Post Job Free
Sign in

Mechanical Engineer Maintenance Supervisor

Location:
Brampton, ON, Canada
Posted:
August 31, 2024

Contact this candidate

Resume:

ANANDSHANKAR

**** ********* **. ****** ** N*Z *B*

# 647-***-**** Email: ***********@*****.***

PROFESSIONAL PROFILE

OBJECTIVE: To obtain a position as a Mechanical Engineer Over 9 years of engineering experience in working on a variety of infrastructure and industrial projects encompassing manufacturing, power plant, mechanical utilities, facility, process, instrumentation and design including materials handling, industrial ventilation, pumping and piping systems. A proven record of undertaking managing engineering projects from concept to completion on time and within budget . TECHNICAL EXPERIENCE

O-I Glass Brampton ON

Lead Hand Jan 2021- Dec. 2023

• Oversee operations to ensure the reliability of industrial chemical production during the shift including maintenance of facility and production equipment

• Ensure zero break down by implementing preventive and predictive maintenance (PPM) programs while being responsive to any production delays

• Troubleshoot, diagnose and repair a wide range of utility equipment as well as production machines, packaging equipment, and fire alarm system

• Manage special projects such as the modification and installation of new machines, utility upgrades and assisting with commissioning

• Interpret engineering drawings, and work with hydraulic and pneumatic systems; assemble machine parts such as bearings, gearboxes, universal shafts etc. working with close tolerances • Apply strong documentation skills together with mechanical knowledge of machines and tools, including their design, uses, repair, lubrication and general maintenance

• Use PMC plant maintenance and SAP module material management for total productive maintenance (TPM), and inventory control

Magna International Concord ON

Maintenance Supervisor Dec. 2018- Jan. 2021

● Installed new Extrusion Lines

● Installed IR Compressors

● Installed cooling tower for the Chiller plant

Gibraltor Mines Williams Lake BC

Team lead Projects Winter 2017-2018

• Provided technical leadership while working on a variety of mining projects installing mechanical equipment and process piping in the concentrator and molybdenum process at the Gibraltar Mine Site, including agitators, slurry pumps, sludge pumps, motors, gears, associated lube systems, air systems and movable feed chutes

• Administered overall works from start to installation and commissioning of various projects, including the design of pipes required for new pump; preparing equipment layouts per design codes, general piping layouts, support design, selection and detailing; using PDS modeling; and ensuring the quality of work was completed in accordance with standard code of practice Page 2 of 2 Anandshankar

Plastmo Brampton ON

Maintenance Supervisor 2016-18

• Managed the preventative maintenance and coordination of maintenance activity to facilitate utility maintenance and manufacturing operations, including complete equipment overhaul during shutdown, PPM and audits

• Ensured production lines continued to operate efficiently while managing new projects and maintaining a healthy and safe work environment

PENINSULA ALLOY INC., Fort Erie, ON

Project Engineer, 2013-2015

Power Plant Project • Coordinated technical activities for the mechanical erection of a power plant, including the installation and commissioning of a 1650 HP Diesel generator • Planned, scheduled, conducted and coordinated assigned engineering work, and monitored work for compliance to applicable codes and accepted engineering practices

• Ensured that all assigned personnel were coordinating their activities with other project participants and that the requirements of the contract were being satisfied

• Forecasted, coordinated and checked engineering deliverables, project status report and change orders, and followed through to resolve engineering and management project issues DEBIASI GROUP OF COMPANY (DBG), Mississauga, ON

Assistant Engineer 2010-2012

• Applied the 5S methodology to reduce waste and optimize productivity by maintaining a well organized workplace

• Designed and used visual cues to achieve more consistent operational design for processes, also designated tools and fixtures, and operated various Tool Room machine tools to manufacture precision machine parts

EDUCATION & PROFESSIONAL DEVELOPMENT

• Diploma in AutoCad and SolidWorks, 2008

• B.E. in Mechanical Engineering,2005-2006

COMPUTER SKILLS

• Bachelors of Engineering, P.Eng,Solid works, SAP MM module, Supervisor, Millwright Lead hand



Contact this candidate