Post Job Free
Sign in

Construction Manager On-Site

Location:
Livermore, CA
Posted:
November 13, 2024

Contact this candidate

Resume:

RICK C PERRY

*** **** ****** *********, ** *****

925-***-**** ***********.***@*****.***

Construction Manager with a record of success overseeing all phases of construction projects for Government, Commercial & Residential. Experience includes managing crews up to 20+ in demolition, excavation, paving- stone/concrete/Asphalt paving, electrical, plumbing & carpentry. Backed by strong credentials and a history of on- time, on-budget and high-quality project completions. LICENSE & CERTIFICATION

(CSLB) B-1 General Contractors, C-10 Electrical & OSHA 10 STRENGTHS – SKILLS – ABILITIES

Extreme attention to detail and ability to juggle multiple projects with timely solutions

Ability to apply broad knowledge and exercise independent judgment

Strong interpersonal, communication and writing skills PROFESSIONAL EXPERIENCE

AMARANT PROFESSIONAL DESIGN & BUILD SERVICES, INC. Dublin, California Site Construction Superintendent Dec 2022 – Current

Supervised and directed all aspects of on-site construction to ensure deadlines were met for inspections and on budget for completion

Coordinated the daily operations of multiple projects at various locations while simultaneously leading In-house professional skilled workers in electrical, plumbing, carpentry, tile and cabinets

Problem solved and collaborated with project management to ensure design details and structural engineering specifications were met according to California Building Code

Identified risks and troubleshoot issues as they appeared with modified solutions

Maintained a weekly report, shared project status (ie., costs, schedules, materials) with project manager and picture documented daily activities onto Builder Trend with notations THE ADDRESS COMPANY Walnut Creek, California

Site Construction Manager/Superintendent Dec 2019 – May 2022

Managed the build of 18+ luxury custom homes including full landscaping with outdoor covered kitchens ranging from $1.75 to 4 million on three separate communities with six houses per development

Directed all construction projects on-site from inception to move-in and made daily decisions with close communication with the Project/Design Manager to ensure project deadlines were met within budget limitations, maintained schedules and assured that there was a minimum final punch list

Consulted with designer architects, surveyors, and engineers to resolve design issues and day to day challenges to maintain building schedules despite material and labor shortages throughout Covid-19 pandemic

Coordinated all underground utilities (sewer, storm drainage/bio retention, water, electric, gas, phone/cable, curb/gutter, and street paving)

Finalize and re-configure as builds to reflect changes in design while maintaining close communication with city building inspectors for final close outs along with picture documentation Project Highlights

Bio-retention Ponds to filter all runoff water, Installed Solar Panels, Fully Landscaped Front/Back, Covered Front/Back Patios, Outdoor Barbeques, Gas Fire Places, Cathedral Ceilings with large beams and Sound System SANDIA NATIONAL LABORATORY Livermore, California

Construction Manager Feb 2017 - Nov 2018

Worked cross functionally with project management & engineering firms ensuring projects were completed at or surpassing standards and within their allotted budget

Facilitated pre-construction meetings including creating an agenda, recapping discussion, and compiling a project file

Oversaw design & construction quality through comprehending plans, specifications, and contract terms

Obtained all permits (i.e., hidden hazards, asbestos, and environmental) prior to initiating project and ensured code compliances approved

Acquired daily photographs documenting work activity before final closure (i.e., trenches, wall, and ceiling interiors) and provided a status on the three week look ahead Project Highlights

High security VTR lab, Major grading, New parking lot with LED lighting and Charging stations, Repaved streets, Rewired labs with LED lighting, Scoped/documented plans for Site wide sewer/water replacement, Replaced concrete/asphalt paving, and many Electrical/plumbing projects throughout CORNERSTONE CONSTRUCTION Livermore, California

Owner & Manager (CSLB 423718) 1981 --Present

Residential and Commercial construction – Led the planning, budgeting, and direction of all construction projects from a referral basis only

Experienced in full on-site construction management and land development; effectively scheduled, monitored, and inspected all work from start to finish

Attained lasting business relationships with architects, engineers, developers, inspectors, city officials and clients

Produced estimations, conserved budgets, and oversaw project management, RFI’s, change orders and any required ad hoc on and off the construction site

Obtained compliance certifications prior to initiating all projects Project Highlights

Electrical, Plumbing, Carpentry, Additions, Remodeling, Commercial TIs, Inter locking paving stones, Retaining walls, Masonry, Concrete, Landscaping, Custom Home Hill Side Pads, Grading & Excavating LAM RESEARCH Fremont, California

Facilities Supervisor/Manager 1983 – 1987

Managed General Contractor and all Sub-Contractors to see that budget and schedules are in order

Communicated with Union Contractors directly to bid, design and oversee construction of three new 31,000 sq. ft. buildings and 156,000 sq. ft. building comprising of offices, labs, production, clean rooms, R&D, equipment rooms and building tentative improvements

Personally installed120/208 volt and 277/480-volt panels, EMT conduit, pumps, motors, starters, outlets, and lighting throughout the pump corridor to save on Sub Contracts

Managed a team of 20 employees within facilities including security and janitorial

Utilized budget expense reports to create cost saving projects Project Highlights

Designed Class 10 Clean Room, Full Kitchen/Cafeteria, State of the Art Roof mounted Gas Scrubber, Employee Weight Room, Volley Ball/Basketball Courts, outdoor Seating Areas and Water Feature APPLIED MATERIALS Santa Clara, California

Facilities In-house Electrician 1979—1983

In-house electrician for 14 of their buildings, starting with the first building at 3050 Bowers Avenue

Wired test stations for reactors that are used to etch wafer circuits that use 480 volt with 400 amp each

Performed office tenet improvements, 277 volt lighting, 120 volt outlets and new 120/208 volt panels

Wired machine shop and production line equipment, maintained compressors, scrubbers and generators EDUCATION

Ohlone College – AA, Construction Business Management

University of Toledo – Electrical Engineering



Contact this candidate