Post Job Free
Sign in

Computer Technician High School

Location:
Quezon City, Philippines
Posted:
September 01, 2024

Contact this candidate

Resume:

VENERANDO A. CUMAD JR.

Blk.** Planters Berm.Westbank Floodway,Cainta Rizal Phillipines.

Mobile: +639*********

Email: ********@*****.***

POSITION APPLIED : Production workers

TRAINNING :Certification of Trainning in FET Tester Model 3400

:Certification of Completion in Computer Technician

Practicum

SKILLS :Repair any kind of Electronics and Electrical Devices

EDUCATIONAL ATTAINMENT:

Vocational :Computer Technician 1990-1992

Computron Computer Training Center

1665 Rizal Avenue, Olongapo City

Secondary :Olongapo City National High School 1986-1990

Rizal Avenue, Olongapo City

Elementary :Balamban Central Elementary School 1980-1986

EMPLOYMENT HISTORY:

Position : (Self-Employed) Electrician

Inclusive Date : January 10, 2018 to Present

Nature of Work : Read and enterpret technical shop manuals, manufacturer's specifications and wiring schematics pertaining to systems to design and install special eguipment.

: Follow detailed oral and written instructions in the fabrication and installation or repair of reguestedeguipment.

: Visualize an idea and develop a working model to fabricate unusual or very special eguipment.

: Establish and maintain effective working relationships with those contacted in the course of assignments.

: Earn to use personal computer to monitor inventories, order parts and supplies, and write reports.

: Record accurate informations on pre-formatted forms, such as reguisitions, cost estimates Time and material records.

: Communicate ideas to shop personnel regarding the design and installation of eguipmentmodefications.

: Read and interpret blueprints or sketches in fabricating eguipment and other articles.

:Acguire additional skills to maintain technical competencies.

Institution Company : Al Fanar Co.

Riyadh, Saudi Arabia

Saudi Electric Company

Tel no: +966*********

Website : www.alfanar.com

Position : Senior Electrician/Technician

Inclusive Date : March 25, 2015 to December 31, 2017

Nature of Work : Prepare tools, material and daily report

: Engaged in erection of ALSTO ABB 380KV Gas insulated switch gear (GIS)

: Engaged in erection of ALSTOM 380/132KV of Power

transformer

: Pipeing,Wiring and lights installations of perimeter lights

: Layout and installation of cable tray

: Cable glanding and termination of power and control cable

: Set up and installations of control panel

: Assist in testing and commisioning

: Preparing testing equipment and Apparatus

: Cable pulling

: Termination of all control cables

: Set-up and installations of switch gear panels

: Connecting and Installing of Bus bar to switch gear panel to panel

Institution Company :Metrix Qatar W.L.L

MEP Contractor

Tel:+974********

Fax:+974********

E-mail:******@*********.***

Web:www.metrixmep.com

Position : Building Electrician

Inclusive Date : June 24 2012 to July 06 2014

Nature of Work : Develop complete understanding of contract plans and specificationand plan, lay-out, install and/or repair all types of pipe and/or similar tubular products in accordance with those plans and specifications.

: Read and understand plans and specifications, including isometric and orthographic drawings.

: Follow established job-site safety regulations and maintain a safe and clean work area.

: Inspect subordinate's work for compliance with the contract plans and specifications. Point out deficiencies and explain, and take any corrective action needed.

:Use appropriate hand and power tools and properly measure, cut, assemble, weld and install all test installed piping systems and install all other related items in accordance with the applicable plans and specifications; bolt, clamp or weld parts to secure in position for welding; weld components according to specifict process and code.

: Install all other items in accordancewith the applicable plans and specifications.

: Produce guality work, meeting reguirements of plans, specifications and industry standards.

: Perform all other job related duties by supervisor.

Institutional Company : TEMEC, Telefuncken

Microelectronics (Phils.) Inc. Telefuncken Building

Bagsakan Road FTI Estate, Taguig Metro Manila

Position : Test Maintainance Technician

Inclusive Date : October 10 1995 to May 10 1998

Nature of Work : To keep all test equipment at excellent working condition at all

times, Maximize machine efficiency and keep downtime at

minimum level setup different device package and

handler convertion. Do some special project for

equipmentperformance development. In close coordination

with the production and Product Engineering groups to achieve

goal of yield,qualitative and productivity. Do other task as my

superior directs me.

Institution Company : COMPUTRON INC.

91 Fendler St. E.T Olongapo City

Tel: 222 4202 Fax: 2223992

Position : Messenger

Inclusive Date 1990 to 1992

Institution Company : SAM’S AMUSEMENT ENT., INC.

91 Fendler St. E.T Olongapo City

Tel: 222 3717

Position : Helper Cook

Inclusive Date : 1988 to 1990

PERSONAL DATA

Birth Place :Misamis Oriental

Birth Date :June 01 1971

Age :53

Height :5"3

Civil Status :Married

Citizenship :Filipino

Religion :Roman Catholic

Character Reference :Atty. Agnes Maranan

Coconut st. corner Guava,

Greenwoods Executive Village

Cainta Rizal Phillipines

Mobile: +639*********

Other Details

PASSPORT No. : P1968819A

N.B.I No. : 38811781

S.S.S No. : 02-1338215-9

PHILHEALTH No. : 01-025259600-9

PAGIBIG No. : 000*******-**

T.I.N No. : 135-364-828

"I hereby certify that all of above information are true and correct to the best of knowledge and belief "

Venerando A. Cumad Jr.



Contact this candidate