CURRICULUM VITA

Candidate

Information

Name: Tajinder Pal Singh Date of birth: 02.02.1986

Passport No: X6563462

Date of expiry: 21.03.2033

Languages known:

To speak: English & Hindi

To read & write: English & Hindi

Sex: Male

Nationality: Indian Driving license & country: India Total year of Experience in L&T:

9 Years 5 Months (Kuwait-UAE)- (Presently

working in same company)

Outside L&T experience: in India.6 years

and 3 months.

Total overall Experience: 15 Years 8 Months.

Professional

qualifications

including year of

passing

Qualification Year of passing

B. TECH In Electrical April ’2007

Present

Employer – L&T

Designation ASST. Manager – Electrical

Date of Joining 04.04.2018

Name of employer Larsen & Toubro Limited (PT&D, UAE) Address of employer

P.O.Box 63671, Shk. Abdullah Bldg. Flat No.

206, Al Qasimiya Street, Sharjah – U.A.E

Experiences as Project / Site engineer for different types of Power Transmission & Distribution projects. Extensive Project knowledge in Medium Voltage, High and Extra high voltage substations, operation and maintenance of Power Transmission & Distribution System HV/LV equipment. Practical experience was established in many reputed projects including 400/132/115/110/34.5/33/11/4.16 kV AIS / GIS substations and 132 /33/ 11kv Transmission line and Cable laying in India, Kuwait (oil and gas field), and U A E. Fully aware of DEWA /AADC/ADDC/TRANSCO procedures and regulations especially related to HSE – approved by “ DEWA “ and “Competent Person” by AADC. Summarize professional experience over the last 15 years 8 Months, in reverse chronological order. Indicate particular technical and managerial experience relevant to the project. Experience Summary

From To Company / Position/ Project / Experience

Apr’18 Till date

Name of the Organization - Larsen & Toubro Limited Designation - PROJECT. ENGINEER (ELECTRICAL)

Project: -

Supply & Installation of 4nos 33/11kV Brick built primary Substations in Alain city for AADC Power network growth. - 4 Nos Gis s/s- 3 PU’S - 33kv Transmission line and 33/11kv cable laying.

Supply & Installation of 33/11kV Brick Built Primary Sub-Station For new development in Al Ain Feydha area and Relocation of P/U’S- 5 S/S- Involve

in Commissioning of 2 no's s/s.

* GIS -33 KV, 14bays- M/S Schneider Electric.

* AIS 11KV – M/S TAMCO.

* Transformer: - 20MVA 3NOS M/S Federal and M/S Schneider Electric.

Supply & Installation of 132KV cable laying project under DEWA contract: - PO#309-***-****

Supply & Installation of 132/11KV SRAYATST S/S –DMCC-DEWA

Supply & Installation of 132KV 15MVAR SHUNT REACTOR WORKS AT KHORDXB, FINCNTRD, RSHDPORT AND BSNSTOWR 132/11 kV S/S AND ASSOCIATED

Role & Responsibilities:

Preparation of overall project schedule coordinating with planning engineer, oversee construction.

Coordinating with client for 132kV power cable, Fiber optic cable, joint and termination material SRC safe receipt certificate for raising the invoice and start the installation works at site.

Coordinating with cable manufacturer, jointer and terminator team for cable installation works.

Responsible for the overall execution of the 132kV cable works.

Preparing schedule for cable laying, jointing, and termination and testing activities as per project baseline schedule.

Manage the Execution of all electrical equipment power transformers, Installation of 33KV Gas insulated switchgear,11KV Switchboard, LT panels, Battery & charger, 33KV and 11kv HT & LT Cables etc.

Coordination with O/E & Engineering team for design stage comments.

Plans, organizes, and ensures adequate staffing, execution, and monitoring of all field engineering activities and related support operations.

Provides guidance regarding scope of work, schedules, procedures, field construction problems, and other technical information.

Establishes, monitors, and maintains construction engineering quality control in the field.

Collaborates with construction Team to eliminate any hazards associated with the work that may adversely affect the environment or the safety or health of employees.

Establishes and maintains a close working relationship with project design engineers, client representatives, and contractors.

Maintains project control documentation, design drawings and specifications, back charge documents, change orders, etc.

Monitors sub- contractor performance pertaining to schedule and conformance to plans and specifications.

Coordinating for material quantification/Procurement, design approvals/timely submission of design documents, vendor coordination etc. to accelerate overall project activities.

Coordinate with store and vendor team for the delivery of electrical equipment and other electrical items.

Preparation of BOQ as per the construction drawings.

Vendor engineer co-ordination for major equipment storage and installation.

UG Cable laying New, Cable Route proposing, NOC Submission & follow for Cable Routes and Coordination with sub-contractors & Suppliers.

Studying all construction drawings/documents and its updates in terms of construction methodologies in coordination with other disciplines/contractors/sub-contractors prior to construction and to give proper extensive explanation to the team of work.

Managing simultaneous work group with all aspects of task's development, follow up task progress and time schedule for the projects.

To monitor and assign work to Field engineers in accordance with Organization’s policies and procedures.

To undertake team briefings to ensure all aspects of work are understood by all concerned parties.

To ensure that safety standards and procedures are implemented and followed in accordance with contract requirements and Organization guidelines.

To undertake QC reporting interaction with other departments of Organization and Customer to assure production schedules and deliveries are met.

Review of Electrical layouts, SLD, erection & Installation drawing.

Review of Document Transmittal Sheet (DTS), IEEE Standards & Specifications.

Review contractor/ vendor document for client approval.

Submit weekly/Monthly progress report and two weeks ahead program to the consultant and client.

Review project variation order/contractor SOW documents.

Maintain all approved DTS/test reports/MOM/Documents at project office.

Site supervision& inspection for all electrical activities each stage. Follow up contractor documents for client approval.

Conduct toolbox talk with HSE engineer and ensure the safety at site.

Meeting with contractor to solve project related issues.

Managerial skills, good Communication skills, computer literacy, Engineering of Industrial Process in Electrical at different sectors.

Conversant with various Symbols and Standards, with the Knowledge of HSE Safety Practices associated with Industry.

Aggressive, Hard Working and Result Oriented and having strong Presence and Confidence

Have ability to lead a Team of Technical as well as Manual to maintain harmonious working relationships with Client satisfaction.

Co-ordination of Testing & commissioning for HV Substations, Package Unit.

Follow up all RFI/MRI/NCR/FCR comments. To be responsible and report on the scheduling of man/material movements for all aspects of construction. Feb ’14

Feb’18

Name of the Organization - Larsen & Toubro Limited Designation - Site –Manager (ELECTRICAL)

Supply & Installation of 7nos 132/11kV Substations of MEW under Package 4433, Kuwait. 7 no’s GIS SUBSTAION. (Completion of Erection and commissioning of 2 Nos S/S in OIL and GAS field KNPC-KOC.)- 132 kv Cable laying.

GIS -132KV 13bays- M/S HYNDAI HEAVY INDUSTRIES, KOREA

Transformer: - a) 30MVA 4 Nos (b) 250 KVA 2Nos M/S AL-AHLEIA, KUWAIT

Supply & Installation of 1 no’s 132/33/11kV Substations of MEW under JO includes 132 KV Transmission line From KOC to JO S/S.

Supply & Installation of 8nos 132/11kV Substations of MEW under Package 4737, Kuwait. 8 no’s GIS SUBSTAION.

GIS -132KV 13bays- M/S CROMPTON GREAVES, HUNGERY

Transformer: - a) 30MVA 3 Nos (b) 250 KVA 2Nos M/S AL-AHLEIA, KUWAIT

EHV/HV/LV Control and fiber cables along with end termination & straight through kit. Role & Responsibilities:

Planning the erection schedule and solving Constraints by Coordinating with customer

(MEW-KNPC-KOC), Subcontractor, supplier, and internal department for to complete the erection within the target dates without any extra cost implementation..

Manage the Execution of Transmission line and all electrical equipment power transformers, Installation of Gas insulated switchgear,11KV Switchboard, LT panels, Battery & charger, 132KV and 11kv HT & LT Cables etc.

UG Cable laying New, Cable Route proposing, NOC Submission & follow for Cable Routes and Coordination with sub-contractors & Suppliers.

Preparation of Engg. Schedules/Construction schedules up to handing over in line with contractual milestones.

Attending the meeting with MEW and contractors for projects status, Energization meeting, getting approvals, and issues.

Review and submit the as built Drawings and Schemes for the above projects as per the site Modifications.

Preparation of BOQ tower line items.

Testing of insulator and Assembly of hardware part as per the approved drawing before string and submit RFI.

Follow up with the testing and commissioning activities to provide the front to the testing as per schedule and completed the testing activity before time.

Arranging the FAC testing and inspection schedule with MEW (CIVIL, CONST, FF AND PSMD) department timely & completing the testing within the same time duration

Lead the team to achieve contract completion within the time frame and customer satisfaction.

Plan and schedule the work and organize the manpower in order to meet an agreed program and deadlines.

Attending the meeting with the Client and Sub Contractors to discuss projects status, work progress, Energization meeting and resolve contractual and technical issues.

Represent the Company and enhance relationships in dealings with Client, Consultants and regulatory authorities to ensure all agreements are implemented.

Preparation of progress reports to internal management and client.

Final Reconciliation with client, subcontractors, vendors and supporting construction team/PM for final closure of project.

Ensure Company Health, Safety & Environment and quality policy and procedures are implemented while executing the project scope.

Cleared all Invoices / measurement certificates with MEW related to site electrical works and submitted to main office.

Experience in Contractor and Client Management at Site NOV‘12

FEB14

Name of the Organization- CROMPTON GREAVES LTD, GURGAON Designation - Sr. Executive. (Electrical)

Project –

Erection and commissioning of 400/220 kV AIS Substation, Power Grid Corporation of India ltd. (NEEMRANA AND BASSI).

Erection and commissioning of 220/132/33KV Substation AIS UPPCL, MEERUT.

Erection and commissioning 400 transmission line from Neemrana to Biwadi s/s under POWER GRID CORPORATION OF INDIA.

Erection and commissioning of 220/132Kv GIS Substation, RVPNL. (JAIPUR).

Erection and commissioning of 132/11KV GIS Substation, RVPNL. (JAIPUR).

Role & Responsibilities:

Responsible for site execution, supervision and co-ordination of the installation, testing and commissioning activities on the site as per the drawing.

Preparation of Equipment, Earthing and Builders work layout Drawings for Substations.

Responsible for the installation, Testing and commissioning of 400/220kV substation having 500 MVA 400/220KVA Transformers (AREAVA), REACTOR (50MVAR) HT, LT Switchgears, Firefighting panel, HVAC Panel and Metering panels.

Responsible for the installation, Testing and commissioning of DG Sets (250 KVA).

Installation of 220kV AND 132 KV GIS and LCC Panels – Make CG HUNGRY

Installation of 11kV Switchgear – Make CROMPTON GREAVES

Installation of 40MVA 220/132kV Power Transformer – Make CROMPTON GREAVES.BHOPAL.

11kV RMU Indoor and Outdoor – Make SIEMENS Germany

Installation of Outdoor Distribution Transformers of Various Ratings (Oil Filled) – Make VOLTAMP.

Installation of 11/0.433kV indoor Distribution Transformers of Various Ratings (Dry Type / CAST RESIN)

Installation 24V DC Indoor and Outdoor Battery Charger -

Installation Power Management System Panels – Make SIEMENS.

Testing Of Circuit Breakers, Current Transformers & Potential transformers

Testing Of RELAYS of Different Makes

Testing of Power Transformers (up to 500 MVA).

Cable Tray & Support Structures.

Indoor & Outdoor Earthing.

HV, MV, LV Power & Control Cable laying.

Preparation of LV Power and Control cable Termination Schedules.

Responsible for installation, Testing and commissioning of HVAC high side and low side systems.

Preparation of BOQ tower line for transmission line and for 400 KV switchyard

Material inspection, all material, tower part, conductor, earth wire OPGW, hardware fitting and etc.

Testing of insulator and Assembly of hardware part as per the approved drawing before string and submit RFI.

Erection of tower for 400/220kv switch yard and 220 kv transmission line.

Stringing of Power Conductor, Earth wire and OPGW under controlled tension with tensioner as per the approved drawing.

Design Calculation of extra works.

Quantity and quality check of works done by Contractors. Coordination with contractors as per specifications in the work order/BOQ.

Responsible for processing the bills of contractors.

Complete Site monitoring of internal and external electrification, HVAC and Firefighting, Plumbing activities on the site.

Coordination with Contractor, Vendors and Consultants for installation, Testing Commissioning activities.

Preparation of Handing Over Documents

DEC ‘11

NOV ‘12

Name of the Organization – BAJAJ ENERGY PVT LTD.UP Designation - Senior Engineer -Electrical

1. 2X45 MW, Thermal Power Plant (TG-Siemens, CFBC-ThyssenKrupp) 132/11Kv S/S (AREVA) S/S-(2x56.25MVA T/F)

Role & Responsibilities:

I was looking Erection, Testing& Commissioning of (2X45) MW Thermal Power Plant and 132 kV switch yard that includes the following electrical equipment’s.

(2 x 56.25) MVA Generator (Siemens-TDPS Make)

Power & Distribution Transformer of 56.25 MVA, 7.5 MVA and 3 MVA (Areva make).

132 KV Switch yard (Areva Make).

Automatic Voltage Regulator (ABB- Unitrol 6080)

H.T. Switchgear (11 KV) Areva Make

L. T. Switchgear (L&T Make).

220 Volt Battery chargers with Battery Bank (Servo link Make)

Also, other electrical auxiliary systems including DM Plant, Coal Handling Plant, ESP, Compressor, Boiler & Turbine auxiliaries, etc.

Working experience in MCC, PCC, HT panel (11KV) and related protection systems.

Preparing Indents, follow-up of Pre-Schedule and checklists.

Management of manpower for proper scheduled erection.

Follow-up or close monitoring of materials (Material Management) and their procurement on a priority basis.

Co-ordination and lesioning with various engineering teams and vendors as per their suitability and requirement.

APR’10

DEC ‘11

Name of the Organization: SHREE CEMENT LTD

Designation: ENGINEER (Shift – In charge)

Role & Responsibilities:

Involved in Commissioning of (2X50) MW Captive Power Plant and Green Power Project of 43 MW (1X18, 1X15, and 1 X 10 MW).

Electrical Operation and Maintenance of 72 MW Captive Power Plant (4X18 MW), Green Power Plant and 220/132 KV S/S.

Safe start –up, shut down & synchronization of unit.

Smooth & Efficient operation of Boiler & related auxiliaries.

Monitoring and handling of any kind of Emergency & abnormality.

Doing isolation and normalization of auxiliaries as per requirement & safety permit system.

Preparation of daily, monthly and yearly plant reports and Work notification requests through SAP.

Try to minimize auxiliary power, water & coal consumption.

Take care and make decisions during emergencies with consulting seniors if time permits.

Do Co-ordination with Mechanical, Electrical, Instrumentation Department.

My Key Responsibility during Commissioning Work included as: -

Active Participation in commissioning activities: Hydro Test, Chemical Cleaning, Steam Blowing.

Commissioning of Start Up Boiler (2X50MVA-China Make) of 50 TPH Oil Fired Boiler.

NOV’07

APR’10

Name Of the Organization: JK PAPER AND POWER LTD

Designation: - GET to AE (Shift – In charge)

Role & Responsibilities

Shift –In-Charge and looking after the commissioning and testing activity of 12 MW POWER PLAMT (CFBC boiler of 70TPH capacity and 88 bar pressure being imported from M/s Jinan Boiler Group, Jinan, China & 12MW TG set being imported from M/s Qingdao Turbine and Jinan Power, China.)

Commissioning & testing works of all Electrical equipment’s of 12 MW Captive Power Plant project with DCS Controlled.

Commissioning of H.T, L.T PCC, MCC & DBs of DM Plant, Turbine

Aux., Cooling Tower, ESP & PLC operated Coal Handling Plant

6.6 KV Switch gear panels (H.T) of Siemens Make.

12 MW Generator Relay & Metering Panel, Synchronizing Panel & AVR

Panel.

2 x 20 KVA HI REL UPS system.

L.T. Motors up to 200 KW & HT motors up to 560 K.W.

AC DRIVES: Variable Frequency Drive (VFD) –Siemens, Allen- Bradley, & ABB (ACS 800) make for 400HP to 5HP AC Motors. DC DERIVES 6RA70 OF Siemens.

Reduction in break down through condition monitoring system

Shut down job preparation and execution, Contractor’s job.

Participated in T.P.M. activities.

Software &Other

Skills

Microsoft Project, Excel, word, power point, EIP Software’s. MS Office (Excel, Word, PowerPoint).

SAP Modules, Enterprise Information Portal (EIP).

Place: Duabi

Engr. TAJINDER PAL SINGH