Post Job Free
Sign in

High Voltage Fire Alarm

Location:
Quinapondan, Eastern Samar, Philippines
Posted:
November 12, 2024

Contact this candidate

Resume:

JIMMY CATUGDA LEONA

WhatsApp No. +243*********

Email address: **********@*****.***

POSITION DESIRE:

OBJECTIVE: To join a company where I can both acquire extensive technical experience and became globally competitive in the field of engineering works, and to render my outmost ability with all diligence and integrity as part of my contribution for the enrichment and growth of the company.

PERSONAL INFORMATION

Date of birth : October 30, 1978

Place of Birth. : Quinapundan E.Samar

Height : 5'8"

Weight : 150lbs.

Civil Status : Married

Religion : Seventh day Adventist

Gender : Male

Nationality : Filipino

Contact Person : Amor Leona

Address : Quinapondan eastern Samar

Contact No. : +639*********

Language Spoken : English / Tagalog

EDUCATIONAL BACKGROUND

FROM YEAR ( 1996 – 2001 )

SCHOOL NAME – Eastern Samar State University

COURSE - Bachelor of Science in Electrical Engineering (BSEE) DATE GRADUATED: March 2001

TECHNICAL SKILLS

• Electrical Estimate Using Plan Swift

• Preparing of daily manpower schedule

• Site supervision and implementation of safety standard

• Making accomplishment reports

• Monitoring of Electrical Equipment

• Knowledge in AUTOCAD

• Instrumentation works Design, Installation, Testing and Commissioning

• Wiring and installation of variable frequency drive and programming

• Design of any control sequences, Termination of electric motors low or high voltage connection

• Design and Supervision and implementation of high voltage works such as bus ducts, power transformer, high voltage switchgear, cable trays and cable terminations.

• Design of any control wiring diagrams and PLC programing

• Design of control diagram using variable frequency drive (VFD) interconnected with PLC and installation.

• Making control diagram for any machines that need control sequences and installation.

• Making control diagrams for BMS system interconnected with fire alarm system and HVAC system.

• Making design for controls and automations

• Testing and commissioning of medium voltage, low voltage & high voltage

• Testing and commissioning of fire alarm system, BMS and HVAC system

• Testing and commissioning for machinery and automation

• Knowledge of petrochemical plant instrumentation and controls project

• Preparing project billing and evaluation billing from the contractor

• Site inspection for electrical works

• Preparing RFI & RFA for the project

• Design, shop drawing as built plan and shop drawings for project approval

• Evaluation of contractor project accomplishment

• PLC Programming

• Generator Synchronization programming

• Making control diagram for COMAP & DEEPSEA controller for generator synchronization

• Solar system configuration, testing and commissioning PHILIPPINES PROJECT ACCOMPLISHED

1. SM & Building Project- 2004-2005 ( SM MALL OF ASIA & KCC MALL GENERAL SANTOS CITY)

2. Market Market- 2005-2006

3. Sulphurex processing plant Substation - 2006-2007 (PEPMACO PLANT) 4. Electromechanical preventive maintenance- 2007-2008 (CBRE PHILS. & JARDINE PHILS.)

5. Power house 3.0MVA Distribution line- 2008-2010 (PEPMACO LANT) 6. Sulphurex plant Expansion- 2008-2010 (PEPMACO PLANT) QATAR PROJECT ACCOMPLISHED

FEB 2010 to AUG 2010 (DOHABANK TOWER 25

TH

FLOOR)

CONTROLS

• Design and estimate, MCC Panel assembly, contactors, relays, variable frequency drive and phase sequence including wiring termination testing and commissioning.

• Making daily schedule of manpower and supervision

• Testing and commissioning of HVAC system

• Preparing daily work schedule for manpower

• Conduct supervision

• Preparing as built

AUG 2010 TO MARCH 2011 (DOHA BANK TOWER)

BMS

• Making control design for BMS

• Installation of BMS panels

• Wiring and termination

• Installation of BMS instrument for AHU and chiller

• Testing and commissioning

• Making daily manpower assignment and supervision

• Preparing as built

• Conduct toolbox meeting every morning

MARCH 2011 TO AUG 2011 (HILTON HOTEL 25

TH

STORY)

FIRE ALARM AND HVAC SYSTEM

• Design, estimation and progress billing

• Testing and commissioning

• Making daily manpower assignment and supervision REPUBLIC DEMOCRATIC OF CONGO (CENTRAL AFRICA)

PROJECT ACCOMPLISHED

AUG 17, 2011 - Feb 11, 2013 (FOOD PROCCESSING PLANT SUBSTATION) SCOPE OF WORK:

• Supervision and making daily works schedule

• Monitoring of quality works as per electrical standard

• Testing and commissioning of electrical equipment such as transformer, UPS and batteries, LVSG, MVSG, and bus duct

• Installation of cable trays, wirings for milling motors, automations and testing commissioning

Feb 13, 2013 - April 30, 2013 (BARWA CITY PROJECT EAST AND WEST SCHOOL)

CCTV CAMERA SYSTEM & ACCESS CONTROL SYSTEM

SCOPE OF WORK:

• Design and Estimate

• Supervision and making manpower daily schedule

• Conduct as built plan

• Testing and commissioning

REPUBLIC DEMOCRATIC OF CONGO (CENTRAL AFRICA)

May 20, 2013 - December 28, 2016 (FLOUR MILLS FACTORY) AUTOMATION AND HIGH VOLATAGE WORKS

SCOPE OF WORK:

• Supervision, installation, wirings and terminations cables for automation and high voltage system

• Testing and commissioning

• Conducting preventive maintenance of electrical equipment Feb 13, 2017 – January 25, 2019 (Canyon De Boracay Hotel) Boracay Caticlan PROJECT MANAGEMENT

SCOPE OF WORK:

• Design and Estimate

• Billing evaluation from the contractor

• Conduct site Inspection

• Evaluation of weekly progress report from the contractor

• Monitoring and inspection of contractor daily activities JANUARY 25, 2019 up to present (MINO CONGO MILLING PACTORY & KINTECH ENGINEERING)

SCOPE OF WORK:

• Supervision and making daily works schedule

• Monitoring of quality works as per electrical standard

• Testing and commissioning of electrical equipment such as transformer, UPS batteries, LVSG, MVSG, and bus duct

• Installation of cable trays, panel boards, wirings and terminations for milling motors, automations, testing commissioning

• PLC programming

• Generator Synchronization programming

• Solar System configuration, testing and commissioning EMPLOYMENT

Position: Electrical Engineer

Company: Hyper volt Electrical Contractor

Address: Quezon City

Date: October 17, 2003 to December 21, 2004

Position: Electrical Engineer

Company: Kaizen E and M Corporation

Address: Pasay Road Makati City

Date: January 2005 to October 2006

Position: Electrical Engineer

Company: Unitec Resources Inc.

Address: Pres. Querino Ave. Pandacan, Manila

. Date: November, 2006 - January, 2010

Position: Electrical Supervisor

Company: EMEQ (Electromechanical Enterprises Qatar) Address: Qatar

Date: Feb. 2010 to April. 2013

Position: Electrical Supervisor

Company: Painvectoire/Mino Congo

Address: Congo Kinshasa

Date: May 20, 2013 to Dec 28, 2016

Position: Electrical Engineer/Inspector

Company: PRIME CITI (PROJECT MANAGEMENT)

Address: Boracay

Date: Feb 13, 2017 to Jan 25, 2019

Position: Electrical Supervisor

Company: MINO CONGO

Address: Congo Kinshasa

Date: January 25, 2019 up to present

RAINING PROGRAM / SEMINARS ATTEND

Microsoft Word-August 12, 1998, to September 16, 1998-

(DON BOSCO YOUTH CENTER)

Microsoft Office 2000 - Jan.26, 2008 to March 12, 2008 Word / Excel / PowerPoint

(MFI)

Matrixclima Precision Air Conditioning Unit - Oct. 03, 2007 Power ware 9355 20-40 Kva UPS - August 21, 2007

(COMPAC CORPORATION)

Philippine instrumentation and control society laguna chapter - September 27, 2008

(SAN MIGUEL METAL CLOSURE PLANT CANLUBANG, LAGUNA) Programmable Logic Control (PLC) SIEMENS Conducted from December 12, 2022 to December 16, 2022

(MFI POLYTECHNIC INSTITUTE INC.)

CHARACTER REFERENCES

Paul Perez

Electrical Engineer (PEE)

Nelson Delmundo

Operation Manager (CB Richard ELLIS Philippines)

I hereby certify that the above information is true and correct to the best of my knowledge.

JIMMY LEONA



Contact this candidate