Armando Morales
**** ********** **** # *** ****** Chapel, Florida 909-***-****
*********@*****.***
Work Experience
Out of Country November 2022 to June 2024
Technology Designer
IMEG Corp. January 2019 to November 2022
Riverside Unified School District, Walnut Unified School District, Fresno Unified
School District, Manhattan Beach Fire Station, San Bernardino School District,
Chase Bank, USC Keck Hospital and many other sites
Design technology systems, Intrusion, Video surveillance, Public address, Structured cabling, AV systems and other system per Architect and Clients project requests.
Interior/Exterior conduit pathways, Riser Diagrams, Equipment list, Equipment design and MDF/IDF designs.
I have been involved in the initial Promotional with the proposed clients.
Attend initial phase of design and review meetings with the Architect and clients.
Pre design and pre construction on site field take off meetings for initial design.
Job site observation for the quality of workmanship based on the Architect plans.
The current designs are produced from the Bluebeam software
Project Manager
AVI-SPL Inc. October 2017 to July 2018
Coretrust, Los Angeles.
The 6th floor showroom for the US Bank Building. Installed 300 stations with (3) Cat6 cables per station.
Installed (26) WAP location for this project
Installed (1) wall mount open swing rack.
Casa Pacifica, Camarillo.
Installed (2) Cat 6 cables to 150 stations. Installed (1) wall mount cabinet in the new IDF location.
Installed (1) 12 strand SM fiber backbone cable to the existing MDF location
Installed (12) WAP locations.
Beyond Limits, Glendale.
Installed (3) Cat6 cables to 300 stations.
Installed (2) 7’, 19” relay racks in new MDF location
LA Tourism, Los Angeles.
Installed (2) Cat6 cables to 360 stations.
Installed (2) 7’, 19” relay racks in new MDF location
Synacore, El Segundo.
Installed (3) Cat6 cables to 150 stations.
Installed (1) 7’, 19” relay racks in ne MDF location
Knight Law, Los Angeles.
Installed (2) Cat6 cables on the 24th and the 25th floor with a total of 600 cables.
Build out a MDF and one IDF. Installed 12 mm fiber cable link between both floors
Other Projects; Staylinked - Irvine, Beachpoint - Santa Monica and Sirvious -Torrance.
Project Manager
Intelinet Inc. July 2014 to June 2015
Subaru Costa Mesa.
This project had (1) Cat 6 cables per175.
Installed 8 WAP locations.
Installed (1) 7’, 19” relay racks in new MDF location
Jaguar Land Rover Irvine.
This project was a (2) Cat 6 190 station with 1 voice cable and 1 data cable and a MDF build out on second floor. 15 AP locations.
Cal Poly Pomona.
WAPS project. Installed 12 outdoor WAP’s campus wide.
Other Projects.
City of Anaheim, Praxair, Ross Department and Kraft foods
Project Manager
BEC INC. November 2013 to June 2014
Nantswork Inc.
This project was 300 station (2) Cat-6e cables per station.
Installed 16 WAP locations.
MDF build out and (2) IDF build out.
Installed (2) 12 mm fiber and 100 pair copper backbone. 3 story building.
Irvine Company. Newport Beach
Installed a fiber and a copper backbone for a 20 story building and parking structure.
Qantas Lounge. LAX:
Installed 175 stations with (2) Cat6 cables.
Installed (2) 7’, 19” relay racks in new MDF location
Fiber and Copper backbone to 3 IDF's. 8 AP locations.
Other Projects.
LA County Med Center Lancaster closed out last 30 percent of this project, UC Irvine and ICANN Inc.
Project Manager
T and D Com November 2012 to June 2013
Technical Consulting Group.
This project was a 500 station project with (2) to (4) cables per station,
Installed 30 wireless WAP locations.
Installed (2) 7’, 19” relay racks in new MDF location
Walgreens Distribution Moreno Valley.
Installed 271 WAP wireless location which Included cabling and installation of the AP unit from 6 feet up to 50 feet high.
Project Manager
Kaiser Permanente April 2002 - October 2012
I was responsible for all cabling projects in the following Kaiser Service areas, South Bay, Bellflower, Sunset, West Los Angeles, and any new construction project. I was also responsible for Estimating small scale project and large scale project like Anaheim Hospital VOIP project with up to 7000 mod taps. Other duties included managing from 11 Technicians up to 45 technicians which included day to day scheduling, Weekly timecards for payroll and also procurement of material for all projects.
Project Manager, Estimator and Material
Kaiser Permanente April 2002 - 2009
I was responsible for all cabling projects for the following Kaiser Service areas, South Bay, Bellflower, Sunset, West Los Angeles, Panorama City and Woodland Hills and any New construction project like Sand Canyon Hospital project.
Other Project Experiences
Anaheim Hospital Campus:
Project Manager, Estimator and Material procurement. Also installed Video Conferencing cable, installed cabling for the Wireless Network and Philips systems, CATV, Fiber Optic Backbone, Voice Feed Backbone, OSP voice backbone, Extended T1 lines for network equipment and Installed Relay Rack per OSHPD requirements.
Sand Canyon Campus:
Project Manager and Project Foreman. Also installed Video Conferencing cable, installed cabling for the Wireless Network and Philips systems, CATV, Fiber Optic Backbone, over 10k Voice Feeder Back bone which included splicing cables in various TR, OSP voice backbone, Extended T1 lines for network equipment and Installed Relay Rack and ladder tray in 29 TR's and built out a 40' x 80 TER room which also included 26 cabinets per OSHPD requirements. Installed security cabling for the 6 story HSB building which also included terminating the station side devices.
Other Projects.
Harbor City Coastline MOB, Diamond Bar MOB, Independence Park Office Building, Mission Hills MOB,
East LA MOB, Santa Clarita MOB, Santé Fe Springs Medical Records Building and WLA Robertson MOB.
Education
Graduated from Redondo Union High School. General Education.
References.
Upon request.