Post Job Free
Sign in

Material Handler Site Manager

Location:
Sfax, Sfax Governorate, Tunisia
Posted:
September 09, 2024

Contact this candidate

Resume:

Name SADDAM BELHADJ LTAIEF

Page */ * CONTACT: +216-******** / +218-*********

Name: SADDAM BELHADJ

LTAIEF

Nationality: Tunisian

Year of birth: 1990 in SFAX

(Tunisia)

Email: **************@*****.***

Phone Number:

+216-**-***-***

+218-*********

CIVIL SADDAM BELHAJ LTAIEF / 33 years

EMAIL/

TELEPHONE

**************@*****.*** /+216-**-***-*** / +218-********* Availability Immediately

Experience 8 years

On the benefit of a serious experience in the project construction and management, working overseas for petroleum majors, I am ready to assume a new assignment. Experienced Piping Engineer– Deputy Construction Site Manager– Site Engineer – Construction Supervisor– Document controller & Material Handler, familiar with Procedures with 5 years’ extensive experience in Construction Supervision, Project Management & Piping Maintenance, highly motivated to be involved in another international oil & gas project.

Main assets:

Safety culture, rigor, respect of milestones and team spirit, rules the way to manage team and job performances, creating and managing multi-discipline tasks force groups and generate all stakeholders on projects.

PIPING & CONSTRUCTION ENGINEER

Introduction

Name SADDAM BELHADJ LTAIEF

Page 2/ 8 CONTACT: +216-******** / +218-*********

Company BONATTI & DIETSMANN

Position Piping Engineer

Date of start 01/09/2023 Date of completion Until now CONTRACTOR:

MMAC TEAM

OWNER:

MELLITAH OIL AND GAS BV, ENI LIBYAN BRANCHE

DEPARTMENT:

MAINTENANCE PLANNING & ENGINEERING DEPARTMENT

Tasks:

• Preparing work packages contents of Material Take Offs, plots plans, isometric drawings, welding procedures for minor piping modifications and spool replacement.

• Preparing Hydro test procedures, leak test procedures, bolt-tightening procedures for gs plant process heat exchangers, vessels and pipes, submit to inspection and QA, QC for approval.

• Immediate reaction when there is piping failure and process leakage to prepare the requirements for emergency maintenance interventions.

• Reviewing with suppliers specifications and material supplies, assist material staff to technical evaluate offers.

• Compiling and issuance piping isometric drawings by using AUTOCAD or similar document various stages of maintenance works in methodical way.

• Provide knowledge of mechanical/piping codes and standards and mentor planning staff with technical up to date and professional development.

• Participate in constructability reviews for Mechanical/Piping, in plant modifications and retrofitting.

• Investigate mechanical failures, e.g. process hammering phenomena & cavitation & metallurgical fatigue & corrosion & repeated leakage, PVC pipes failures etc, and come up with solutions and recommendations.

1- EXPERIENCES

Name SADDAM BELHADJ LTAIEF

Page 3/ 8 CONTACT: +216-******** / +218-*********

Company GETS, Global Engineering & Technical Services Position Construction Engineer (Acting Deputy Construction Site Manager) Date of start 22-11-2022 Date of completion 31/08/2023 COMPANY:

GETS, Global Engineering & Technical Services.

JOS, Jabel Oil Services

CONTRACTOR:

PETROFAC

OWNER:

ZALLAF Libya for Exploration and Production of Oil & Gas (ZLOG) Project:

12” Export Crude Oil Pipeline along with telecommunication system from Erawin field at NC200 to NC115B

Tasks:

• Receiving the planning and the design of the project from The Project Leader.

• Preparing work schedules in collaboration with the E&C Manager.

• Establishing, reporting and following-up all non-conformance activities.

• Conducting daily briefing with site Supervisors to follow-up and report the work progress in order to anticipate any possible delays with regards to planned tasks.

• Taking immediate corrective action to avoid any cumulative effect of such deviation and recovering the delay to finish the task in due time.

• Assisting in the planning and sequencing of the construction operations according to the Project Quality Plan.

• Conducting regular inspections and preparing External daily Report to Client (scan and send signed documents to DC Engineer in the head office for record).

• Preparing Internal daily reports to GETS and Contractor Management, addressed to the assigned Project Leader in the head office.

• Preparing Weekly Report (scan and send signed documents to DC Engineer for record) indicating the weekly progress of the project as per the agreed weight factor.

• Attending Daily Meeting with the Client and with the Supervisors in order to divide the Tasks according to a planned schedule.

• Receiving instructions from The Project Leader in GETS Head office.

• Preparing Monthly Report of the project by 25 of each month.

• Weekly sending the S-curve and progress sheet.

• Coordinating with Mechanical and Electrical Supervisors to insert the daily progress in the progress measurement system.

• Assuming Technical Responsibility in front of Contractor and Client for delivering the Project on schedule, according to scope and quality.

• Focal Point of Communication with Client in the site.

• Leading the Technical Team according to Target production plan instructed by The Project Leader.

• Daily Progress internal meetings with Contractor Logistic coordinator, Foreman, Quality Responsible, and safety Man to ensure the best safety situation. Name SADDAM BELHADJ LTAIEF

Page 4/ 8 CONTACT: +216-******** / +218-*********

• Manpower Time sheet which should be sent to the Project Leader according to the standard form by the End of the Month.

• Filling and signing the Material and the equipment request receiving from Store Keeper.

• Coordinating with Project Leader to fulfill any site input related to Engineering work.

• Notify by E-mail the HR in case of mobilization or demobilization of personal from Site. Company IEC INDUSTRY, International Engineering & Construction Position Site Engineer, Construction supervisor

Date of start 01-09-2022 Date of completion 01-11-2022 Company:

IEC INDUSTRY, International Engineering & Construction CONTRACTOR:

ENMA-EMCO

OWNER:

MELLITAH OIL & GAS BV ENI LIBYAN BRACH

Project:

PROVISION OF GAS SUPPLY FROM MELLITAH TO ZUWARAH DESALINATION PLANT PROJECT (E&I SCOPE OF WORK).

Tasks:

• Ensure the application of established procedures and implemented by all workers on site.

• Establish and implement the construction strategy on site.

• Ensure and lead the weekly meeting with the CONTRACTOR.

• Establish daily construction reports with progress.

• Establish the planning for E&I scope.

• Prepare the weekly planning.

• Supervising the E&I work.

• Prepare the work method of statement related to E&I scope (pulling cable, wiring and testing…).

• Prepare the as-built document and the ITR related to E&I scope. Name SADDAM BELHADJ LTAIEF

Page 5/ 8 CONTACT: +216-******** / +218-*********

Company EMCO, Engineering Management & Contracting Position Site Engineer, Construction supervisor

Date of start 01-02-2020 Date of completion 30-08-2022 Company:

EMCO, Engineering Management & Contracting

CONTRACTOR:

ENMA-EMCO

OWNER:

MELLITAH OIL & GAS BV ENI LIBYAN BRACH

Project:

INSTALLATION OF CARTRIDGE FILTER FOR 32" GAS PIPELINE AT MELLITAH COMPLEX/MOG OIL & GAS BV ENI LIBYAN BRANCH

Tasks:

• Guarantee permanent compliance with safety and security standards during construction activities by all personnel working on site.

• Ensure the application of established procedures and implemented by all workers on site.

• Establish and implement the construction strategy on site.

• Ensure and monitor the completion and compliance of work on site.

• Ensure the general follow-up of the progress of the works and the construction planning.

• Approve purchase requests initiated on site.

• Decide on priorities and general construction sequences while respecting deadlines and synchronization of schedules.

• Approve attachments and acceptance sheets for work carried out by subcontractors.

• Ensure and lead the weekly meeting with the client.

• Ensure and lead the "Daily Briefing" with the site team.

• Establish daily construction reports with progress.

• Report to the Project Manager any material / human resources / logistical resources required for the work.

• Conduct internal document audits with members of the on-site team.

• Apply the procedures and instructions established and implemented for the project while respecting the standards of safety, security and hygiene during work on site.

• Keeping the quality file up to date for work relating to the discipline.

• Establish preparations for daily operations and the activities to be carried out.

• Prepare the necessary needs in terms of equipment and material for carrying out work on site.

• Manage the assignments of the teams under responsibility.

• Develop, validate, launch and monitor work permits in coordination with the HSE manager.

• Monitor the progress of the work according to the approved schedules and notify for any possible delay.

• Establish the daily report on related to activities and communicate it to the Project Manager.

• Prepare Test packs and perform Hydro test for each piping system and subsystem.

• Liaise with clients’ representatives and coordinate with other department supervisors for effective coordination of all works.

• Assist the Project Engineer to supervise, organize and plan activities to ensure smooth fabrication and construction of structures within the stipulated schedule on the project. Name SADDAM BELHADJ LTAIEF

Page 6/ 8 CONTACT: +216-******** / +218-*********

• Review technical drawings and advise engineering of any discrepancies before commencement of fabrication works.

• Update progressively to ensure proper control of material procurement and usage.

• Ensure that manpower is effectively deployed to deliver the products timely.

• Study and evaluate the work sequences and methods of the Department and explore new ideas to improve quality and productively.

• Implement project operations and document control procedures.

• Coordinate and monitor subcontractor’s activities at project site to avoid unnecessary delay to the progress of work.

• Carry out inspection and tests as per Inspection and Test Plans. Results of such to conform to specifications and drawings.

• Ensure that workers and subcontractors adhere to good house-keeping and implement QHSE practices.

• Ensure that all construction works carried out are in accordance to the QHSE procedures, instructions and practices.

Company EMCO, Engineering Management & Contracting Position Document Controller & Material Man

Date of start 01-07-2019 Date of completion 30-08-2022 Company:

EMCO, Engineering Management & Contracting

Project:

INSTALLATION OF CARTRIDGE FILTER FOR 32" GAS PIPELINE AT MELLITAH COMPLEX/MOG OIL & GAS BV ENI LIBYAN BRANCH

Tasks:

• Codify the documents on site as per company specification.

• Create and maintain a Site Document Register.

• Ensure and keep available (with each supervisor) the management of project files on site, namely HSE, Quality, Warehouse, Administrative, Management, Execution Plans and others ...

• Provide documentation to the various workers on site.

• Provide documentation to local employees (Processing a letter, requesting a document, Printing a document, ...).

• Establish the daily report on its activities and communicate it to the Site Manager.

• Keep the Store file up to date (including validated access authorizations).

• Manage material including receipt, storage, preparation, and distribution.

• Maintain an inventory of materials (Entry / Exit).

• Plan and supervise all activities of transport, lifting, handling, loading / unloading of material on site.

• Establish, validate, launch and monitor the work permits relating to each loading or unloading operation of the equipment or materials under its responsibility in coordination with the HSE manager.

• Ensure the organization and management of the store according to the procedures and instructions in place.

Name SADDAM BELHADJ LTAIEF

Page 7/ 8 CONTACT: +216-******** / +218-*********

• Maintain an updated state of the materials mobilized on site (Tools; Consumables; Centenarians & office equipment;…).

Company BF Concept, Body Fitness

Position Document Controller

Date of start 01-04-2019 Date of completion 01-06-2019 Company:

BF Concept, Body Fitness

Tasks:

• Update and keeping of all the project documentations i.e. drawings, specifications, data sheet …

• Provide the ability to control the documentation follow, filing/archiving.

• Provide a review of all the final documentation being generated. Company EMPS

Position Material Handler

Date of start 01-12-2016 Date of completion 01-03-2019 Company:

EMPS: Electro-Mechanical & Pneumatic Services

Tasks:

• Ensures orderly production and distribution of products by pulling orders from inventory, delivering production materials and supplies where needed, and staging finished product final distribution.

• Contributes to the orderly operation of stock and/or materials storage area.

• Maintains inventory by identifying, labeling, and keeping materials and supplies in stock, recording location of inventory, and reporting shortages.

• Locates materials and supplies by pulling and verifying materials and supplies listed on production orders.

• Maintains in-process inventory at work centers by delivering and opening materials and supplies.

• Documents materials and records units delivered and location of units.

• Receives credit-return material and supplies from production by verifying materials and supply codes, lot numbers, and quantities.

• Maintains material-handling equipment by completing pre-use inspections and making operator repairs.

• Keeps inventory, loading areas, and machinery clean.

• Open containers, sort, and catalog materials.

• Learns and adheres to workplace safety regulations. Name SADDAM BELHADJ LTAIEF

Page 8/ 8 CONTACT: +216-******** / +218-*********

• February 2016 – June 2016

End of study internship at IMR

- Tasks performed: Study and design of a hydraulic press with two cylinders

• August 2015

Technician internship at AMI, Industrial Mechanical Workshops

- Maintenance

• August 2013 & 2014

Internship at SOCOMENIN, Metal Construction Company

- QHSE

2012-2016 Diploma ELECTRIOMECHANICAL ENGINEER

National School of Engineers of Sfax ENIS

2009-2012 Preparatory Cycle

Preparatory Institute at the School of

Engineering of Sfax IPEIS

2005-2009

Secondary education

Bir Ali High School 2

Computer skills: MAXIMO, Word, Excel, Microsoft Project, SolidWorks, Primarvira, Abaqus, CATIA, RDM, Automation Studio, Master Cam, COSMOS, MATLAB, WinRelais, CES, Autocad, Comsol,…

Languages:

o Arabic (Native Language)

o French (spoken and written)

o English (spoken and written)

2- PROFFISIONAL TRAINING AND SCHOOL



Contact this candidate