT

BECHTEL COMPANY LLC

SULTANATE OF OMAN

CHANRGE HA ELECTRICIAN

Taking off materials needed and report completed works. Assigned in PRE OPS commissioning in GIS and doing cable termination. Perform and other duties and function as per order from supervisor Alignment of all GIS accessories. Install capacitor Bank, Post insulator, Surge Arrester for Harmonic Filter.

May 2006 – September 2006 - CHARGEHAND ELECTRICIAN BECHTEL / PFD

TENGIZ, KAZAKHSTAN

OIL REFINERY

Worked as acting Foreman in electrical works including cable glanding and cable termination as well as cable pulling.

September 17, 2003 – March 03, 2004 - ELECTRICAL TECHNICIAN/FOREMAN BRUNEL INT’L. S.E.S. PTE LTD.

BRUNEI / CLOUGH

PNG OIL REFINERY

NAPA-NAPA, PAPUA NEW GUINEA

Mounting of aligning of switch gear panel and erecting of bus duct from switch gear to panel thru transformer. Working as a Leadman for cable pulling and cable glanding plus termination.

Worked in a commissioning for motor test, arranging document for electrical and assisting QA / QC paper works. Doing as built as per construction on site in electrical had been modified, some wiring termination.

January 12, 2003 – June 12, 2003 CONSOLIDATED CONTRACTORS INTERNATIONAL COMPANY (S.A.L)

CHIYODA CAMP STATE OF QATAR

Worked as charged hand electrician in cable glanding and pulling cable as well as cable termination. Taking off materials for electrical fittings and others. Report completed electrical installation.

Sept. 27, 1999 – June 12, 2002 CONSOLIDATED CONSTRACTORS INTERNATIONAL COMPANY (S.A.L)

P.O. BOX 70193

HABSHAN, ABUDHABI, UAE

Mounting switch gear panel and termination of cables. Loop-checking and meggering cables including welding and fabricating support, injecting current in switch gear breaker through motor controls. Lay-outing conduit, cable tray and support. March 18, 1997 – Jan. 11, 1998ELECTRICIAN

CONSOLIDATED CONSTRACTORS

COMPANY C.C.C.

P.O BOX 34

DHARAN AIRPORT K.S.A.

July 15, 1999 – July 11, 1999 ELECTRICIAN LEAD MAN CONSOLIDATED CONSTRACTORS CO.

SAUDI FERTILIZERS CO. (SAFCO)

C.C.C. P.O. BOX 10952

JUBALIA31961

K.S.A

Had been an electrical charge hand SAFCO Project, Supervision and installation of conduit. Cable tray and fire alarm panel represent. C.C.C. in electrical construction and completed electrical installation. Taking off materials needed and report electrical installation. A term leader in lay outing and termination cables.

CONSTRUCTION SPECIALIST FOR

SAUDI ARAMCO (R.T.R.U.P)

UPGRADINGPROJECT/PORT CONTROL

COMMUNICATION PROJECT DIVISION

•Installing electrical panel board, lay-outing conduit, cable tray for lighting and motors.

•Assisting in electrical work and report completed work.

•Fabricating and welding support for panel board and others.

•A team leader in cable pulling, meggering and testing motors and termination of cables.

•Cable glanding and termination.

•Cable termination, loop checking, modification testing and commissioning.

•Installation of MOV.

•Repairs malfunctions by such methods as replacing burned out elements, fuses and replacing defective wirings, cleaning and repairing motors.

•Test electrical equipment, such as motors, heaters and controls for safety and efficiency, using standards test equipment and by observing functions.

•Mounting of switchgear panel, termination of control.

•Locates and determines malfunctions using test equipment. Jan. 15, 1996 – Oct. 17, 1996ELECTRICIAN LEADMAN

PETRON / FAFCO

SAUDI ELECTRO-MECHANICAL

CONSTRUCTION CO., LTD.

P.O. BOX 806

DAMMAN 31421

KINGDOM OF SAUDI ARABIA

ONSHORE / OFFSHORE

ELECTRICIAN LEADMAN

SAUDI ARAMCO N.G.L. REFINERY

UP-GRADING PROJECT

AL-SINAIYAH, YANBU

KINGDOM OF SAUDI ARABIA

•Has been assigned to be a permit receiver in all aspect of work.

•Upgrading and mounting analyzer cabinet and installation of instrument tubing.

•Installing of conduit, fire alarm equipment, panel board and loop-checking and meggering including termination of electrical and instrument cable and glanding cable.

June 05, 1994 – Jan. 14, 1996 ELECTRICIAN LEAD MAN PETCON / FAFCO

P.O. BOX 806

DAMMAM 31421

KINGDOM OF SAUDI ARABIA

ONSHORE / OFFSHORE

SAFANIYA GOSP 4

•Has been working in Safaniya Gosp4 Offshore and Onshore.

•Mounting switch gear panel, pulling and termination of cables, commissioning and test motors.

•Installation and termination of smoke detectors including lightning.

•Lay outing rigid steel condiut with PVC coated.

•Installing cable tray.

June 1994 – May 31, 1995 ELECTRICIAN

PETCON / FAFCO

P.O. BOX 806

DAMMAM 31421

KINGDOM OF SAUDI ARABIA

IBN HAYYAN, PETROKEMYA

JUBAIL, K.S.A.

•Maintaining workshop including lightning, outlet and repairing drill and grinder machine.

Feb. 14, 1993 – May 1993 ELECTRICIAN

PETRON / FAFCO

P.O. BOX 806

DAMMAM 31421

KINGDOM OF SAUDI ARABIA

•Install, maintain and repair equipment needed for electrical such as generator, welding machine, drill and grinder.

•Assist on commission and programming of all security and fire alarm.

•Lay-outing, pulling dressing and termination of electrical cables. Oct. 11, 1992 – Feb. 1993 ELECTRICIAN

PETCON / FAFCO

P.O. BOX 806

DAMMAM 31421

KINGDOM OF SAUDI ARABIA

HADDED SAUDI IRON

STEEL PLANT

JUBAIL, K.S.A

•Has been assigned to work for Daniele Co. Ltd., the work includes mounting and alignment of the motors. Installation and termination of fire alarm devices such as fire, smoke and heat detector.

•Assist on commissioning and loop=checking including maintenance.

•Lay-outing conduit and cable fabricating support. Sept. 1992 – Oct. 1992 ELECTRICIAN

PETCON / FAFCO

P.O. BOX 806

DAMMAM 31421

KINGDOM OF SAUDI ARABIA

•General Maintenance: lay-outing some additional lightning pole and maintaining the compound safe and properly including plumbing works.

•Lay-outing conduit, such as PVC, rigid steel galvanized, electrical metallic tubing

(E.M.T.) and rigid steel PVC coated.

•Works project documentation in preparation of the installation and maintain accuracy record of all works done.

1990 – 1991 ELECTRICIAN

D.J. ROQUE CONSTRUCTION CO.

LIMAY BATAAN REFINERY

CORP. (B.R.C.)

•Assisting in electrical work, pulling, dressing and termination of cable.

•Installation of lightning fixtures, magnetic switch selector with Jog-R. CHARACTER REFERENCES :

Mr.Mario Valentino

Const.Ops.Mgr./Sr.Supt.

Triple J Saipan Inc.

Email: **********@*************.***

Tel.# +1-670-***-****

Cp# +1-670-***-****

Mr. Danny Fergus

Shade and Shutter Expo

3147 Fred Nash Blvd.

Myrtle Beach, SC 29577

****@*******************.***

Tel 843-***-****

I hereby certify that the above information is true and correct to the best of my knowledge and belief. Alex R. Salindato Jr.



Contact this candidate