JACK WATERS
*** ******** **. **** *, Costa Mesa, CA 92627 M: 949-***-**** E: ******@*****.***
www.linkedin.com/in/jdwtrs
PROFESSIONAL PROFILE
Solutions-driven leader Facility Engineer and Manager specializing in electrical installation repair and testing. Dynamic leader promoting the safe operation of electrical and operational equipment through careful repairs and preventative maintenance that reduce costs, add value, and ensure reliability. Highly conceptual yet analytical thinker with an innate ability to connect the dots, identify interconnections, and see the big picture while breaking down problems into solvable parts. Trained and certified in electrical engineering. Meticulous recordkeeper with strong interpersonal skills.
AREAS OF EXPERTISE
Product Programming, Maintenance Management Software, Facilities Health & Safety, AutoCAD, Mechanical Systems Installation & Design, Reading & Drawing Equipment Schematics & Prints, Plant Floorplans Layout & Implementation, HVAC Systems, Electric Motors and Motor Drives (AC/DC), Automated Production Equipment, Product Launches, Robotics, Multi-Axis CNC Machinery, Programmable Logic Controls (PLC), Hydraulic & Pneumatic Systems, Electronic Components to Board Level, Supply Chain Management, Permitting Processes (AQMD City State & Fire), Cost Reduction & Lean Systems, Project Management, Technical Report Writing, Capital Projects & Budgets, Estimating
CAREER HISTORY
Facilities Manager 04/2024 - Present
Urban Workshop — Costa Mesa, CA
Direct a team of shop techs; maintain a space of 60K+ sq. ft. with equipment valued at $200K+
Supervise all tools and equipment for the maker space, including CNC, Laser Engraving, Auto lifts, Tire changing/Aligning, Electronics, Sewing, Molding, and Vacuum molding equipment
Implement a new air compressor and system within ninety days
Spearhead the establishment of a welding certification center
Facilities/Maintenance 12/2023 - 03/2024
GA Systems — Los Angeles, CA
Embarked on a short-term role to assemble parts and components for various industrial applications
Put together daily maintenance checklist for all of the major equipment. Laser cutting machines, CNC punch presses, CNC press brakes.
Installed compressed air lines to new equipment purchased during my time with GA Systems
Facilitated quality checks and inspections to ensure adherence to specifications and collaborated with engineering
Facilities / EHS Manager 03/2022 - 12/2023
SEMICOA Semiconductors — Costa Mesa, CA
Key asset during the company closure and move out
Maintained a 54K sq. ft. facility with assets valued at $1.5M
Directed building, grounds, equipment, and personnel safety, security, and functionality
Trained 60+ employees to elevate skillsets and promote efficient, effective, and safe practices
Revamped acid neutralization process and handled hazardous materials and waste with no incidents
Supervised clean room operations and provided continuous deionized process water supply
Calibrated precise production and fabrication equipment to required precise specifications, usually within 0.002"
Operated and maintained diffusion tube furnace; Handled electron beam metal deposition evaporators and cryogenic pumping systems for ultra-low vacuum chamber operation
Led project management and engineering for wastewater upgrades per county requirements
Maintenance / Facilities Manager 01/2020 - 03/2022
LeFiell Manufacturing Corp. — Santa Fe Springs, CA
Administered all building and equipment upgrades, modifications, and requirements
Ignited a culture of excellence, leading a team of six and retaining 80% year over year
Executed upgrades, doubling total output and improving contractor workmanship
Implemented safety upgrades, improving safety by 100% and productivity by 85%
Gained pit heat-treat/annealing furnace experience, operating/troubleshooting equipment at up to 2200 F
Implemented a computerized maintenance management program to monitor and raise equipment uptime percentage to >95% annually
Applied vendor management, vastly improving contractors' workmanship and accountability, saving $5.6K annually by renegotiating with a new HVAC company
Facilities Engineer 04/2017 - 01/2020
Triumph Aerostructures — Hawthorne, CA
Led maintenance planning and automation engineering, upgrading and customizing equipment for optimal performance
Monitored $100M in equipment assets with zero major losses
Innovated by reverse engineering obsolete equipment saving $6M through effective problem-solving
Developed a preventative maintenance program achieving a flawless safety record with no accidents or injuries
Utilized advanced automation engineering to upgrade and customize equipment to peak performance
Troubleshot and repaired obsolete equipment via reverse engineering and upgrading as necessary
Integrated technology into various facilities and production equipment and processes as needed
Facilities Engineer II 09/2015 - 07/2017
Gulfstream Aerospace Corp. — Long Beach, CA
Presided over end-to-end strategic facilities management and implementation of equipment upgrades
Led $1M wastewater treatment system installation, coming in on time and under budget by $200K
Replaced antiquated dust collection system, bringing the $80K project to completion
Oversaw contractor management and liaised between contractors or vendors and operations teams
Headed operational aspects of running aircraft painting completions and service production equipment
Commissioned and negotiated cost-effective facilities and equipment upgrades from start to finish
Stewarded a monthly line of credit of $50K and ensured accurate, timely report submission
Facilities Manager 05/2005 - 06/2015
Bryant Rubber Corp. — Harbor City, CA
Administered 24/7 facility management/maintenance operations, including equipment troubleshooting, training, scheduling preventative/predictive maintenance repairs, spare parts inventory, and upkeep
Directed end-to-end installation of a $500K clean room project, coordinating all aspects
Enabled safe, efficient operation of industrial equipment stamping dies, cutting tools, and injection molds
Performed reverse engineering on obsolete equipment to save dollars
Scheduled and directed facility/equipment upgrades, working with vendors and construction crews
Implemented computerized maintenance management program from the ground up, charting preventative and routine maintenance resulting in significant reductions in downtime
Steered performance management of eight direct reports, achieving an 88% retention rate
Conducted routine and unannounced safety drills, achieving 100% compliance on audits and safety reviews
Successfully moved Bryant Rubber’s production facility to Mexico on time and within budget.
MILITARY EXPERIENCE
UNITED STATES MARINE CORPS — Camp Pendleton, CA
Artillery Fire Direction and Survey 0844 – Desert Storm
EDUCATION
Mira Costa College — Oceanside, CA
Pursued Bachelor of Science: Electronics
Coursework in Industrial Drafting, Computer-Aided Drafting, Chemistry, and Science
Palomar College — San Marcos, CA
Certificate: Electrical Engineering
TECHNICAL SKILLS
CAD, PLC Programming, HMI Software, Microsoft Office Suite (MS Word, Excel, PowerPoint, Access, Outlook), Google Suite, Adobe Suite, Visio, Mac & PC Proficient