Post Job Free
Sign in

Maintenance Worker Customer Service

Location:
Schenectady, NY
Salary:
26.00
Posted:
October 07, 2024

Contact this candidate

Resume:

ERROLL JAGOO

Atlanta, GA ***** 518-***-**** ***********@*****.***

Hardworking Job Title bringing Number+ years of experience performing diverse maintenance and repair duties. Dedicated to maintaining optimal equipment functionality by managing routine and complex equipment and facility matters. Strong knowledge of hand and power tool operation and safety measures. Reliable Maintenance Worker skilled in safely operating floor polishers, moving heavy furniture and repairing roofs and ceilings. Number-year background ordering cleaning supplies, removing trash and recyclables and conducting restroom repairs. Detail-oriented team player with strong organizational skills. Ability to handle multiple projects simultaneously with a high degree of accuracy. Root Cause Analysis

Knowledge of Industrial Standards

Verbal and Written Communication

Preventive Maintenance

Drywall Painting

Light Carpentry

Hand and Power Tool Operation

Electrical Component Replacement

Maintain Equipment

Wiring Installation and Repair

Troubleshoot Malfunctions

Carpentry

Maintenance Engineer, 03/2017 - Current

Hilton – Atlanta,GA

Developed preventive maintenance schedules to minimize downtime and optimize performance. Completed installation of drywall sheets on commercial and residential properties. Applied tape to seal joints by embedding into sealing compound. Removed damaged drywall and wallpaper to prepare for new installations. Received consistent excellent feedback on work quality and customer service. Repaired plumbing systems, components, and equipment. Measured, threaded, and cut materials to correct angles. Selected type and size of piping required for each project. Achieved accurate alignments with help of plumb bobs and chalk and laser measuring devices. Used brushes and rollers to eliminate wrinkles or bubbles from hangings and produce top-notch finishes. PROFESSIONAL SUMMARY

SKILLS

WORK HISTORY

Painted walls, ceilings and other surfaces with sponges, rolls, brushes and spray guns. Applied high-quality decorative fabrics and wallpapers to interior walls and ceilings with expert skill and attention to detail.

LeadMan Homecontractor, 03/2014 - 02/2017

Norm Warner Construction – Schenectady, NY

Confirmed that finished products met internal and external requirements to promote uniform quality standard.

Managed work site operations to facilitate adherence to predetermined production schedules. Completed installation of drywall sheets on commercial and residential properties. Applied skills in taping, sanding and finishing drywall to meet project specifications. Removed and replaced damaged drywall to complete repair and restoration projects. Used diverse variety of tools and equipment for safe installation of drywall. Installed tile flooring in residential homes and commercial buildings. Created watertight finish on tiles by sealing surfaces and adding grout. Took measurements and studied floor sketches to calculate area to be floored and amount of materials needed.

Skilled at working independently and collaboratively in a team environment. Worked effectively in fast-paced environments.

Leadman Contractor, 05/2009 - 03/2014

Ryan Nakhul Construction – Schenectady, NY

Trained and mentored new employees to enable safe and efficient job performance. Managed work site operations to facilitate adherence to predetermined production schedules. Applied caulk, sealants and other agents to installed surfaces. Spread compound material over taped areas, flats and butts. Accurately read, understood and carried out written instructions. Carried tools and materials to job site and set up scaffolding properly. Used scaffolding and ladders to work on high ceilings. Excellent communication skills, both verbal and written. Used critical thinking to break down problems, evaluate solutions and make decisions. Paid attention to detail while completing assignments. Built and installed cabinets, countertops and shelving to provide additional storage and working spaces. Hung sheetrock and drywall by attaching panels to studs, cutting adjoining panels and making cutouts around outlets and switches.

Checked for plumbing issues to replace or repair faucets and pipes. Spread adhesives on flooring to prep for tile installation. Held timber, lumber and paneling in place for fastening or cutting. Collaborated with architects, designers and homeowners to meet project goals. 06/2002

Long Island Home Studies - Long Island NY

EDUCATION



Contact this candidate