Name; Rao K Alam
Location; Richmond, TX
E-mail; ***********@*****.***
Phone; +1-832-***-****
Status in USA; Permanent Resident
Education; Bachelor of Science in Civil Engineering
UET - Lahore, Pakistan December 1982 to 1986
PWD ( Pakistan) ; Consultant 1987-2000
Doha, Qatar ; COO/Project Manager 2001-2006
PWD (Pakistan)Consultant 2007-2014
Alsal Construction Inc. Dallas, TX Project Manager
2015-2020
Royal Oak Enterprises Construction. Houston, TX Senior Project Manager 2020 to Aug 2022
Potent USA Inc. Houston Texas Senior Project Manager
Sep 2022 to date
Experience
33 years of ambidextrous professional work experience of direct Supervision, Construction Management and Project Management with the latest Management Software tools.
Flexible and Rigid Pavement Roads along-with allied structures like culverts, inlets, manholes, storm sewers, sidewalks.
AirPort, Runways, Taxiways, Hangers for parking of Jet planes
Flyovers, Underpasses, River Bridges with RCC bored Friction Piles, Piers, Transom, Prestressed Beam and Deck Slabs, guide banks, spurs, etc.
Multi-Story Framed Structure RCC Buildings.
Wood Framed Buildings ( Single Family, Multi Family, Residential Complex along with Pools, Gyms),
Truck Stops with all Associated Paraphernalia like Driver’s Lounge, Laundry, Gas Station, Convenient Store, Restaurant, Showers, ATMs, Stay Rooms, Parking Area, Electric Charging Points, Truck Wash, Small Mechanical Shop, etc.
Industrial and Commercial Steel Structures Buildings, Trusses and Purlins, Steel Structure Pedestrian Bridges.
Financial Management
Hardworking with a strong background in the construction field observing all OSHA safety protocols
Strong communication skills
Strongly assist in the Business Development efforts of the organization
Highly proficient in Human Resource Management
30 years of Estimation Experience of all the Projects executed so far.
Skills
Primavera P6 Professional (10+ years)
Microsoft Project (10+ years)
ProCore (3 years)
BuilderTrend (3 years)
Bluebeam Revu (3 years)
PlanSwift (3 years)
RSMeans (3 years)
Microsoft Office (10+ years)
Microsoft SharePoint (5 years)
Autodesk BIM
Adobe Suite
Certifications and Licenses
OSHA 30
PMP in Process
Project Execution
Led teams in developing a project execution plan which identifies the project objectives, success criteria, contracting strategy, and Hazard Risk Assessment (HRA)
Led teams to create and maintain Project Controls such as project coordination plans, stakeholder management plans, financial plans, communication plans, reporting plans, and change orders.
Lead teams in guiding design meetings with the Consultants, Project Architects, Engineers, and sub-contractors.
Manage projects independently and successfully by maintaining cost, schedule, and other deliverables
Coordinate the planning, design, and construction of all community infrastructures (roads, utilities, water and sanitary sewer facilities, electric power, gas, telecommunication utilities, recreation centers, swimming pools, monuments, landscaping, parks, playgrounds, greenbelt walking trails, etc.)
Determine needed resources (manpower, equipment, materials, and subcontractors) from start to finish with attention to budgetary limitations• Coordinate with the Field Supervisor to assign appropriate resources per project schedule. Once they are assigned to the project, monitor and manage their progress vs. budget.
Financial Performance/Resource Management
Coordinate with the Project Coordinator to ensure all material is ordered and received, and all subcontracts are in place per schedule.
Responsible for total financial/audit performance of projects.
Scope Management
Ensure projects are delivered according to the scope of the contract.
Inspect work in progress to ensure that workmanship adheres to quality standards and project specifications.
Team Communication
Properly communicate with the entire project team and provide all necessary information to ensure efficient execution of the project (turnover to Superintendent, proper information shared with Subcontractors, ensuring that schedules are distributed to the project team, ensuring timely communication of issues, etc.)
Negotiate contracts with external vendors to reach profitable agreements
Experience In America. (2015-2024)
●Project Manager Petland Commercial Centre Dallas ($6.00 M)
●Bombay Sizzler Restaurant at Irving Tx ($1.7 M)
●Restaurant at Plano Tx ($1.3 M)
●Restaurant at Frisco Tx ($1.1 M)
●Coffee House at Southlake Tx ($1.00)
●Bombay Chowpatty Hall Irving Tx ($1.5 M)
●Hickory North Texas Multi-Family Apartment ($35.00 M)
●Pilot Travel Center 4440 N McCarthy St. Houston Tx. 77013
●Project Manager Elementary School in Rosenberg Texas 10,000 SF Total Cost =$1.00 M
●Project Manager at Burghli Homes (Single Family and Multi-Family) at Sunnyhill St. Houston TX
($20.00 M).
●Project Manager, Permeable Parking with True Grid and stabilizing soil with True Blend at East Aldine Mail Road Houston including Landscaping ($3.00 M)
●Project Manager, Commercial Building on Old Spanish Trail 16000 SF including Detention Vault ( $2.40 M)
●Project Manager, Commercial Building with Gas Station Tomball 2 Acres ($3.30 M)
●Project Manager, Land Development in Paloma Trails Texas, 77 Acers including Road Pavements, Sidewalks, Curbs with ADA ramps, Storm Sewers, inlets, Main Water Supply Lines, Sprinkler System, SWAPPP ($10.00 M)
●Project Manager Bridge at Sims Bayou 92 Ft along with Flood Protection ($10 M)
●Project Manager Bridge at Cypress Creek with Flood Protection arrangement 110 Ft ($13 M)
●Project Manager Commercial Building at Reading Rd 12,000 SF ($1.50 M)
●Widening Existing 2 Lane Arterial to 4 Lane Divided, Resurface Existing 2 Lane; 5’ Paved Shoulders Inside and Out, of Brian Road Rosenberg TX 1.00 Mile ($8.60 M)
●The Verge at Summer Park Residential Apartment
● Owner :( Park Place Finance)
●Area of the Lot= 4,50,000
●Built Area = 2,91,000 SF
●No of Units = 291 Units
●Construction and Expansion of an Industrial Factory at Wharton Tx ($30.0 Million)
●Construction of 5,50,000 SF Structural Steel Fabrication Factory at Pearland spawned over 40 Acres ($ 60.0 M).
Project Executed in Pakistan & Qatar (1987 TO 2014)
●Dual Carriageway Roads 24’ each (Sohawa-Chakwal 40 Km $15 M),
●Vented Causeways, Bridges on Nallas and River Sohan 1550 Ft ($20 M
●Rigid and Flexible Pavement Roads in Lahore
●Bridge on River Ravi near Saggian Lahore Pakistan (2160 Ft $12M)
●A huge Steel Structures Industrial Complex, constructed over 2,500 RCC piles of 2Ft dia
with 60 Ft depth in a semi-hilly area of 15,50,000 SQ FT. water supply and sewage system for the colony ultimately with a slow sand filtration plant to make dirty water useable. ($ 60 M)
●Five bridges on West Bay Lagoon Doha Qatar (65 Ft) each ($4.0 M)
●Commercial Buildings 8 stories and 500,000 SQ FT. RCC Framed Structure ($20 M)
●Palace for Prince Muhammad Bin Hammad Al-Thani ($30 M)
●New 4-Story RCC Framed Structure Building for Chief Minister Punjab with Raw Silk and Black Galaxy Granite Floors. Doors, Windows, Floors, Wall Paneling and False Ceiling of Burma Teak. 3x500 Trane Chillers HVAC, Air Handling Units, Elevator of 1600 KG capacity Schindler Germany. Smoke Detectors, Fire Alarm System ($ 20 M)
●Children's Hospital (500+500) Ton Trane HVAC Units($ 20 M)
●Five-story Burn Center at Jinnah Hospital, 500 Ton HVAC Carrier ($12 M)
●Services Institute of Medical Sciences Medical College. ($ 50 M)
●Flyover at Thokar Niaz Baig Lahore, underpass at Liberty Lahore, and Flyover at Muslim Town Lahore Canal. ($ 30 M)
●Construction of Steel Structure Workshop 5,00,000 SF with Truss Roofing 20 F high, Fabrication of Steel with Overhead mobile Crane. Lahore Pakistan
●Boat Bridges, Steel Pedestrian Bridges, Gantries and International Traffic Sign Boards, and Steel Emergency Stairs for multistory buildings as per Code. ($35 M)
●Defense Raya Country and Golf Club DHA Phase-6 Lahore including Community Center and
International Swimming Pool. ($ 30 M)
●Penta Square Shopping Center DHA Phase-5 Lahore. 8,50,000 Sft Grey RCC Structure only ($12 M)
●9 No. Community Development Schemes including Roads, Street Lights, Water Supply Schemes with 2,00,000-gallon Overhead Reservoirs, Sewage Schemes, Parks, Shopping Centers, and Community Centers. ($30 M)