Gewargis Narso
**** ******** ****** *******, ** *5356
********@*****.***
OBJECTIVE
Field service & customer interaction
SKILLS
Created and Built Wiring Diagrams Knowledge of National Electrical Codes
Troubleshooting and Testing Instruments Reading Blueprints/Schematics Experience
Estimations and Operation Management Skills General Installation and Maintenance Skills
Familiar with Safety and Quality Control Procedures Generators and Transformers Installation Skills
Knowledge of Electronic and Electromechanical
Repairs
Building and Designing Electrical
systems/Controls Experience
EXPERIENCE
TESLA,
ELECTRICAL FOREMAN FREMONT CA 03/2021-4/14/2023
ELECTRICAL TAKEOFFS AS PER PLANS & SITE CONDITIONS, SITE LAYOUT, MATERIAL & EQUIPMENT ORDER, CONDUIT SIZING & FILL REQUIREMENT, SEISMIC SUPPORT DESIGN & INSTALLATION, CONSTRUCTION SAFETY, LABOR MANAGEMENT, APPRENTICE TRAINING IN COMPLEX ELECTRICAL CONSTRUCTION & TRADE PRACTICE, RFI WRITING, DESIGN IMPROVEMENT, COMMUNICATION WITH ENGINEERING & DOCUMENTATION, INSPECTION, SHUT DOWNS & POWER UPS, TEST & DINOGISTIC & CUSTOMER RELATIONS. SETUP SWITCH GEARS, TRANSFORMERS, CONDUIT CONSTRUCTION, PULLED FEEDER CABLES 350KCMIL- 750KCMIL, UPGRADED BUSSING, MAIN BREAKER UPGRADES & TERMINATION. GEHVAC Company Modesto, CA 07/2006 to 02/2021
Journeyman Electrician.
Conduct site evaluations, and plan review, material take-off and pricing, and labor cost estimations
Assemble and compile labor and material cost, finalize estimation, and offer bidding for job performance
Receive final notice to proceed, generate and submit catalog information based on plan and specifications
Conduct mobilization assignment, purchase materials, have site meeting, and coordinate labor. Setup switch gears, load panels, Transformers, Load panels, lighting & controls, HVAC controls, fire Alarm wiring, conduit construction. Commissioning & system test
IBEW 332 San Jose, CA 4/1999 to 7/2006
Journeyman Electrician
Conduit bending and wiring systems, and installed Solar Panels and Net Metering
Roughed and finished power and lighting outlets
Installed transformers and generators related to main electrical
Lighting fixtures installation and parking lot lighting and poles
Used variable frequency controllers installation and instrumentations
Laid out underground conduit construction, cable pulling and terminations
Set switch gears, motor control centers, load panels and lighting control panels Lam Research Corporation Fremont, CA 5/1995 to 8/1998 Final Test Technician III
Vacuum Pump set-up and testing, software installation and diagnostics, and calibration and mechanical adjustments
Production environmental system testing, and electronic testing and repairs to component levels
Radio frequency generators installation and repairs
Log testing, result, failure reports and parts replacement documentations
Set up equipment and connected electrical, cooling lines and gas lines
Shut down and prepared for shipping final products after testing procedures EDUCATION
STATE OF CA DEPARTMENT OF INDUSTRIAL RELATIONS JOURNEYMAN ELECTRICIAN CERTIFICATION, NUMBER: 100904 (RENEWED TILL 2026). OSHA 10 & OSHA 30 CERTIFICATION
ARC FLASH CERTIFIED AND CARRY MY OWN 42 CAL SUIT.
Electronic Tech Certificate IBEW 332 San Jose, CA 8/1999 Certificate Denver Institute of Technology Denver, Colorado 03/1983 Diploma Mechanical
Engineering Technician
Darlington College of
Technology
Darlington, England 09/1977
PROFESSIONAL AFFILIATIONS
IEEE, Solar Power, California Green Energy, Association of Electrical Engineering.