Doug Norton
Winter Haven, Fla 33884
*********@*****.***
SUMMARY:
Twenty-five+ years as Project Manager, Planning and Scheduling, Cost and Start-up of major engineering, construction and maintenance projects. Accrued experience for many types of industry in all stages of development. Full knowledge of proven computer and manual applications with the use of a variety of up-to-date computer programs. I have represented clients such as Amoco, Marathon, Midamerican Energy, Husky Refining, Frontier Oil, on Major Projects, Turnarounds and Startups.
EDUCATION:
Management – Tarleton State University 1989 - 1991
PROFESSIONAL EXPERIENCE: Last 10 Years
Personal time off – present
DSC STAFFING (Graphic Paper Inc) July – Sept 2023
Field scheduler for CR Meyer in Waco Tx. Updating and reporting P6 schedule information. Creating new schedule for Fiber Line building.
Calculated Controls (Georgia Pacific) current/complete
Convert MSProject into Primavera P6 for outage in Oct. Will use their own people for outage after schedule is completed
Calculated Controls – Shell/Brock Philadalphia PA 7-1-21 to Present
Remote scheduling for 1.7 Bil. Project using P6 scheduling software. Piping and insulation installation schedule Remote.
Short term fill in jobs to present2021
Wal Mart stocking management help
Auto Zone Management parts
8-23-20 Furloughed due to Covid-19, all contractors laid off.
Midamerican Energy Company 2-28-20 –8-23-20
Lead Scheduler to create new process to schedule Safety and Protection Division’s staff.
Developed Excel to Primavera P6 interface for the PSR – (Project Status Report) to enable management to realize movement of dates and resource loading.
Integrated MSProject schedules into Primavera P6 schedules
Created talking points with SPD engineers to develop P6 schedule.
Developed “S” curves, reports and charts for management reviews.
Marathon Oil Refinery (Calculated Controls) 3-06-19 – 2-28-20
Lead Scheduler for a $450,000 major construction projects at refinery in Robinson, IL. Developed a detail schedule for daily use by contractors.
Developed WBS structure for all projects and contractors
Improved on EVMS used by contractors and engineers
Issued “S” curves and daily schedule reports of the status projects.
Husky Oil Refinery (Calculated Controls) 2-06-18 – 3-01-19
Project Controls Manager for the COF (Crude Oil Flexiblilty Project. A $851,000 expansion project with 2 major turnarounds included.
Developed weekly reporting and monthly reporting methodology
Created Primavera P6 Layouts and project reporting system
Managed weekly/monthly reporting for Husky management in Canada from 4 schedulers and 5 cost engineers
Koch Industries 2-05-13 – 10-06-17
SME (Subject Matter Expert) for Koch Fertilizer serving 5 plants in the US and Canada.
Developed primavera use and training to company employees. Help develop procedures and methods during turnarounds and projects. Created reports and schedule layouts with histograms for management use during these times.
Mentored in-house schedulers in process and teaching others to plan and schedule.
Frontier Oil Company 2012
Responsible for planning and coordinating shutdown activities for major units in the plant such as Crude, Hydrogen, CCR, Ultra-Cracker and Sulfur. Also responsible for invoicing, subcontracts, cost control and site office manager. The resource loaded detail schedules were in P3e.
2009-2012
Logan and Company Bartlesville, OK
Accountable for the overall administration at the jobsite level to insure that the work was completed in accordance with the contract specifications, construction drawings, schedule, and budget. Coordinate the activities of subcontractors to coincide with the project requirements. Responsible for insuring contract revisions are due to work scope and specification changes. Decision-maker with regard to method of construction used and staffing of the project with supervision, craft personnel, tools, and equipment, Also responsible for preparation and maintenance of project schedule and project cost control.
SOFTWARE KNOWLEDGE:
Minor SAP
Maximo
All Primavera versions from Finest Hour to P6 v 18
Microsoft Projects
Microsoft Office (Word, Excel, Access)
Lotus
INDUSTRIAL EXPERIENCE:
Cogeneration Power Plants
Nuclear Power Plants
Pulp & Paper Plants
Refineries
Petrochemical
Cement Plants
References:
Jim Varnado GPM 985-***-****
Doug Thomas Scheduler 319-***-****
Trey Miller Global Project Management – Owner 985-***-****
Robert Landen 225-***-****
Harry Speer 281-***-****