Site Civil Engineer/ Supervisor/ I.O.W
OBJECTIVE:
Civil & Structural industry. Strong input towards the job. Physically fit, verbal sound in communication, OSHA compliance, keep upgrading towards the industry needs. Monitoring civil construction projects.
Oversees activities such as bridge construction, repairing roads and highways, and doing construction on airport buildings & drainage, plant EPC's job. Most of the time is spent at sites to make sure all parties involved and performing well for the day task and achieve the day target.
EMAIL: *********@*****.***
Address: 2, Laluan Sungai Pari 15
Teluk Kurin, Buntong Ipoh
30100 Perak Malaysia
Phone: +601*-*******
Date of Birth: 29-10-1977
Nationality: Malaysian
Link: www.linkedin.com/in/jarrad-justin-
michael-741986123
TECHNICAL:
1. HSS Engineering project, the bridge
construction planks were cast at the
site. I was personally involved with
Pre-stressing wire rope Ø8mm which
yield strength 29.9 N/mm -35N/mm
calculated under M.S/ISO9001-2008.
2. Spun pile test: PDA evaluated bearing capacity using a transducer. In this case of the readings around 300mm-450kN>, 600mm-1200kN>
3. Bore pile test: The hard layer is tested using the Point Load Test (PLT), which is conducted when hard layers are encountered while boring for the bored piles being carried out. Designspecifications values of 1MPa>. When a rock stratum is encountered, boring is carried out through it using a diamond-bit boring drill. The length of the bored pile socketed in the rock stratum is referred to as “rock socket length” in accordance with construction drawings.
4. Sonic logging to test for the integrity of the concrete. 2% from the overall piles.
5. First time doing the Statnamic Test from regular MLTs for the Bore pile 2xSWL 12000kN. The test lasted less than 3 minutes with loud explosive noise. The settlement is calculated from the impact. The maximum allowable remaining the same standard
application 25mm.
NAME: Jarrad Justin MICHAEL
EXPERIENCE:
Pahang Malaysia
September 22nd 2023- 30th Sept’2024 (Project Completed) MEI Consultant Site team
CRYOVAC Warehouse Extension Job
Project Executive (CSA)
Summary:
Extension of warehouse, car park, Fire pump house, Unloading area, Scrap yard, LPG Gas and Domestic Water Tank at land size 2.5ha
Piling / Cut/ Testing
Pile cap/ Ground Beam/ Slab / Level / Brickworks
AHU / MEZZANINE Slabs
Steel Structure / Subcontractor installation for steel and roofing
Infrastructure / Drainage / Sewerage / RWDP / Roadworks Negeri .Sembilan Malaysia
May- September 2022
Dec ’22 – February 2023
April’23 – July’23 (New Silo)
Shut down & commissioning at TOYO Engineering
Contract terms Quantum Engineering
Inspector of Work
Summary:
Modification of existing warehouse, extension of new silo, and some infrastructure. These task was ongoing multiple times due to space constraint by a lot of other sub-contractors mainly piping Oil and Gas team.
Tralee Ireland
September 2020- February 2021
Further studies at University of Tralee MTU
(Did not complete) financial
Johor Malaysia
September 2017- August 2020
HSS Engineering Malaysia (Consultant)
Inspector of Work
Summary:
Total 3 bridge span involved series of pier columns. My duty at B1-383m & B2-371m. The last one is 2.2km. The ground at rural plantations palm oil area contain of peat soil to marine clay joining at Sg Pulai JOHOR which located in between of Kukup/Tg Bin and Tg Pelepas Port. Total cost RM640mil. Client is SEAPORT / MMC Berhad with subcontractor CHEC
(M) SDN BHD.
The total length of the bridge: 7.4km
Dual carriageway with span 22.5 meter
Marine clearance from the water: Vertical Clearance: 25m (3rd Bridge)
Horizontal /Navigational Clearance: 100m
(Centre part of Bridge 3 only@ PIER 19 & PIER 20) Site Inspector: monitoring the daily output example: Inspect the excavation depth, ready for the pile cap work, rebar, formwork, concrete, etc. In bridge construction, if the site falls close to the river stream, sea, or even lakes, there will be an involvement marine protection act installing silt curtain, fence, and buoy. Depending on the site require a temporary bridge. Other administrative can be from daily site diary record, attending meetings, site discussions in related to any sudden changes in design to suit to the site condition.
RAPID Petronas - 2015
Foundation works for temporary workers camp
Water pipeline HDPE & Sewerage using electrofusion technology and CLMS pipes at Fire Hydrant connection.
Building & roads - involved in the foundation and field density, DCP, and Plate bearing test.
Ground improvement using HIEDYC DC compaction for foundation work. Given required strength kPa with residual settlement less than 25mm for next 5 years. EXTRA ACTIVITIES:
Jogging
Hiking
Long walk
LANGUAGES:
English:
Intermediate, IELTS band
6.5(expired).
Malay:
Advanced reading & writing S.P.M
Deutsch:
Intermediate, Linguaphone certificates
Spore 1998
Tamil: Communication only
PROJALMA Sub-contractor 2014 & 2015
Precast bridge segments for flyover in Pasir Panjang Singapore @ Batu Gajah Ipoh.
Involved heavy reinforcement rebar. HT 16mm was the minimum size for the starter bar
Carriageway width 15m and weighing from 70ton-120ton
Some segments come together with a 1.5m walk path with a parapet wall separator which will involve cast in situ later stage.
QA/QC assessment required time to time at mould /finishing and joining part. This will subject to approval by site engineers before/after placing/ reinforcement re- bars. Dismantled from mould QC checks.
Curing pattern with water/sprinkles gunny sack placing EXTRA ACADEMIC:
Keep up with new engineering
drawing tools like learning
through You-Tube and other
resources available.
Self-learning from engineering
books mainly standard practice
BS/M.S/E.C involving
geotechnical and bridge
construction technology.
SKILLS:
Demonstrated ability to
implemented new projects with
initiative and open minded to
work in complex environment
projects.
Engineering drawing using auto-
cad latest version. Beginner in
Revit.
Advance thinking and able to
visualise type of work, plants,
manpower require to complete the
project or day task.
Team player as leadership,
communication and problem-
solving.
Interpret plans, update any simple
sketch to suit to the site with
approval from Senior Engineer
Ipoh Malaysia
January 2012- April 2016
Inflow Engineering Malaysia
Site Engineer/Site Agent
This firm initially doing a lot of sewerage treatment construction jobs for the new plant, services to the existing plant, plant up-grading. After the recession period, the company turn to slow down in everything where I was sent to other parenting companies to continue the engineering service with them. Those are listed below:- LUMUT Port - 2012 & 2013
Concrete water tank foundation involved heavy reinforcement 16-30mm in rebars / Concrete Grade 35-40.
Steel water tanks 4m x 4m x 6m
Tapah Perak Malaysia
May 2016- December 2016
LHOIST Malaysia
Civil Supervisor
An EPC project. Lime plant construction at Greenfield. I started during pilling work at building foundation big bag warehouse and power sub-station for 33kv. As a site supervisor, I handled:-
RFI's, Site Instruction, NCR punch list which record in excel sheet format and produce to manager on weekly basis.
Weekly coordination team and subcontractor meetings
Take full responsibility from spun pile driven up to completion at big bag warehouse Size: W: 120m x L: 380m. Spun piles 600mm. Piles driven to the length at 45m cut-off. Most piles set at below <40m. Although I am the in house work supervisor, I do checking on the sub-contractor installing the warehouse I Beam, H-Beam, etc.
Update the drawing to contractors immediately if any changes.
Fully safety awareness standard practice under the safety guidelines.
Site Inspection on daily work.
Perth Australia
January 2008- August 2008
BELMONT CITY COUNCIL
Casual Trainee Engineer
Understudy Senior drafting engineer. Doing design drafting for road construction.
Produce drawings using computer-assisted drafting systems (CAD) engineering tools. Review rough sketches, drawings, specifications, and other engineering data received from civil engineers to ensure that they conform to design concepts.
Explain drawings to construction teams and provide adjustments as necessary
Site visits during construction and understand the steps off work involved in road construction.
Perth Australia
September 2008- December 2009
CITY OF WANNEROO
Cadet Engineer
As a cadet engineer with the local council at the City of Wanneroo. During the period, involved in various fields. Most of it was understudy from a mentor or a senior engineer. Project Design 6months Engineering drawing, Estimate quantities cost of materials, equipment, or labour to determine project feasibility. Land & Development 3months - Land development is the process of acquiring
Undeveloped land (green land) and obtaining entitlements the right to build on it. Land development refers to altering the landscape in any number of ways, such as subdividing real estate into lots, typically for the purpose of building homes, or changing undeveloped landforms to construct commercial, industrial, or residential buildings
Project Construction 3months - On-site, supervisors and assistant supervisors assist with daily activities. They make decisions to ensure quality is optimized and budgets are maintained. Additionally, ensure all procedures are properly followed in technical expectation like the pavement strength according to AS standard using CBR value in high strength from 80-100% and D.C.P. Some areas also involve Mackintosh Probe's rough estimation for strength.
Asset Management 3months- Assess Building over Easement approvals, Storm-water
Points of Discharge, Public Lighting, and other engineering asset-related enquirers.
Taking counts on bus-stops, shelters, seats, rail guards, ramp at certain sections. ( these data's require for upgrading purpose )
Monument statue's around the city.
Vandalising area list down
Ipoh Perak Malaysia
March 2010- December 2011
Pembinaan Sinaran Anjung Malaysia
Site Agent
Direct involvement with water pipeline. Mostly government tender and carry out the job. I was on duty at the Royal City of Kuala Kangsar Perak. Laying HDPE pipeline. The welding method is an electrofusion system.
The technical output is typical tact welding application joined are cleaned, inserted into the electrofusion fitting with a temporary clamp if required and a voltage normally 40V is applied.
Checking pressure gauge test for the pressure bars. The fitters will advise according to plan and standard application 10bars is sufficient for housing.
Others at "S bend" when crossing drains.
Singapore
March 1995-November 1996
SATS (Singapore)
Warehouse / Operation Assistant
Cargo department with SATS.
Prepare documentation for clearance of all inbound shipments requiring formal entries and outbound shipments in accordance with customs and quarantine regulations.
Prepare cargos into the aircraft pallet PAP, PG, P1P, P6P, etc.
Dangerous shipments will go into separate container.
Expedite customs declaration efficiently and maximize customer satisfaction.
Overall responsible for the forwarding of freight from one place to another location/country.
REFERENCES:
Name: Ir Shahrudin Muhayat
Title: (Resident Engineer) Sg Pulai
Bridge Johor
Email: *********@***.***.**
Tel: +601*-*******
Name: Ir.Sheikh Shujathullah
Title: (Assistant Resident Engineer)
Sg.Pulai Bridge Johor
Email: **************@*****.**.**
Tel: +601********
EDUCATION: Ireland
2020-On-going
MTU Ireland
BEng Civil & Environmental Engineering.
Due to pandemic classes conducted
through online using blackboard.
I require to repeat 3 papers.
(Abort temporary)
COMPLETED
Perth Australia
Tafe College 2008-2009
Advanced Diploma in Civil & Structural
Engineering
Perth Australia
Tafe College 2007-2008
Diploma in Civil & Structural Engineering
Perth Australia
Tafe College 2006-2007
Certificate 3 Drafting in Civil & Structural
Engineering
HONOURS & AWARDS
The Institute of Engineers Australia
Year: 2009- December
Title: Officer Graduate
Registration number: 3676428
The Institute of Engineers Malaysia
Year: 2011-December
Title: Associate Member
Registration number: 46786
Board of Engineers Malaysia
Year: 2019 March
Title: Inspector of Work
Registration number: W16418
Singapore
November 1996- November 1999
CISCO
Constable
Patrols assigned areas, checking for suspicious activity in persons, or safety/fire hazard. Mainly at refinery plant like Exxon Mobile, Shell, Jurong Power Plant.
Escorts cash to ATM machines when cash transfers.
Decides when an incident requires written.
Assist law enforcement officers with crowd control and surveillance at large public events.
London UK
March 2000- January 2002
RCE Ltd UK
Assistant Civil Chain-man
Fresh involvement in Civil Engineering. Assist the surveyor to the site. Learning engineering drawings using computer-assisted drafting systems (CAD) engineering tools London UK
February 2002- April 2004
Menzies Air Cargo (UK)
Warehouse staff (Part-time)
Prepare documentation for clearance of all inbound shipments requiring formal entries and outbound shipments in accordance with customs and quarantine regulations.
Expedite Customs declaration efficiently and maximize customer satisfaction.
Prepare into freighter cargo pallet
Overall responsible for the forwarding of freight from one place to another sender location.
Ipoh Malaysia
June 2004-May 2005
Inflow Engineering Malaysia
Assistant at Site
Trainee. The Learning curve in engineering at the sewerage treatment plant.
Assist on-site, Prepare tools, plants (machinery), and other engineering require items on sewage cum drainage.
Perth Australia
January 2006-December 2007
Sealanes
Casual Staff- picker
Part-time staff. The night shift at a dry food warehouse.
Prepare dry food and staked into the pallet to send out to an ordering town-site example: Avon Valley, Kalamunda, Carnavon so on.