Dear Sir/Madam,

Greeting!

I am Mr. Ronnie V. Fadrigo, an employee in various Oil and Gas, Petrochemical, Energy and Road Projects as Electrical Engineer. I am able to work with different nationalities and different style & system of work, which made me better, stronger person and mold me to cope up even in the most challenging situation with proven capacity to perform under pressure.

My previous employer is DAEWOO E & C (RDPP Project – Ras Djinet Power Plant Project). I work as an Electrical Engineer. My task is to comply All Punchlist Assigned to me.

It is my utmost intention, if I would be given a chance, to join you in your highly respected and reputable company wherein I can share my competent and efficient experience and contribute for the continued success of your company.

Attached herewith is my Curriculum Vitae for your evaluation.

Anticipating my thanks for considering my application.

Sincerely,

Ronnie V. Fadrigo

Ronnie V. Fadrigo

801 Howard Street Apt. 517

San Francisco, California 94103

Phone No.

Cell No. +1-925-***-****

E-mail address: *********.******@*****.***

Profession

Electrical Engineer

Present Position

Electrical Engineer

Language Skills

Fluent English, Tagalog

Computer Skills

Proficient in Ms Word, Excel and Other Ms Windows based Program Applications

Skills

Installation of Power plant electrical equipment, GIS, Low Voltage and High Voltage control panel board, High and Low Voltage transformer and circuit breakers Engine main control panel board with the supervision of vendor.

Knowledge to comply with HSE & ISO policy and procedures.

Knowledgeable in MS Application, Basics of Visual Basic Application.

Interpretation and design of electrical plans and layout, electrical and wiring installation on residential and commercial buildings.

Interpretation of electronics diagram and design.

Supervision works for all installation and commissioning works such as: Installation of switch gear outdoor/indoor type; Motor Control Center (MCC); Automatic Battery Charger (UPS); Motors (low and medium voltage); Transformer (low and high voltage – indoor/outdoor type); Installation of cable tray/conduit (rigid or PVC coated) above and underground system; Cable pulling both low and medium voltage; Termination works (power cables); Fire alarm system; Testing and functional test of electrical equipments and commissioning works.

Review of all electrical drawings and scope of work prior to start of site installation. Prepare all equipments/tools and materials for project mobilization.

Provide recommendation for system enhancement, preventive maintenance, cost reduction and productivity improvement.

Monitor system performance and loading and ensure no unplanned shutdown.

Prepare all required specifications, operating procedures and working instructions.

Liaise with internal and external clients to coordinate works.

EXPERIENCE

July 12, 2018 up to April 3, 2019 Electrical Engineer

Daewoo E & C

RDPP Project (Ras Djinet Power Plant Project)

Boumerdes, Algeria

Comply all punchlist assigned to me at RDPP project

Feb. 3, 2015 up to March 2, 2017 Electrical Commissioning Engineer

HHI (HYUNDAI HEAVY INDUSTRIES CO., LTD.)

Hofuf & Jeddah K.S.A

Operator of 480VLV SWGR, 4.16KV and 13.8KV MV SWGR, Unit Electrical Building 1,2,3, and 4 Jeddah South Thermal Power Plant Project.

Conduct testing of MV and LV SWGR.

September 2012 – June 2014 Electrical Field Engineer

HYUNDAI ENGINEERING AND CONSTRUCTION CO., LTD.

P003 – Lusail Expressway

Lusail City, State of Qatar

•Holder of KAHRAMAA Permits, i.e. Limitation of Access (LOA) and Permit to Work (PTW).

•Prepare Method Statement (MS) for Site preparation work for temporary and permanent EHV and HV cable diversion work.

•Prepare daily report of sub-contractor, to be submitted to the Administration Department.

•Coordinate and discuss with the Consultant about Non-Conformance Report they issued, that needs to be complied and closed.

•Supervise on pulling of EHV cables at DNS-POG (Doha North Super-Pearl of Gulf)S/S cable route, 132kV 2000 sq.mm inside micro tunnel (3m dia.); a permit holder (PTW) of Kahramaa, for NCC(North Canal Crossing) bridge, Lusail City.

•Monitor and assist on HV cable pulling at SCC(Southern Canal Crossing) bridge, NDJ-LP (New Doha J-Lagoon Plaza) S/S, 66kV 1000 sq.mm cable route inside microtunnel (3m dia.).

•Conduct Post Installation Test; for DTS and FO cables prior to cable pulling; Ground Earth Resistance Measurement for Joint bay, Megger type DET4TRZ; Sheath Continuity Check Test to HV cables by means of Megger MIT – 510/2; check Sheath Voltage Limiter (SVL) characteristics; link contact resistance by means of DLRO (Digital Low Resistance Ohmeter); Outer Sheath DC Voltage Withstand Test up to 12 to 15KV ; end to end test of 24F/SM/FOC by OTDR(Optical Time Domain Reflectometer), power meter and laser source; measure dB attenuation, specified maximum total attenuation and attain the MLCP - Maximum Attenuation per connector pair and total number of Pair Connector (CP).

•Raise RFI (Request for Inspection) or IR (Inspection request)after the work completion.

•Supervise on MV cable pulling at Pearl area, for the subcontractor to comply; coordinate with Kahramaa for shutdown schedule and energize.

June 2008 to August 2012 Electrical Field Engineer

HYUNDAI ENGINEERING AND CONSTRUCTION CO., LTD.

QAFCO V, Ammonia & Urea Expansion Project

(HDEC-SAIPEM Consortium)

Qatar Fertilizer Company (QAFCO)

Mesaieed, State of Qatar

•Supervise on cable pulling of 132 KV cable main line power supply of QAFCO V from Cogen 2 S/S to Kahramaa Q-chem S/S, together with my co-Engineers.

•Assist and coordinate with the subcontractor with regards to the repair of damage cables along the ICPR (Interconnecting Pipe Rack).

•Assist co-engineer to install cathodic protection for safety jetty port area inside existing plant.

•Assist and supervise on the installation of grounding vessel at QAFCO V and VI.

•Holder of SIS (Service Information Sheet), LOA (Limitation of Access) and PTW(Permit to Work).

•Supervise on the installation of cable trays and cable pulling at cable cellar in Cogen 2 S/S (Main S/S of QAFCO V & VI Project).

•Coordinate with the vendor in regards with the tie-in of LV panels (QAFCO VI at Cogen 2 S/S and Utility S/S)

•Assist the Site Korean Manager at QAFCO IV Existing Ammonia and Urea Plant with regards to the tie-in of QAFCO V and VI to the existing plant.

•Raise RFI (Request for Inspection) after the work completion.

September2000 to August 2006 High Voltage Technician (Supervisor)

KING ABDUL AZIZMILITARY CITY (KAMC)

P.O. Box 475

Tabuk, Kingdom of Saudi Arabia

•Compute the outgoing load of all substation.

•Maintain all switch gear (different type), transformer oil and dry type, 13.8 KV up to 33 KV rated 1000 KVA up.

•Check the insulating oil dielectric strength, viscosity and color.

•Prepare the schedule, maintenance and scope of work annually or quarterly.

February 1997 to December 1999 Field Engineer

J.F. GILMORE GENERAL CONTRACTOR

#9 Quarts, Meralco Village, Lias

Marilao, Bulacan

•Supervise on the installation and termination of all electrical works under the supervision of MERALCO (Manila Electric Co.).

•Specify fuse cut-out with back-up current limiting (CLF) for transformer protective device.

•Replace damage facilities & restore power.

January 1995 to May 1996 Machine Operator / Electrical Maintenance

TAIWAN ELECTRO MATERIAL COMPANY, LTD.

11 Kuan-Fu Rd. Hsin Chu Industrial Park, Taiwan R.O.C

Ph. (035) 083883 Fax (083) 982418

•Operator of a High Vacuum Web Coater machine, under the supervision of German Engineer and Japanese Engineer.

•Promoted as an Electrical and Mechanical Maintenance.

•Adjust the gauge of the first drum in setting and test of motors’ controls and switches.

•Check and monitor the finished products if it is in

2.5mf to 8mf.

•Clean the machine annually during Taiwanese Holiday.

•Procure and change busted spare parts.

April 1988 to April 1990 Electrical Maintenance / Assistant Supervisor

Electrolux Saudi Services Ltd. (Thomson-CSF-Branch)

Ph.464****-*******(Riyadh) / 6531596 (Jeddah)

Kingdom Of Saudi Arabia (K.S.A.)

•Responsible for the maintenance and repair of all Electrical Machineries use in operation.

- It involves changing of motor time relay.

- Motor installation

- Troubleshooting

- Checking of magnetic control and replacing magnetic contactor if carbon is already visible.

• For immediate absence of our Electrical Supervisor, I took over all his duties and responsibilities.

March 1985 to March 1987 Electrician / Draftsman

AL- TAATI CONTRACTING EST.

Suliman Bin Mohamed Aba-Alkhail

Kingdom Of Saudi Arabia (K.S.A)

•Install duct bank conduit, rigged steel conduit.

•Cable pulling, splicing of cables, high and low voltage.

•File and log all Electrical and Civil Plan

•Blue printing and scaling

May 1978 to May 1979 Electrician

PHILIPPINE FABRIKOID INC.

48 Royal Road Bo. Kangkong

Quezon City, Philippines

•Maintain all electrical machineries and repair with the supervision of the Engineer.

•Electrical installation such as production equipments, power cable pulling and termination, cable tray,conduit, panel and electrical equipment setting for MV/LV system and auxiliary system.

SEMINARS & TRAINING:

1988 (6 Months) Electrical Maintenance (Inter Island)

N & S LINES

Pier 6, North Harbor

Tondo, Manila

June 1996 to August 1996 Business ApplicationSoftwares

AMA COMPUTER LEARNING CENTER, INC.

2/F Gotesco Grand Central

Caloocan City, Philippines

REFERENCES

-Engineer Rodolfo A. Bacar Personnel Manager

-Perfecto V. Bunag Jr. Finance / Administration Manager

-Engineer Emilio T. Bono Engineering Review Manager

-Mr. Borromeo Jimenez Senior Vice Pres.

(Personnel & Administration Department GMA Channel 7

-Engineer Leonito Roca Fire Dept. Central Station

Arroceros, Manila

-Atty. Romeo S. Occena Asst. National Legal Counsel

Associated Labor Union- TUCP

-Mr. Sukon Kim Electrical Manager (PE) / Plant Division

Hyundai Engineering & Construction Co. Ltd.

EDUCATION

1975 – 1984 Bachelor of Science in Electrical Engineering (BSEE)

FEATI University, Manila Philippines

1971 – 1975 Secondary

De La Salle – Araneta University

(Formerly Araneta University Foundation)

1965 – 1971 Elementary (Primary)

Bagong Barrio Elementary School

PERSONAL DATA

Birth date : March 23, 1960

Birth place : Paco, Manila

Age : 59 years old

Sex : Male

Height : 5’7” (1 m and 67 cm)

Weight : 74kg.

Civil Status : Married

Language : English



Contact this candidate