Post Job Free
Sign in

Design Architect Safety Analysis

Location:
Lilongwe, Central Region, Malawi
Posted:
November 15, 2024

Contact this candidate

Resume:

Page * of *

Isaac Banda

Box **, Mikolongwe,Chiradzulo

CELL: +265*********/994799397 Email: *********@*****.*** https://www.linkedin.com/in/isaac-banda-38545374/

PROFESSIONAL SUMMARY

Graduate Architect with over 7 years working experience in designing and developing specifications for commercial, public, and residential buildings. Well-versed in all phases of project management while exhibiting good teamwork, communication skills and attention to detail. SKILLS

• Hand drafting

• AutoCAD

• Revit Architecture

• Twinmotion

• Adobe Creative Suite

• Microsoft Project

• Project Management

• Detail-oriented

• Teamwork

• Presentation Skills

PROFESSIONAL EXPERIENCE

1.Draughtsman at Japanese Tobacco International (JTI) July 2020 – Present Tasks

• Develop & align preliminary drawings with stakeholders

• Develop detail drawings for Contractor costing

• Contractors site visits and scope alignment

• Review of Contractors Bills of Quantities/quotations

• Project Planning, safety analysis & documentation

• Project Monitoring & Implementation

• Post Project review & documentation

• Updating Primal drawings

1.2 Projects

1.2.1 Construction of TDC Ablution Block and Guard House Duration August 2020 – November 2020

Contract Price: MK44.882.478,46 ($55,032.52)

Project Stage Involved: Construction Phase, Practical Completion & Defects Liability Period. 1.2.2 Head Office Refurbishment Phase 1

Duration February 2021 – May 2021

Contract Price: MK 56,904,046.56 ($69,772.73)

Project Stage Involved: Conceptualization, Project Planning, Construction Phase, Practical Completion & Defects Liability Period.

Page 2 of 4

1.2.3 Head Office Refurbishment Phase 2

Duration October 2021 – November 2021

Contract Price: MK 56,904,046.56 ($69,772.73)

Project Stage Involved: Conceptualization, Project Planning, Construction Phase, Practical Completion & Defects Liability Period.

1.2.4 Head Office Refurbishment Phase 3

Duration February 2022 – July 2022

Contract Price: MK 81,691,621.20 ($65,353.73)

Project Stage Involved: Conceptualization, Project Planning, Construction Phase, Practical Completion & Defects Liability Period.

1.2.4 Head Office Bistro Shed

Duration June 2022 – August 2022

Contract Price: MK 19, 582, 297.38 ($24,477.87)

Project Stage Involved: Conceptualization, Project Planning, Construction Phase, Practical Completion & Defects Liability Period.

2. Graduate Architect at Zingano & Associates September 2017 – July 2020 2.1 Tasks

• Field surveys

• Drafting and Detailing

• Project coordination & Documentation

• Project Supervision

2.2 Projects

2.2.1 Construction of New Government Office Block at Capital Hill (GOCH 7) Duration 2009 – Present

Contract Price: MK1.02bn ($1,471,376.40)

Project Stage Involved: Construction Phase, Practical Completion & Defects Liability Period. 2.2.2 Construction of the Open Distance Learning (ODL) Centre at Area 47 And Open Distance Learning Hub at Bunda Campus in Lilongwe.

Duration: 2017 – 2020

Contract Price: MK 4.8bn ($5,885,505.60)

Project Stage Involved: Site Mobilization – Present (Construction on going) 2.2.3. Press Trust Design Competition 2018

Design of Press Trust multistory office block in City Center, Lilongwe Position attained: 2nd

2.3.4. Mr. Mbale Town House Design (2018) Design of 4 No. town houses in area 43 Page 3 of 4

2.3.5 Other

Research Paper (2018 - 2020)

“A Continued Examination of the Brick- Block Digital as a Socio –Economic Concern in the Environment and the Construction Industry in Malawi”

3 Meyano Projects (Botswana) October 2017 – June 2017 Position: Graduate Architect Trainee

Duration: 3 Months (June – August 2014) Position: Intern Tasks

• Site surveys

• Detail Drafting

• 3d Modelling

• Presentations

3.3 Architectural Intern at C.P.M Architects (Botswana) June 2013 – July 2013 Tasks

• Site surveys

• Detail Drafting

• 3d Modelling

• Presentations

3.4 Architectural Intern at F.M.A Architects (Botswana) May 2012 – July 2012 Position Held: Intern

Tasks

• Site surveys

• Detail Drafting

• 3d Modelling

3.5 Trainee GIS Technician at Remote Survey and Mapping May 2010 – July 2010 Tasks

• Site surveys

EDUCATION BACKGROUND

2010 – 2016 University of Botswana (Bachelor of Architecture) 2008-2009 Saint Joseph College BGCSE (Botswana,46pts) 2005-2007 Nanogang Secondary School Grade B (Botswana) 2003-2004 Botlhale Primary School Grade A (Botswana) REFERENCES

Charles Azizi

Japanese Tobacco International (JTI)

Project Management Office Supervisor

*******.*****@***.***

Page 4 of 4

Dr B.W Zingano Phd.

Zingano and Associates (Architects) P.O. Box 31039 City Center, Lilongwe

Malawi

**********@*****.***

Fletcher Banda

Zingano and Associates (Architects) P.O. Box 31039 City Center, Lilongwe

Malawi

*************@*****.***

Amit Parikh

Meyano Projects

P.O. Box 40475

Broadhurst, Gaborone

Botswana

**************@*****.***

Mrs. Morobolo

University of Botswana

Thesis Supervisor & Design Studio 1 Lecture

seabo.morobolo.mopipi.ub.bw

MEMBERSHIP

Graduate Architect - Board of Architect and Quantity Surveyors, Reg. No. 763. (Registered in 2018) The International Association of Lions Clubs since 2020 HOBBIES

Socializing with friends, Watching Tv (News, Sports, and Documentaries), Playing Football, Video games & Chess.



Contact this candidate