AREA OF EXPERTISE
Analysis of EHT tripping,
provide way forward and
system improvement plans to
Grid station maintenance,
Protection, Transmission
departments.
Substation testing,
commissioning and
maintenance.
Capable of ensuring the
efficient utilization of
manpower and assets keeping
all SOPs of safety (HSEQ).
Expertise in managing projects
from initiation till closing by
applying relevant knowledge,
skills, tools and techniques to
project activities in order to
meet project requirement i.e.
380KV substation, Static VAR
compensation(SVC), addition
of new line / transformer bays.
Ensure normalization of EHT
system in minimum possible
time through trouble shooting
and diagnosis of faults in the
system.
EDUCATION
2016
Bachelors of Technology(Electrical)
Preston University Karachi
2012
INTERMEDIATE/D.A.E Electrical
Govt. College of Technology.
2007
MATRICULATION
Science
Board of Secondary Education Karachi
PROFESSIONAL PROFILE
Dynamic and results-driven Protection Engineer by profession with over 10 years of experience in Electrical Generation/Transmission/Protection system Industry. Being a Creative Protection Engineer who can bring a fresh and energetic approach to project development and commissioning. Self-motivated, adaptable and bilingual, thrives in both work and an academic environment. I am able to work both individually and as a member of a team. I have great ambitions to succeed in the pursuit of an engineering career. I have successfully been able to maneuver my career till now in the best possible manner, setting standards wherever I worked. I have been a part of organizations that have helped me challenge my limits and in turn allowed me to gain indispensable knowledge of the creative field.
EXPERIENCE
KOREA ELECTRIC POWER CORPORATION (KEPCO) KPS
2nd August, 2021 to Present
Generator, Generator Transformer & 500kV GIS Substation Protection Maintenance Asst Engineer
1x660 MW Lucky Electric Power Company.
Responsible for corrective and preventive maintenance of GT,GIS,GENERATOR and its protection relays and associated auxiliaries, UPS, UATs, SSTs, MAT and Circulation water system motors etc.
K ELECTRIC 30th December, 2015 to 23 July 2021
Transmission & Substation Protection Engineer
EHT Network (Comprise of 220,132 and 66KV) tripping analysis.
Root cause analysis of tripping and provide way forward/solutions
Design review of new Substation projects
Setting calculation and configuration of distance, differential and OCEF relays
Monthly trend analysis of EHT line, Power Transformers and 11KV feeder tripping
Provide recommendations to site engineers based nature of tripping
Provide technical support to staff working on sites
Reviewing the primary and secondary drawings
Develop issue and implement commissioning programs and plans, commissioning schedule and Inspection and Test Plans (ITPs).
Familiarity with IEC and ANSI standards.
Develop Job Safety Analysis (JSA).
Understand and enforce Power System Safety Rules.
Data management of substation equipment’s.
Planning and implementation of replacement program of obsolete and faulty relays with modern numerical relays to avoid breakdown and unnecessary tripping.
Supervision and witnessing the installation and testing of protection systems for new projects to ensure specifications are met.
Monitoring downstream staff to ensure safety and accurate completion of work.
Testing & commissioning of Power Transformers 40MVA, 30/39MVA, 20/26MVA having voltage ratio 132kV/11kV, Auto Transformers 250MVA of ratio 220kV/132kV in which main test of transformer are:
Transformer Turn Ratio Test, Insulation Test, Winding Resistance Test, Short Circuit Test, Open Circuit Test, DDF Testing (Power Transformer, Bushing), Transformer Devices Test (Pressure Relieve Device, Diverter, Buchholz relay, Oil and Winding Temperature Test).
PROJECTS
Replacement of faulty Relay
REL316 (ABB) with commissioning
of new numerical siprotec relay
7SA522 (SIEMENS) on 132kV
Johar-KDA circuit, Relay REL316
(ABB) with relay D60 (GE) on 132kV
Johar-Malir circuit, Relay PYTC with
relay D60 (GE) on 132kV
Liaquatabad-Civic circuit.
Replacement of Siemens
make relay 7SA511 with
Siemens make relay
7SA522 along with testing
on Valika circuit at Surjani
Grid station.
Replacement of PYTC907
GEC make Distance relay
with 7SA511 (Siemens).At
Leyaqatabad-Haroonabad
circuit.
Testing and commissioning of
CHINT make 31.5/40MVA
transformer at Surjani Grid station.
Comprehensive Testing
(T.T.R, Winding
Resistance, Megger,
Short Circuit Test, Open
Circuit Test, C.N.D.F, and
Stability Test) carried out
of PEL make 40MVA
transformers at Malir
and Surjani.
Transformer Testing including
Turns Ratio, Winding Resistance,
Insulation resistance of bushing
and windings, C & DF of bushing
and windings, Short circuit Test,
Open circuit Test and Stability Test:
40MVA of 132kV/11kV
Transformer#02 at Valika Grid
Station.
40MVA of 132kV/11kV
Transformer#01 at Gadap Grid
Station.
Testing and Commissioning of 132
kV SF6 CT’s on 40 MVA
Transformer#01, 02, 03 at
Liaquatabad Grid Station and 132
kV VT’s on 132 kV North Karachi-
Valika Circuit at North Karachi Grid
Station.
Carried out Tele protection Testing
on following 132kV circuits.
Gulshan-Hospital, Gulshan- Jail
Road, KDA-MemonGoth, KDA-
Maymar.
PIPRI-KDA circuit. Gulshan-Civic
Center Circuit. Leyqatabad-Valika
Circuit.
Circuit Supervision installed at 132kV/22kV and 132kV/11kV EHT Network.
Setting calculations relay parameterization/programming and testing of Distance, Differential and over current and Earth Fault Relays of various manufacturers (i.e. Siemens Siprotec, Areva, GEC etc. installed at 220kV, 132kV, 22kV EHT and HT Network.
Relay communication using software DIGSI 4.9, PCM600, ENERVISTA, MICOM S1 Studio (Areva), Alstom (Presentation and Analysis of Disturbance Recording Data with Eview) used for relay parameterization, fault disturbance records, events data retrieving and analysis purpose.
Testing features of Distance Relay using ISA-DRTS6, OMICRON CMC 256/6/356
Experience of operating various testing equipment’s i.e.Programma Sverker 650/750.
ISA T1000 relay test set (Secondary Injection Test Set).
Megger MultiAmp Transformer Ohmmeter (Winding Resistance Test Set).
AVO Megger Series 1-5000(5kV Automatic Insulation Tester)
Bridle (1 and 3 Phase TTR), Programma PAM 360 (Phase Angle Meter).
Megger Earthing Resistance Test Set.
Secondary Injection Test Set ISA DRTS-6, OMICRON CMC-256/6.
11kV Switch contact resistance and 132kV breaker contact resistance test using Programmer Breaker System Analyzer TM1600.
Testing and commissioning of 11kV, 22kV, 132kV and 220kV Current Transformers
(CTs) and Potential Transformers (VTs).
Working on Following Protection Relays:( 50/51, 87L/T/B, 21, 81, 50BF, 87N etc.
SIEMENS --- 7SA511,7SD62,7SD8011,7UT612-
3,7SJ511,7SJ602,7SJ80,7SS52,7RW6000,7VK61 etc.
ABB --- REF 543, REC 670, RET 670, REL 670, REL 316*4, RED 670 and REB 670.
ALSTOM/AREVA/SCHNEIDER ELECTRIC --- Micom P115, P120, P122, P443, P543, P631, P632, P746, P821, P923, KVGC.
GE --- MIFII P100, D60, OPTIMHO LFZP, PYTC907.
STATIC RELAYS --- MCGG- O/C AND E/F
MBCH- DIFFERENTIAL, MCTI- BFR, MAVS- SYNCHROCHECK
ELCTROMECHANICAL RELAYS --- CDG 61 –O/C AND E/F, ICM 21 OC & E/F, D 202 Differential, LZ 31 Distance.
AMRELI STEELS PVT.LTD July 2013 to Nov 2015
Facilities Supervisor
Mode of Work: Maintenance Supervisor related to BMS System & 11KV Substation Projects
Supervising testing and commissioning of new 11KV Substation equipment i.e. CTs, PTs, Bus bars, Transformers, MV Switch gears and testing of its protection relays.
Work scheduling monitoring and control of contractor activities.
QA/QC monitoring and record keeping of the project
Progress evaluation, billing and invoice presentation, safety and loss prevention
Review all Construction Contractor’s Design Submittals including detailed design calculation, structural design and analysis, construction drawings, installation details and other similar/related activities and ensure that all design details submitted by construction contractors comply with Company’s requirements
Maintain quality control procedures for installation of the projects and monitor all inspection functions
Inspect all contractor’s incoming materials for damage and for compliance with Contract’s Technical Specifications.
Hold weekly construction progress meetings separately with Contractors to determine work progress, discuss problems, coordinate actions, plan and anticipate future requirements.
Witness all field testing of the projects and all component parts of the projects by the contractors or their appointed inspection agencies in their entirety.
Inspection of the entire work performed under the construction contracts.
Preparation of Daily, Weekly and Monthly progress report of the project SCHNEIDER ELECTRIC May2010 to April2013
Associate Engineer
Mode of Work: Electrical Supervisor Projects
Supervision of Testing and commission of L.V and M.V panels.
Responsibilities of L.V, M.V Panels & DBs installation.
Provide technical support to staff working on sites
Commissioning and testing of 11kV, Feeders, Transformers its protection and control panels
PROFESSIONAL
CERTIFICATION& TRAININGS
Attended 3 days workshop on Siemens
relays with DIGSI software
(Distance,Transformer/Line Differential,
Bay control unit, Breaker failure, Bus
bar protection) at
attended three day workshop on line
distance protection type D60 at Days
inn hotel Karachi.
Three days workshop on STS 5000
test set for substation maintenance
(CT’s, PT’s, Transformer, Transmission
line parameters) testing.
Attended Tangent Delta CPC80-
CPTD1 Training in Karachi.
one day training course on test set
Winding Ohmmeter RMO20TW
(Winding resistance).
Completed 3 Days professional
training of fiber optics splicing.
Siemens protection relays
General Electric
ISA
Omicron
DV Power (Prescon)
Fiber Optic Splicing
Monitor Contractor’s work schedule. If the actual work completed by the Contractors is less than the forecast, suggest appropriate corrective actions to be taken by the Contractors.
Commissioning and testing of 11kV, Feeders, Transformers its protection Relays and control panels
CORE COMPETENCIES
Versatile, Intellectual and high-performance engineer with project management and technical skills.
Excellent Interpersonal, communication, influencing, negotiation and presentation skills.
PERSONAL INFORMATION
Date of Birth: 16 /07/91
Marital Status: Single
Religion: Islam
Nationality: Pakistani
Language: English/ Urdu
REFERENCE
Will be furnished upon request.
P.S: (Willing to relocate as per job requirement)