***********@*****.*** 701*******
EDUCATION
BE in Electronics and Communication Engineering The Kavery Engineering College, Salem (Dt ), Anna University. GPA - 69.0%
Year of Passing - May 2010
•Diploma in Electronics and Communication Engineering IRT Polytechnic College, Bargur. GPA - 81.83%
Year of Passing - April 2003
SKILLS
Failure Analysis.
Problem Diagnostics.
Troubleshooting & Debugging.
Hardware Analysis.
Root Cause Analysis.
Electronics Units Assembly.
Testing.
Supervison & Leadership.
Team Management.
RF Board Analysis.
R. VISWANATHAN
Sr. Engineer - Failure Analysing & Testing
PROFESSIONAL SUMMARY
To utilize my computing and creative skills my maximum potential towards a challenging career in a growth oriented and leading edge organization that recognizes & values individual's contribution. Hardworking and passionate job seeker with strong organizational skills eager to secure entry-level Engineer position. Ready to help team achieve company goals.
WORK HISTORY
Pegatron Technology India Pvt Ltd
Mahindracity -Chengalpattu 06/2023 – Till Date
Senior Engineer – Failure Analysis
FATP all key parts of the Apple I - Phone are assembled after undergoing testing for application program and radio frequency checking, along with other necessary failure checks.
FATP to address the recurring failures, it is essential to analyze the root causes and implement appropriate corrective actions.
This comprehensive report will be presented and deliberated upon in both internal and external meetings, involving relevant teams.
The objective is to prompt the concerned team to take necessary actions in order to mitigate the occurrence of repeated failures.
Executing immediate and long time remedial measures.
To enhance the company's profitability through the reduction of rework scrap, it is essential to implement effective yield monitoring and documentation practices.
Foxconn Hon Hoi Technolog India Pvt. Ltd.
Kanchipuram. 02/2021 – 07/2022
Failure Analysing & Testing Engineer
I-Phone MLB PCB RF & AP merge failure board analysing, troubleshooting and debugging.
Major failure boards validation process and documentation.
Faulty BGA component removing and mounting using Semi- automation machine.
Implementation of short term and long term corrective action.
New process and quality alert implementation (VI station).
Research, troubleshoot and resolve complex problems independently.
Yield monitoring and documentation.
To improve the company profits by reducing rework scrap.
Flextronics Technologies (I) Pvt. Ltd. 09/2018 – 10/2020
Sricity, A.P
Junior Engineer/Team Leader/Shift In charge
Failure units analyzing after faulting compounds rework, repair within time.
Plan schedule of work in accordance with established priorities.
Testing individual modules and verify its working with Electronics test equipments.
Support to Product Quality improvement through proper analysis of failure root cause.
Implementation of short term and long term corrective action.
Understanding of circuits schematics of products.
Sharing the products knowledge to colleagues for improves team repair capabilities.
Reduce the WIP Inventory in analyzing repair the area by debugging ageing PCBA.
Quess Corp Pvt. Ltd, Chennai 11/2016 – 08/2018 I & C – Engineer (JIO 4G Project)
As per installation and configuration for this type of Series routers 920 - ‘O’, 920- ‘I’ & 901 at inbluding solution (IBS-Sites, E-Node sites, ISC Sites.
L2 RAD switch 6,10 port configuration after checking for switch reachable and routerpinking for checking commands.
Configuration of RAD switch at Outdoor Small Cell (ODSE) and checking nearby sitefunctioning.
OLT Patching (Optical Lint Terminal) for Ag2 site-router to AG3-site router
Connectivity fiber through also.
Tech router L2 switch, Wi-Fi college Tech router & Voltech Wi-Fi L2 Switch everythingConfiguration and checking for commands.
Reliance Jio infocomm–4G VoLTE. 11/2015 – 05/2016
(Kutumbh Care (P) Ltd.), Coimbatore
RF DTS Lead [Digital Testing Specialist]
Work order assigning to sub-ordinates.
Monitoring & reporting of field Drive test.
Data collection using X-CAL with 1 short call, 1 long call and frequency scanning forDrive Test in 4G Network.
Analyze drive test problems and determined the reasons for poor RF coverage andhandover for network improvements.
Examine physical connectivity between sites via Routers & Switches.
Many types of Drive test are done in LTE (4G) & Golden Route also.
Cluster Drive test (LTE – 2300, 1800&850) are done on regular basis and coordinating the cluster coverage testing using NET VELOCITY application.
Johnson Controls India Limited, Chennai 01/2012 – 10/2015 BMS Control Engineer
Control & Monitoring and maintenance of Building Management System.
System &Security System Equipment's like CCTV, Attendance & Access Control system.
Systems and [160*4, 30*1KV] UPS System's Maintained, Precession AC -[PAC].
Every Employee details backup Storage in hard Disk at 3 months.
Safety System every month checking for week end days.
Indian Telephone Industry (ITI), Chennai 09/2004 – 09/2005 Technical Engineering Trainee
Servicing of Center Development Telemetric Exchange cards (C-Dots Cards).
Servicing of Power supply cards, Control Cards & Dead cards.
Semiconductor Device (ICs, Diodes, Resister, Relay, etc) assessment.
Component inspection by Multi Meter and Cathode Ray Oscilloscope (CRO).
Soldering & De-soldering using soldering iron & hot machine of fault component.
Checking of cards in mini exchange for performance and noise.
Handling of latest electronic test & measuring equipments like Analog & Digital multimeter Handling equipments like Signal Analyzer.
PERSONAL DETAILS
Father's Name : A Rathinam
DOB : 09/04/1984
Marital Status : Married
Passport No. : G0653600
Permanent Address : No.50C, Nethaji Street,
Ponnagar, Mettur Dam – 636401.
Place : Chennai
Date : (R.VISWANATHAN)