Post Job Free
Sign in

Civil Engineering Heavy

Location:
Al Dafna, Qatar
Posted:
October 07, 2024

Contact this candidate

Resume:

CURRICULUM VITAE

Name : P. Krishna Kumar

Qualification : KGCE Certification – Civil Engineering

: Diploma in Civil Engineering

Address (Qatar) : P.O. Box # 22056, CCC/T

Doha – QATAR

Tel: No. 009**-******** (Mob, Qatar)

Email : : **********@*****.***

Address (India) : Palakkotal House,

Post. Kunnamthanam,

Via. Thiruvalla – 689 581, Kerala India

WORK EXPERIENCE : 32 years of Gulf Countries experience in Heavy Civil Project Construction such as Petrochemical Plants, Oil& Gas Industry, Power Plants, Pumping Station, Infrastructure, Underpasses & Overhead bridges including Pile foundations.

1)August 2022 to Present

Company : Consolidated Contractors Co. Qatar

Project : Ras Laffan Petrochemical Project (Early-Stage Works)

Site Preparation and Construction of TSF

Client : Qatar Energy & Chevron Phillips

Position : Construction Superintendent (interim) - Civil

Responsibility : Coordinating and executing civil part of the project for the various civil construction activities for wastewater treatment plant, pipeline work, long distance high voltage cable installation work etc. Leading team for conducting pre-route approval surveys, trial pits to identify the route, trench excavations in RLIC common areas and final finishing of works. Keeping good communication with client, RLIC and subcontractors to resolve all execution issues including constructability, permits and technical approvals etc.

2)August 2021 to July 2022

Company : Consolidated Contractors Co. Qatar

Project : North Field Expansion (NFE) – Pioneer Camp, Ras Laffan

Construction of Pioneer Camp and Related Infrastructures.

Client : Qatar Energy

Position : Sr. Civil Supervisor

Responsibility : Coordinating and executing civil part of the project for the various civil construction activities for camp construction, wastewater treatment plant, pipeline work, long distance high voltage cable installation work etc. Leading team for conducting pre-route approval surveys, trial pits to identify the route, trench excavations in RLIC common areas and final finishing of works. Keeping good communication with client, RLIC and subcontractors to resolve all execution issues including constructability, permits and technical approvals etc.

3)September 2018 to July 2021

Company : Consolidated Contractors Co. Qatar

Project : Construction and upgrading of Mesaimeer Road Project

(Sabah Al Ahmad Corridor) -UMRP

Client : Ashghal (PWA)

Position : Sr. Civil Supervisor

Responsibility : Working with civil department. Duties including supervising of excavation, Concreting, Dry & Wet Utilities & Road

Works, etc.

4)August 2017 to August 2018

Company : Consolidated Contractors Co. Qatar

Project : Qatar Integrated Railway Project - Doha Metro

Design and Build - Msheireb and Education City Stations (Major Stations ) Take over and completion Contract.

Client : Qatar Rail

Position : Civil Supervisor

Responsibility : Working with civil department. Duties including supervising of excavation, Concreting, Finishing, etc.

5)January 2015 to July 2017

Company : Consolidated Contractors Company. Qatar

Project : RAH Project

(Roads & Infrastructure at Rawdat Abal Heeran)

Client : ASHGHAL

Position : Civil Supervisor

Responsibility : Working with civil department. Duties including supervising of excavation and Backfilling for Dry & Wet Utilities and

Earthworks for Roads Pavements

6)June 2012 to December 2014

Company : Consolidated Contractors Company. Qatar

Project : F-RING Road project (FMWP)

Client : KBR

Position : Civil Supervisor

Responsibility : Working with civil department. Duties

including supervising of excavation,

Concreting, interchanges, Road works, etc.

7)December 2011 – to June 2012

Company : Consolidated Contractors Int’l Co. Qatar

Project : Qatar Faculty of Islamic Studies Project (QFIS Project)

Client : Qatar Petroleum

Position : Civil Supervisor

Responsibility : Working with civil department. Duties

including supervising of excavation, piling,

steel structural etc.

8)August 2006 – December 2011

Company : Consolidated Contractors Int’l Co. Qatar

Project : New Doha International Airport (ATC Project)

Client : Qatar Petroleum

Position : Civil Supervisor

Responsibility : Working with civil department. Duties including

Supervising of excavation, piling, steel structural

and tower foundations wok of 90-meter height Air

Traffic Control Tower and support facilities.

9)Sept 2004 – August 2006

Company : Consolidated Contractors Int’l Company – Qatar

Project : Ras Laffan to Mesaieed Sweet Gas Pipeline Project

Client : Qatar Petroleum

Position : Civil Foreman

Responsibility : Working with Civil Department. Duties including

supervising of excavation, formwork, reinforcement

for control building, equipment foundations, internal

road works, cable trenches, etc.

Co-coordinating with Main Contractor and Client.

10)February 2003 – Sept 2004

Company : Consolidated Contractors Int’l Company – Qatar

Project : Common Cooling Water Project, Ras Laffan

Client : Qatar Petroleum

Position : Civil Foreman

Responsibility : Working with Civil Department. Duties including

supervising of excavation, formwork, reinforcement

for heavy pipe supports, control building, heavy.

equipment foundations, gas turbine foundations,

compressor foundations, internal road works, cable

trenches, etc.

Co-coordinating with Main Contractor and Client.

11)Feb. 2001 – Sept 2003

Company : Consolidated Contractors Int’l Company – Qatar

Project : Dukhan Field Gas Lift Project

Client : Qatar Petroleum

Main Contractor : Snamprogetti

Position : Civil Foreman

Responsibility : Working with Civil Department. Duties including

supervising of excavation, formwork, reinforcement

for heavy pipe supports, control building, heavy.

equipment foundations, gas turbine foundations,

compressor foundations, internal road works, cable

trenches, etc.

Co-coordinating with Main Contractor and Client.

12)May 1999 – Feb 2001

Company : Consolidated Contractors Int’l Company – Qatar

Project : Qatar Vinyl Co. Mesaieed, Qatar

Client : Qatar Petrochemical Industries

Main Contractor : Krupp Uhde, Germany

Position : Asst. Civil Foreman

Responsibility : Working with Civil Department. Duties including

supervising of excavation, formwork, reinforcement

for 4 nos. Gas turbine tank for Ethylene dichloride, control building, concrete pipe rack, boiler foundations, vessel foundations, pump foundations, heavy storage tank foundation, all related equipments foundations for Petrochemical Plants.

Co-coordinating with Main Contractor and Client

13)June 1997 – Dec. 1998

Company : Consolidated Contractors Int’l Company – Qatar

Project : Ras Laffan Liquified Natural Gas Company

Client : Qatar Petroleum

Main Contractor : JGC Corporation, Japan

Position : Asst. Civil Foreman

Responsibility : Working with Civil Department. Duties including

supervising of excavation, formwork, reinforcement

for 6 nos gas turbine foundations, elevated

compressor foundations, control and administration

buildings, concrete pipe rack boiler foundations,

vessel foundations, pump foundations, heavy

storage tank foundations, storm water drainage

systems and all related equipments foundations for

gas plant.

Co-coordinating with Main Contractor and Client

14)June 1996 – May 1997

Company : Consolidated Contractors Int’l Co. – Kuwait

Project : Eqete Ethylene Project EEP)

Client : Kuwait Petrochemical Industries

Main Contractor : Flour International Ltd and Brown & Root (USA)

Position : Asst. Civil Foreman

Responsibility : Working with Civil Department. Duties including

supervising of excavation, formwork, reinforcement

for gas turbine foundations, heavy elevated

compressor foundations, heavy furnace

foundations (16 nos.), flare foundations (for 90mtr

height), control and administration buildings, pipe

rack foundations, concrete cable trenches, vessel

foundations, pump foundations, heavy storage tank

foundations, storm water drainage systems and all

related equipment foundations for Petrochemical

Plan.

Co-coordinating with Main Contractor and Client

15)Dec. 1993 – April 1996

Company : Consolidated Contractors Int’l Co. –Abu Dhabi

Project : Onshore Gas Development Project – OGD1

Client : Abu Dhabi National Oil Company (ADNOC)

Main Contractor : Bechtel & Technip Joint Venture

Position : Asst. Civil Foreman

Responsibility : Working with Civil Department. Duties including

supervising of excavation, formwork, reinforcement

for gas turbine foundations, heavy elevated

compressor foundations, heavy elevated

compressor foundation, flare foundations, control

and administration buildings, pipe rack foundations,

concrete cable trenches, vessel foundations, pump

foundations, heavy storage tanks foundations, main

gate house, storm water drainage systems and all

related equipments foundations for Gas plant.

Co-coordinating with Main Contractor and Client.

16)March 1992 – Sept 1993

Company : Target Engineering Company LLC, Abu Dhabi

Project : Gas Turbine Package Units at Abu Dhabi and

Al-Ain Power Houses

Client : Water & Electricity Department – Abu Dhabi

Main Contractor : Merz & Mecaline

Position : Civil Foreman

Responsibility : Working with Civil Department. Duties including

supervising of excavation, formwork, reinforcement

for gas turbine foundations, cable trench, control

building, transformer foundations, pump

foundations and internal drainage system.

Co-coordinating with Main Contractor and Client

17)Nov. 1985 – March 1992

Company : Michigan Engineers Pvt. Ltd., Mumbai (India)

Position : Civil Supervisor cum Surveyor

Responsibility : Working with Civil Department. Duties

including supervising of pile foundations for staff

quarters building construction at Antop Hill, Mumbai.

Storage tank construction for CTTL (Ceramic Terminal Trombay Ltd.) Tank dia 45 mtr, height 12 mtrs. Wall thk. 1 mtr with 70mm pre-bored cast in-situ concrete piles.

Construction of Sewage Pumping station at Bhandup, construction of inlet chamber, wet-well, Dry-well, 1500mm force main (pipeline) and grit chamber with Binne and Partners (US based consultants) capacity of pump station 456 MLD (Million ltr per day).

Construction of 23 mtr. Composite Girder bridges at Bhopal Over Betwa and Bina Rivers. Work includes 1200 dia. Pile foundation, 18 mtr. High piers, 1.5 mtr. high abutments and earthwork embankments.

Fair knowledge in pre-cast and in-situ pile foundations, preparing of Bar bending schedule, taking quantities, preparing of bills.



Contact this candidate