Post Job Free
Sign in

Site Manager Project

Location:
Maplewood, NJ
Posted:
November 12, 2024

Contact this candidate

Resume:

Francisco X. Castro Chevere

**** ********* *** *** #* · Bridgeport, CT 06605 · Cell # 787-***-**** · E-mail: **************@*****.***

Site Manager

CCI Contractors callers inc (PSEG)

• Lead and manage the installations team responsible for the deployments of metering systems

• Plan and schedule installation operation to ensure projects are executed in a timely manner

• Oversee training and development of technicians in meter installation

• Conduct site assesments and inspections to ensure complience with safety regulations and quality standards

• Prepare and present progress report to senior management highlighting accomplishment and any potential issues

Posigen CT Solar Installation Inspector

• Conducted thorough inspection of residential,commercial solar panel installation to ensure compliance with safety codes,industry standarsand company specifications.

• Documentation &reporting: prepared detailed inspections report, including Photos,findings and recommendation for any necessary corrections or improvements.

• Technical troubleshooting: identify and resolve technical issues and installations,advising and corrective actions to enhance system performance.

Storti Quality Servises, Bronx Service line inspector (SLI)

• Gas leak survey technicians conduct required safety inspections on designated natural gas systems providing quality service to meet the utility client’s compliance standards.

Aclara Smart Grid,Bronx Field Supervisor Aug2019-Mar2022

• Training installers in proper safety of gas (imu) & electric meter installation.

• Making daily work assignments to electric and gas installers.

• Transferring new meter inventory to installers supervising end of day meter inventory drop off process.

• Resolving problem tickets in a timely manor including escalations to customer.

• Performing required safety inspections, tailboard sessions prior to work and in the field, as well as ensuring project resources follow the required safety practices and installation processes.

• Evaluating installer performance and ensuring required efficiency is being achieved.

• Meeting deployment schedule.

• Achieving standards of safety, productivity, and quality of work.

• Mentoring and guiding installation crews, achieving low employee turnover and high morale.

Aclara Smart Grid, Bronx, NY Quality Auditor Jan 2019-Aug2019 Inspect electric and gas smart meter installations performed by installers to ensure meters are installed by guidelines

• Consistently hit the monthly audit target as established by the Project Manager

• Assist with new hire and ongoing training of installers

• Document and report quality issues, including accidents, near misses and unsafe acts and unsafe conditions during the installation process to supervisor

• Perform duties utilizing the required and appropriate personal protective equipment (PPE)

• Full participation in safety training and the ability to understand and follow directions identified in the Job Hazard Analysis (JHA), PPE Assessment, Material Safety Data Sheets (MSDS) and all Safety Procedures and Alerts

Aclara Smart Grids, Mount Vernon, NY (con-ed) Gas & Electric Meter Installer Sept 2017-Jan 2019

• Provide excellent customer service by explaining and answering questions on the new AMI smart meter device and on procedures of installation in commercial and residential areas. Became OP qualified to install gas IMU for Coned AMI Project

• Install and rewire A-base Residential and commercial smart meter .

• Accurately read meters and document exchanges in Profield Encore.

• Perform all required testing procedures to replace electric and gas meters.



Contact this candidate