Post Job Free
Sign in

Quality Control Assurance

Location:
Fernley, NV, 89408
Salary:
40hr
Posted:
September 18, 2024

Contact this candidate

Resume:

Motivated electrician with experience

in commercial/light industrial

environments and an exquisite skill

set. Ran QA/QC and Commissioning on

large commercial jobs, As well as field

crews and special projects.

Well-rounded electrician with 15 years

of knowledge and experience in all

aspects of the electrical trade, large

projects, new construction and TIs.

Seeking an opportunity where my

skills, training, and work experience

will be a vital asset to the company.

Field Management

Quality Assurance/ Quality Control

Commissioning

Proficient with CX Alloy, Plan Grid,

Pro Core, Aconnex and BIM 360 Field

LOTO safety trained.

Ability to read Schematics and

blueprints.

Ability to manage employees.

Extensive knowledge of National

Electric Code

Trimble RLS and Trimble Field Link

Software

Installation of CCTV cameras and

alarm systems

Problem solving

Material ordering/tracking

CPR certified.

Switchgear/Panels/Transformer

/Generators/UPS systems/PLCs

Lighting and lighting controls

Extremely organized.

Berg Electric, Switch

FOREMAN Reno, NV 07/2022 to Current

Responsible for installations of all MV gear and single line Conduct meetings with the client and GC for all first of a kind installation and making sure all subsequent installations are consistent with all expectations

Ensuring that all installations conform with spec as well as code

Working with all PM's and Superintendents to proactively prevent incorrect installations and resolve all pending issues Coordinating with GC, client, and county inspector to get items completed and turned over as scheduled

Meeting in house Superintendents to complete tasks and direct construction to priority items.

Lotus Works Inc-TI

QA/QC and COMMISIONING MANAGER Richardson, TX

03/2022 to 05/2022

Responsible for ensuring all low voltage switch gear is installed in accordance with drawings, specs, and code Creating issues that could not be fixed during the inspection Daily email correspondence with all contractors to discuss priority equipment that is ready for inspection.

Delivered reports on quality control metrics to internal departments for analysis as well as to outside vendors and contractors for consideration in new contracts.

Berg Electric, Amazon Data Center

FOREMAN San Antonio, TX 11/2021 to 02/2022

Responsible for all single-line installations including but not limited to MV generators, transformers, all low voltage switch gear, and UPS systems

Managing crews for all cable tray installations as well as all branch circuitry

Managing QC/schedules and ensuring equipment is installed in a timely and quality fashion

Responsible for all commissioning QA/QC with 3rd party Brett

Partain

***********@*****.***

702-***-****

Fernley, NV 89408

Summary

Skills

Experience

BP

Document management

Job site management

Safety oversight

Project deadlines

Quality control

NFPA 70E

Scissor lift/Boom Lift

Forklift

OSHA 30

MV Terminations and splicing (3m

and Ray Chem)

commissioning companies.

Berg Electric- Switch

FOREMAN Reno, NV 09/2020 to 11/2021

Installation of all MV and low voltage switch gear as well as UPS systems, lighting control systems, and security systems. Responsible for all QA/QC commissioning, documentation and commissioning with 3rd parties up to level 5.

Supervised projects to uphold schedule requirements and quality demands.

Ordering materials, time keeping and maintaining a safe a productive work environment.

Berg Electric-Google

QA/QC, COMMISIONING FOREMAN Reno, NV 06/2019 to

09/2020

Google, QA/QC, Meetings with client and GC for all first of a kind installations and making sure all subsequent

installations are consistent with all expectations and first of a kind installations

Ensuring that all installations conform with spec as well as code

Completing FATs prior to level 5 commissioning with 3rd party CX teams making sure all equipment is functional and meets the clients expectations

Managing QA/QC teams for project Mustang

Working with all PMs and superintendents to proactively prevent incorrect installations and resolve pending issues Working with CX/LOTO teams to ensure smooth transition from QC to commissioning

Running Scripts (FAT) with clients and 3rd party CX teams to ensure all systems are functional and ready to hand over to client

Managing QC/CX documentation in house and BIM 360

document management and checklists

Duties also include coordinating with GC and the client as well as county inspectors to get items completed and turned over on schedule, As well as in house Superintendents to complete tasks and direct construction to priority items. Lotus Works Inc-Intel

Direct LOD Superintendent, ELECTRICAL SUPERINTENDENT Chandler, AZ 02/2019 to 06/2019

Responsible for managing multiple electrical contractors as well as general contractor in FAB 42 for Lay Out Dependent scope

Managing layout of equipment as well as installation and completion of equipment according to schedule

Managing BIM department submissions with a cadence of 50 Certifications

IFF approvals per week

Coordinating LOTO and start up with Intel teams

Working with Intel engineers/PMs to resolve single line issues, layout conflicts, and energization of equipment. Quality Plus Services Inc-Tesla Gig 1

COMMISIONING LEAD Reno, NV 10/2018 to 01/2019

Ran QA/QC & Commissioning for QPS at the Tesla Gigafactory 1 in Reno, NV

Duties include but not limited to: Insuring quality installations that meet code and spec

Scheduling inspections with inspectors Working with CX Alloy, Pro Core, Plan Grid, & Aconex to ensure clients and teams involved were aware of job status

Working closely with Third party commissioning company to ensure turnover of completed items in a cost effective and efficient manner.

Helix Electric-Tesla Gig 1

QA/QC and COMMISIONING LEAD Reno, NV 01/2017 to

10/2018

Responsibilities at Tesla Gigafactory1 included Quality control and Quality assurance

Uploading mark ups and issues with CX Alloy, Plan Grid and Aconex

Kept all records of completion status and issues

Ran pre-commissions and commissioning with 3rd party commissioning company with remarkable success

Responsible for running a layout crew in 1.9 million square feet

Utilized Trimble Robotic Laser Systems

Ran crews on various projects within the project.

RL Jackson Electric

ELECTRICIAN/FOREMAN Las Vegas, NV 06/2016 to

01/2017

Responsibilities included laying out employees and making sure all tools/Materials were readily Available Making sure all installations were up to code and spec

Tracking tools/materials/hours Installing, wiring, troubleshooting all electrical components Insuring jobs are on schedule and on budget Maintaining a safe and

professional work environment for all employees.

Swift Electrical Services

ELECTRICIAN Las Vegas, NV 01/2012 to 01/2016

Installed safety systems, including emergency lighting, uninterruptible power systems and battery systems

Responded to emergency callbacks and provided onsite support

Evaluated electrical systems, equipment and components to identify and resolve defects and safety risks

Worked on projects, which provided value to the

department, the company, and the client base

Consistently worked to code on all projects, utilizing drawings and manuals

Installed conduit, wire, and motor controls

Installation of CCTV cameras and Alarm systems for high end clientele.



Contact this candidate