Post Job Free
Sign in

Civil Engineer Project Manager

Location:
Mecca, Saudi Arabia
Salary:
36000
Posted:
November 15, 2024

Contact this candidate

Resume:

Page * of *

Mohd. A. Naseer - CV **Oct****

MOHAMMED ABDUL NASEER

BE - Civil Engineer

Email: *************@*****.***

KSA No.: +966*-****-**** / +966*-****-****

Member: Saudi Council of Engineers # 96109

Team: *************@*****.***

www.linkedin.com/in/mohammed-abdul-naseer-65b54b78 My LinkedIn QR Code:

Career Summary

I am a dedicated and proactive Civil Engineer having more than 35 years of professional experience in Management, Supervision & Delivery of various EPC, Unit Rate, Design & Built and Turnkey projects constructed & completed in a dependable, punctual & responsible manner meeting the stake holder’s satisfaction in:

Infrastructure projects: have managed Bridges, Underpasses, Asphalt Roads, Box Culverts, Storm Water Drainage Network / Channels, Transmission lines and Utilities works of Stormwater, Sewer, Potable water, Firewater, High/Medium/Low Voltage Power lines, Street Lighting. Treatment Plants & Pipelines: have managed Sewage Treatment Plant, large diameter pipelines of GRP/Ductile/HDPE/RC, submerged underwater pipelines, pump stations, lift stations, Control Valve Chambers, Distribution chambers, Hydraulic & Pressure testing along Mains / Distributions etc. Onshore Constructions: have managed Multi Storied Housing & Commercial Complexes, Hotels, Residential Towers, Industrial Sheds / Hangars, Warehouses, Housing Compounds. Marine Construction: have managed Construction of Quay Walls for Ports / Jetties, Causeways, Seawater Intake & Discharge pipelines, Sea Outfalls, Breakwaters, Beach Resorts, Beach Protection

& rehabilitation etc.

Key skills achievements:

Efficiently manage and supervise projects, demonstrating exceptional organizational and time management abilities, adhering closely to contract and project execution plans across various contract types including EPC, Unit Rate, Design & Built, Turnkey, and others.

Lead project management from conceptualization through operational/handover stages, ensuring client satisfaction by delivering projects within budget, timeline, and in compliance with regulatory requirements.

Conduct thorough reviews of drawings, specifications, method statements, and material data sheets, identifying and resolving design issues and documentation discrepancies to enhance works execution efficiency.

Oversee approvals of contractors/subcontractors' executed works, ensuring compliance with contract specifications and coordinating with other trades, while effectively managing performance evaluations and contract payments.

Oversee and streamline the project's work fronts by prioritizing on-site activities and directing the Contractors Construction team to optimize the execution of construction works.

Strategically engage in negotiations for optimal pricing and payment terms, contributing to cost-effective project execution.

Set and communicate operational targets, providing clear directives to Supervision Consultants/Contractors to maximize project deliverability.

Proactively anticipate and address critical issues, devising mitigation plans to minimize disruptions and ensure project profitability and continuity.

Chair design meetings, progress meetings, and stakeholder engagements, ensuring effective communication and resolution of project-related matters.

Coordinate with contractors to ensure timely provision and allocation of resources, enhancing on-site productivity.

Supervise and manage the design/execution process, collaborating with discipline teams and section engineers to review progress reports and address client/consultant observations. Page 2 of 9

Mohd. A. Naseer - CV 02Oct2024

Lead the resolution of deficiencies with contractors to ensure compliance with designs/specifications/standards and quality requirements.

Foster positive relationships with clients/consultants, resolving issues and ensuring mutual partnership development and maintenance.

Monitor resource productivity and performance, making necessary adjustments to optimize results and achieve project targets.

Ensure compliance with project policies and procedures, overseeing the generation and submission of accurate reports/documents.

Provide leadership in health, safety, and environmental matters, ensuring proper execution of safety protocols and regulations to prevent incidents and promote well-being.

Organize efficient demobilization plans at project phases' end to facilitate smooth handover and closure. Academic Credentials

Bachelor’s degree in civil engineering

Certifications& Memberships

Member of Saudi Council of Engineers

Project Management and Other Software Skills

Primavera P6

Microsoft Project 2013

Microsoft Office Excel

Microsoft Office Word,

Microsoft Power Point

Auto CAD

Oracle Aconex

Major Roles & Responsibilities

Contract Management

Oversee the entire lifecycle of contracts from inception to completion. Ensure compliance with contract requirements, manage performance metrics, handle payments, manage changes and disputes, and ensure client satisfaction.

Procurement Management

Handle the procurement phase, including identifying and selecting subcontractors and suppliers. Manage tender processes including documentation, release, coordination, evaluation, and recommendation reports. Cost Management

Maintain a comprehensive cost register, track budgets, variations, payments, and provide regular reports to clients.

Stakeholder Management

Identify and manage all project stakeholders, understanding their roles, involvement, and requirements to ensure effective communication and collaboration throughout the project. Communication

Chair project meetings, record minutes, assign action items, and ensure timely distribution of meeting outcomes. Provide progress reports to clients and facilitate communication between the project team and stakeholders. Business Development

Contribute to securing repeat business by ensuring client satisfaction and addressing any issues promptly. Actively seek new business opportunities, promote the company to potential clients, and strive to become a preferred service provider in the market.

Page 3 of 9

Mohd. A. Naseer - CV 02Oct2024

Specific Projects Experience in Saudi Arabia

1. Atkins Realis Engineering Consultants

01 August 2022 to Present:

POSITION ASSIGNED: Senior Project Manager – Lagoon Rehabilitation Works Project, Program & Construction Management (PMCM) Consultants

Project: JEDDAH HISTORIC DEVELOPMENT (JHD) Project MINISTRY OF CULTURE (MOC), Jeddah – K.S.A

Project Highlights:

Lagoon Rehabilitation works comprising of:

Dredging of Lagoon basin and widening of the Lagoon area for new Marina

Reclamation of south portion for South Community Neighborhood

Realigning of Lagoon shape based on Marine studies design basis.

Marina Berthing Quay Wall structure.

Development of Marina Neighborhood

Replacement of the existing Revetments for Edge treatment

Marina Floating Pontoons with all Utilities.

Implementation of Water Transport system

Development of Lagoon periphery Landscaping / Hardscaping Job Responsibilities:

Coordinate with Client for the initiation of design requirements based on the Master Planners Conceptual sketch.

Coordinate & organize with the Marine scope Concept Designer HR Wallingford for Design of Lagoon.

Coordinate for the inputs of existing site survey teams with the Master planner & Marine designer.

Manage technical coordination and progress meetings with Concept Designer HR Wallingford and other site investigation teams, stake holders & other consultants.

Review & Coordinate in the development of tender package for the phase 1 - Initial Site Enabling works in parallel to the development of Concept Design.

Manage with Supervision Consultant & Client during the execution of Enabling works on site.

Assigning various project stakeholder information to mitigate the impact of existing utilities.

Review & Coordinate in the development of tender package of phase 2 marine construction works.

Coordinate with the phase 3 design tender for Lagoon surrounding park. 2. Royal Haskoning DHV Saudi Arabia - Engineering Consultancy

15 May 2022 to 31 July 2022:

POSITION ASSIGNED: Resident Engineer

Project Management Consultant (PMC)

Project: YANBU GRAIN TERMINAL – National Grain Company Yanbu Commercial Port, YANBU – K.S.A

Project Highlights:

Complete Grain Terminal works was broadly comprising of:

Earthworks with Soil Improvement works.

12 no’s Flat Bottom Silos each of 10,000 Tons capacity including Raft Foundation on Piles.

Flat Steel Storage Sheds of 60,000 Tons capacity divided in compartments,

Ship Unloader, Head House, Gallery Belt Conveyor with Transfer to Trucks / Storage Silos, Weighing Station, Truck Unloading Station, Truck Bulk & Bagging Station.

Buildings with necessary facilities including Administration office, Workshop, Canteen, Control room, Weigh bridge houses, Guard houses & Truck administration building.

Utilities including Power, Communication, Terminal lighting, Sewerage, Potable water & Firefighting.

Asphalt Roads with all markings, signages, Flood Protection system, Fencing, and Landscaping. Page 4 of 9

Mohd. A. Naseer - CV 02Oct2024

Job Responsibilities:

Organize the project’s work front and direct the Contractor to ensure the start of construction works.

Coordinate with the Client in implementing the Projects operational targets, communicate them to Contractor and provide the necessary guidance in the mobilization.

Supervise / chair all the design meetings, weekly & monthly progress meetings, and other meetings with Client and other Stakeholders.

Coordinate with Contractors, the needed resources to ensure their timely provision on site for their proper allocation and management in a way to boost productivity.

Conduct regular meetings and lead the resolution of deficiencies with the Contractor to ensure compliance of work with the relevant designs/specifications/standards and quality requirements.

Oversee the proper execution of HSE implementation for safety requirements / regulations at all levels to prevent incidents, ill health and safeguard people’s safety. 3. WS Atkins & Partners Overseas Engineering Consultants

27 Jul 2020 to 15 May 2022:

POSITION ASSIGNED: Resident Engineer – Infrastructure & Marine Works Supervision Consultants for program P12 - Marine Infrastructure Development

Project: THE RED SEA DEVELOPMENT COMPANY (TRSDC), UMLUJ – K.S.A Project Highlights:

a) Infrastructure – 3 Bridges on Red Sea connecting Mainland to Shura Island connecting Shura Island with Mainland using Precast I Beams on Cross Heads for Road section & special U Girders for Landscaping pits & Cycling / Walkway Corridors resting on Cast in Situ Piles. Main Bridge on Red Sea of length 1,104.0 LM in 30 spans of approx. 37.0m length, joining to the causeways on either side. Two Supplementary Water Circulation Bridges of single span of 37.0m in mid causeways b) Infrastructure Road Works - Asphalt Access Roads on causeways, Islands Internal Access Roads, Interlocking Pavements &, Jetty head High Mast lighting, Street Lightings, Utilities, etc. c) Infrastructure – 6 Marine Jetties with Quay Walls & Causeway works Jetty Head Interlocking Pavements, Asphalt Road Works, Access Roads, Islands Internal Access Roads, Jetty head High Mast lighting, Street Lightings, Utilities, etc.

i) 2 Jetties & Access Road on Causeways @ Mainland ii) 4 Jetties with Causeway Access Roads on @ various Islands d) Dredging of Access channels / Lagoons / Island Internal Canals / Excavations using Cutter Suction Dredger / Backhoe Dredger / Long Boom Excavators.

e) Bunds Formations for Reclamation from the Dredged Material f) Reclamation / Backfill of Islands with dredged fill material for Buildings / Hotels / Villas / Golf Play Area

/ Utilities and Soil Improvement at the following Islands. g) Soil Improvement of reclaimed / backfilled areas using Dynamic & Rapid Compaction methods. h) Beaches – Construction of new beaches, Realignment & Rehabilitations of existing sand beaches. i) Mangroves - Removal & Relocation at various places j) Corals – Removal, Relocation & Reattachment on green concrete boulders using glue sticks on islands. k) Artificial Island Creations with Rock revetments and Beach Sands near Sheybarah Island Job Responsibilities:

Supervising the whole team of engineers as Team Leader (Resident Engineer) for the Site Supervision for the Infrastructure Bridge & Marine Works for various contracts & different Contractors, ensuring the desired project objectives are delivered.

Coordinate the inputs of project stakeholders to ensure successful delivery of project elements.

Coordinate the execution between Engineering, Architectural and Civil/Structural disciplines.

Apply / implement the overall management principles and processes especially the quality part.

Providing strategic planning advice in relation to the requirements for phasing of infrastructure works and the sequence of works.

Attending weekly & monthly progress meetings with Clients and other Stakeholders and presenting the progress reports

Manage technical coordination meetings with Contractors and project staff. Page 5 of 9

Mohd. A. Naseer - CV 02Oct2024

Manage and resolve site planning, coordination issues & site works in accordance with the approved Baseline schedules & Master Program.

Manage the implementation of site-based approval protocols to ensure that infrastructure is completed in accordance with the design, specification and quality requirements. 4. Maher Hassan Al Magamsi Gen. Cont. Est.

06 Dec 2019 to 24 July 2020: All company Projects

POSITION ASSIGNED: Senior Projects Manager

Project Highlights:

Several residential buildings, Façade works, Interior Finishing projects, and a complete Industrial Factory with Storage Sheds.

Job Responsibilities:

Manage the administration of existing Onshore projects of Industrial Sheds, Factory Warehouse, Multi storied mixed use complex etc. with performance reviews, managing contract payments & changes in accordance with contract requirements, disputes management & resolutions in accordance with contract requirements. In house coordination with various departments of design, procurement, finance, logistics etc. Assist in securing the Client satisfaction with the service being provided. 5. Huta Hegerfeld Saudia Ltd. – Onshore Projects Division

& Huta Marine Works Ltd. – Offshore Projects Division

16 Oct 1994 to 28 Nov 2019: {25 years + 42 days}

Project 13:

Engineering & Proposals Department - Huta Group Head Office, Jeddah K.S.A. POSITION ASSIGNED: Project Manager

Job Responsibilities:

Review / Supervision of proposals for different jobs for the estimated quantities, acquired quotations from different material suppliers, preparation of cost estimate, final pricing & submission of the proposal bid.

Review the preparation of project start up activities for new works like itemization of activities for mobilization, procurement, preparation of preliminary schedule of works, client’s requirements, kick-off meeting presentation etc.

In house coordination with different departments of design, procurement, finance, logistics etc. To coordinate for site mobilization, material procurement, follow-up with suppliers for material procurement, work progress on site & to coordinate for contractual issues with the designers, consultants, or client.

Project 12:

FLOOD CONTROL SEA OUTFALL STRUCTURE - KAUST, Thowal Town Development K.S.A. POSITION ASSIGNED: Project Manager

Client: King Abdullah University (KAUST) Consultant: Saudi Aramco 27 Aug 2012 to 05 Nov 2015: Total project value: SR 42.00 million Project Highlights:

Project comprises excavation & dredging at the shore of Red Sea in Thowal town, soil improvement with geo-grid & Geo-Textile layer, Stone bed and Installation of 15,457 cu.mtr plain concrete precast Antifer blocks in steps to allow the smooth flow of flood water in the sea.

Project 11:

SEA WATER INTAKE & DISCHARGE PIPES REINSTATEMENT – KAUST, Thowal, K.S.A. POSITION ASSIGNED: Project Manager

Client: King Abdullah University (KAUST) Consultant: Saudi Aramco 30 Aug 2013 to 30 Apr 2014: Total project value: SR 7.20 million Page 6 of 9

Mohd. A. Naseer - CV 02Oct2024

Project Highlights:

Dredging in the Red Sea shore area to lower the 1.20m Dia - 3 no. of HDPE Pipes comprising of 2 Intake pipes, 1 Discharge Return pipe and related Chlorination pipes which were displaced due to the deposition of silt & mud from the Lake Cleaning Activity in the area behind the KAUST Seawater RO Plant Pump Room without stopping the plant operation.

Project 10:

Infrastructure BRIDGE on Prince Majid Street connecting to King Abdul Aziz Airport Flyover, Jeddah K.S.A.

POSITION ASSIGNED: Zone 1 - Project Manager

Client: General Authority of Civil Aviation (GACA) Consultant: Atkins 27 Mar 2012 to 26 Aug 2012: Total project value: SR 57.000 million Project Highlights:

Preparation works for the 1535m Long Bridge with 40m spans cast in Situ viaduct leading to the new airport with Cross Head Beams with Post Tensioning system.

Project 09:

Infrastructure BRIDGE on Prince Majid Street intersecting with Sari Street, Jeddah K.S.A. POSITION ASSIGNED: Project Manager

Client: Jeddah Municipality (Amana) Consultant: MTMM / Saudi Parsons 01 May 2010 to 26 Mar 2012: Total project value: SR 78.981 million Design and Built of Flyover Bridge - 635m Long Bridge of 8 X 40.0m spans with Pre-stressed U Shape Precast Beam Girders of avg. weight 165 Tons, placed & stitched with Cast in Situ Cross Head Beams using Pre-stressing & Post Tensioning system.

Project 08:

JETTY & FLOATING DOCKS for Thowal Town Development @ KAUST, Thowal K.S.A. POSITION ASSIGNED: Senior Coordinator & Planning Manager Client: King Abdullah University (KAUST) Consultant: Saudi Aramco 15 Jan 2008 to 30 Apr 2010: Total project value: SR 111.00 million Project Highlights:

Design & Built for Dredging in the Red Sea, Construction of Fishing & Coast Guard Jetty with Precast Concrete blocks for Quay Wall and Installation of Floating Dock systems for Thowal town fishermen & Coast Guard Boats.

Project 07:

Infrastructure BRIDGES # 1 & 2 for Bay La Sun Infrastructure in King Abdullah Economic City, Jeddah

POSITION ASSIGNED: Senior Coordinator & Planning Manager Client: King Abdullah Economic City Consultant: Dar Al Handasa Consultants 15 Jan 2008 to 30 Apr 2010: Total project value: SR 82.642 million Project Highlights:

Design and Built of Box Girder Bridges above artificially dredged sea water canal channel connecting the Main Areas of the new King Abdullah Economic City being developed near Rabegh, Jeddah.

Project 06:

Infrastructure ACCESS RAMP BRIDGES to Jamarat Bridge in Mina, Makkah K.S.A. POSITION ASSIGNED: Senior Coordinator & Planning Manager Client: Ministry of Haj Consultant: Dar Al Handasa Consultants 1 Nov 2005 to 14 Jan 2008: Total project value: SR 281 million Page 7 of 9

Mohd. A. Naseer - CV 02Oct2024

Project Highlights:

Access Ramp Bridges connecting to each of the 4 floors of Jamarat Building with a total bridges deck area of 183,220 m2, using pre-stressed Precast T-Beam Girders (max 80 Tons weight) having varying spans of 21mt - 36mt and resting on Post Tensioned Cross Head Beams above 196 Piers & 340 L.M Abutments. The T-Beams were connected with top composite deck slab with Precast slabs units and Cast in Situ Top Slab.

Project 05:

Infrastructure UNDERPASS on King Abdullah Road & BRIDGES @ Ground Level crossing of Khalid Bin Waleed Street & Madina Road – Jeddah, K.S.A. POSITION ASSIGNED: Project Manager

Client: Jeddah Municipality (Amana) Consultant: Saud Consult 1 Oct 2004 to 31 Oct 2005: Total project value: SR 130 million Project Highlights:

Underpass for a length of 1,400mt on King Abdullah Road having Raft foundations with 40.0m deep Friction to hold the Uplift pressure and normal Retaining Wall sides following the profile of ramp. 2 Bridges @ ground level crossing intersections of 45mt span X 32mt wide having Post Tension / Void Formers and using BBR Netherlands Pre & Post Tensioning System.

Project 04:

AL-KHUMRA SEWAGE TREATMENT PLANT # 3 (150,000 cu.m / day), Jeddah, K.S.A. POSITION ASSIGNED: Project Manager

Client: National Water Company (NWC) Consultant: Zuhair Fayez & Partners Consultants 06 Apr 2000 to 30 Sept 2004: Only Civil Contract Value: SR 83 million Project Highlights:

Construction works of Sewage Treatment Plant for 150,000 m3 per day capacity with Inlet Screen, Aerated Grit Chamber, Diffused Aeration System, Final Clarifiers, Sludge Thickeners, Sludge Belt Press Dewatering, Effluent pump station, Internal process flow pipelines and Cabling works. Execution of DN 1600mm – PN16, GRP Effluent Water 16.80Km Pipeline from Al-Khumra Sewage Treatment Plant to the Red Sea Outfall Station. Effluent Dispersion pipeline at seabed for 2.1 km of Dia 1600mm in Red Sea for due consideration of marine life. Infrastructure facilities inside the plant consisting of Asphalt Roads, Street Lightings, Irrigation system, Fire Fighting system, High / Medium / Low Voltage Cabling, SCADA control system, etc.

Project 03:

SEA BREAKWATER for SHEIKH A.A.A. BEACH PALACE @ North Obhur, Jeddah, K.S.A. POSITION ASSIGNED: Project Manager

Client: Sheikh Abdul Aziz Palace Office Consultant: J & P Group Consultants 07 May 1999 to 21 Feb 2000: Total project value: SR 8.37 million Project Highlights:

High Wave Forces Breakwater for Palace protection with the construction of Jetty and Breakwater concrete precast Antifer blocks. The sea transportation & Installation of blocks in Red Sea, Navigation Poles, Filter beds and Beach rehabilitation.

Project 02:

SEA WATER INTAKE PUMP STATION for Saudia City Desalination Plant, Jeddah-K.S.A. POSITION ASSIGNED: Project Manager

Client: Saudi Arabian Airlines Consultant: SKAB Consultants 14 Nov 1998 to 14 May 1999: Only Civil Contract Value: SR 4.2 million Project Highlights:

Turnkey works for Sea Water Intake @ -16m below Mean Sea level with underwater construction up to Shore Pump house building of 40,000 m3/day capacity Seawater Desalination Plant for Saudi Arabian Airlines Housing City.

Page 8 of 9

Mohd. A. Naseer - CV 02Oct2024

Project 01:

HOTEL The VENUE @ Jeddah Corniche - K.S.A. (Previously WESTINN Jeddah) POSITION ASSIGNED: Project Manager

Client: Sheikh Nael Sheriff Al Harithy Consultant: Al Alamah Consultants 16 Oct 1994 to 31 Oct 2001: Only Civil Contract Value: SR 56.67 million Project Highlights:

EPC Civil Works of Five Star Multistoried Hotel Complex with all amenities and facilities: 19 floors Hotel tower with all the amenities / requirements of a five-star hotel 15 floor Residential tower with Furnished Apartments served from the Hotel 4 floor Function Hall with main circular function hall of 42.0M diameter x 9.0M high with Dome Ceiling and additional Floor for additional Men’s Dining Facilities. Swimming pool with all amenities. 6. Project Management & Development Company

07 May 1993 to 15 Oct 1994: Projects Department

POSITION ASSIGNED: Project Planning Engineer

PROJECTS ASSIGNED: 1. SALHIA BEACH RESORTS Total project value: SR 107 million North Obhur, Jeddah (Commercial Beach Resorts)

2. LOTUS BEACH PARK Total project value: SR 77 million North Obhur, Jeddah (Private Beach Housing Compound) Job Responsibilities:

Review design drawings, specifications, project specific requirements & documentation with the team.

Supervise & manage the process of design / execution of works, cooperate with all discipline team and section engineers to review the progress reports.

Identify problematic design issues or other discrepancies.

Ensure conformity to the requirements.

7. Saudi Binladin Group

15 Sept 1992 to 06 May 1993: Architecture & Construction Division - Projects Planning Department.

POSITION ASSIGNED: Planning Engineer

PROJECTS ASSIGNED: 1. Prince Sultan Khaldia Palace, Jeddah. 2. Prince Sultan Azizia Palace, Riyadh.

3. Thowal Beach Palace, Jeddah.

4. Sheikh Bakr Binladin Villa, Madinah.

5. Sheikh Noor Rahimi Villa, Madinah.

Job Responsibilities:

Monitoring critical activities based on the project schedule and advise project management. Preparing and submitting updated work program, identify areas of weakness and establish means of recovery.

Weekly and monthly work progress report.

Performing other duties and responsibilities as may be assigned from time to time. 8. Al Fayha General Trading Contracting

01 Apr 1992 to 14 Sept 1992

POSITION ASSIGNED : Project Engineer – External Infrastructure Works

PROJECTS ASSIGNED : King Abdul Aziz University, Health Sciences Center, Men’s Academic Research Facilities, Jeddah – K.S.A. Job Responsibilities:

Supervise the Infrastructure works of External Tiling Pavement and Cladding of GRC precast panels and Marble slabs.

Page 9 of 9

Mohd. A. Naseer - CV 02Oct2024

Experience in India

9. Radiant Construction Syndicate, Hyderabad - INDIA.

01 Dec 1988 to 20 Mar 1992:

POSITION ASSIGNED: Project Engineer

PROJECTS ASSIGNED: 1. Pasha Court - Multistoried Residential Complex, Hyderabad. 2. Regency Diapers Factory - Industrial Shed & Buildings, Hyderabad. 3. Chermas Complex – Garments showroom & store Hyderabad. Job Responsibilities:

Supervise & manage the construction works of Buildings & Industrial Sheds including Fit Out & MEP. Language

English - excellent writing & speaking.

Arabic - moderate writing and average speaking

Urdu - mother tongue

Hindi - native Country language

Telugu - native State language

Personal Dossier

Name: Mohammed Abdul Naseer

Nationality: Indian

Marital Status: Married, Two Children (One Married)

Present Residence: Jeddah, Saudi Arabia

Iqama Status: Transferable

Driving License: Valid Saudi Driving License

References:

References can be made available upon request from Consultants & Clients. 1. Mr. Joe Corcoran: SRE Jacobs, Riyadh: +966*-****-**** - ***************@*****.*** 2. Dr. Ehab Abdou: JHD Project Director Atkins Realis: +966*-****-**** 3. Mr. Maher Abdul Hadi: Construction Director, Airport Engineering Services: +966*-****-**** 4. Mr. Farooque Yakub Mohammed: General Manager MHM Cont., Jeddah: +966*-****-**** Postal Address:

Contact Address in Saudi Arabia:

MOHAMMED ABDUL NASEER,

Senior Project Manager, Atkins Realis

Apartment # 23, 4th Floor, Building # 3662

JCRB 3662, Umm Al Berak street

Al Rehab district, JEDDAH – 23344,

KINGDOM OF SAUDI ARABIA

Contact Mobile #: +966*-****-**** / +966*-****-****. Contact Email: *************@*****.***

The above information is true to the best of my knowledge. Mohammed Abdul Naseer



Contact this candidate