EDUARDO A. RAMBAL UTRIA
· Email:*******@*****.*** Phone: +1-828-***-****.
· Address: 386 17th Av. Ne Apto 09, Hickory, NC, Zip: 28601. PROFILE: PERSONAL DETAILS
During 22 years old my performance as Construction Supervisor or Construction Superintendent I was work different projects of high importance to maintain the oil production that world need, where executed welding and erection of piping of different inches of Carbon Steel, Stainless Steel, Hydro Test, Piping Insulation with Foam Glass, mineral wool, fabrication concrete support, oleoduct and gasduct pipeline welding, crew management, weekly meeting with subcontractor, Approvals or reject not conform issues.
Place of Birth:
Maracaibo, Zulia, Venezuela.
Gender:
Male
Driver’s License
EDUCATION:
Tittle: Date:
INDUSTRIAL ENGINEER From: 07-1992 To: 11-1997
University:
Politécnico Santiago Marino
BARCELONA / ANZOATEGUI / VENEZUELA
EMPLOYMENT:
Construction Superintendent:Jan/2024 – July 2024
Master Tex, LLC, Lawrenceville, Georgia.
Temporal Contract
COMERCIAL CONSTRUCTION PROJECT OLDPEACHTREE
· Underground HDPE Piping installation.
· Framing to apartment Installation
· Communication Panel Installation
· Web Rack Installation
· Optical Fiber underground Cable installation between Building
· Fire Protection System Installation
· Subcontractor Crew Management
· Sheetrock Installation
Languages Level
English Professional.
Spanish Native.
Italian Professional.
EDUARDO A. RAMBAL UTRIA
· Email:*******@*****.*** Phone: +1-828-***-****.
· Address: 386 17th Av. Ne Apto 09, Hickory, NC, Zip: 28601. EMPLOYMENT:
Construction SuperintendentJan/2013-Dec2023
Petrosuministros Edumil, CA VENEZUELA
· On site Project Management Subcontractor Team.
· Welding and Erection of Piping of different inches of Carbon Steel, Stainless Steel.
· Equipment Installation (Vessel, Separator Columns, heat Exchangers).
· Coordination with subcontractor and main contractor scope, priority work and assists in developing solutions to these problems.
· Review technical procedures, specifications, designstandards.
· Hydro Test to Piping different inches.
· Flushing to piping Before and After Hydro Test supervisions.
· Underground HDPE piping installation for utility and drain services.
· Internal Inspection to Vessel and Columns.
· Weekly meeting with subcontractor.
Construction Superintendent Feb/2011 – Dec 2012
Saipem Sonatrach ORAN / ALGERIA
· CRIOGENIC STORAGE LNG TANK I / II CONSTRUCTION PROJECT.
· Welding and Erection of Pipe Rack Structure over Tank Top
· Welding and Erection piping inside of Pipe Rack over Tank Top.
· Hydro Test to Piping different inches.
· Flushing to piping Before and After Hydro Test supervisions.
· Precommisioning (Punch List) and Commissioning (Star up of Piping)
· Weekly meeting with Sonatrach Main Contractor employees.
· Review technical proceduresWPS,PQR, specifications and Codes ASME, ANSI, design with Navis Sofware, Primavera, preserve building standards.
· Piping insulation.
Construction Mechanical Supervisor Nov/2010 –Jan 2011 Cadawhi-Icc,Ltda Chile.
· Fire Fighting System Installation Nestle.
· Groove fabrication to pipe different inches.
· Sprinklers System Installation on freeze and Dry Warehouse.
· Fire Fighting Hydrants installations.
· Piping perimeterinstallations to Nestle Warehouse.
· NFPA Diesel Pump installations
· Star up Fire Fighting System
Training :
· Not Destructive Test Level
II (UT,MT,PT)
· Welding Piping Procedures
· Management of codes
ASME, ANSI, API, NACE
· Failure Corrosion
Interpretation.
· Auto Cad Basic
· Advance Excel for Engineer.
EDUARDO A. RAMBAL UTRIA
· Email:*******@*****.*** Phone: +1-828-***-****.
· Address: 386 17th Av. Ne Apto 09, Hickory, NC, Zip: 28601. PIPING COORDINATORMay/2008 – Dec 2009
Tecnicas Reunidas Group SAUDI ARABIA.
· Contruction New GAS Train Facility GT5 / GT6
· Welding and Erection piping inside of Pipe Rack.
· Hydro Test toPiping different inches.
· Flushing to piping Before and After Hydro Test supervisions.
· Precommisioning (Punch List) and Commissioning (Star up of Piping)
· Weekly meeting with Aramco Employees to clarify all aspect of project progress
· Piping Insullation.
Welding and Static Enginner Sep/2007 – Dec 2007
Adgas Abu Dhabi United Emirates
· Shutdown GLN Train
· Fabrication Welding and erection of Piping
· Assembly of Reactor Columns
· Internal Trays Installations
· Level Gauge installation
· External Piping Installation on Columns