Myreon (Cliff) Kahn
Attleboro, MA 02703
E-mail: **********@***.***
WORK EXPERIENCE
Railcar Test Technician/ Repairmen
*/**** – 1/2024
System One / CAF USA
Testing and troubleshooting prototype electric powered passenger railcars for the Massachusetts Bay Transportation Authority. This involves hydraulic, pneumatic, hvac, and electrical systems. A variety of advanced and complex level tasks involving the use of mechanical and electronic test equipment. Ability to work at complex level tasks involving troubleshooting, testing, quality control, tuning, complicated repairs, interacting with production supervisor to discuss and/or resolve problems. Ensures that assignments are completed in the established time standards. All purpose technician capable of adjusting mechanical parts to include doors, trapdoors, folding racks and beds Testing and repairing pipes and leaks in water, air, and oil systems Fills test reports, internal adjustments, and pending job information accurately.
Installer
3/2017-9/2017
Allcom Inc. Coventry, RI
Installing and testing equipment inside Verizon Cell sites. Everything from DC power (run, sew, terminate, label), Battery replacement and new builds, Install Remote Radio Heads, RayCaps, and Power plants. PIM and Sweep testing as well as Fiber testing. Basic hand tools and power tools used.
Installer
4/2009 – 2/2016
EFI Telecom Lynn, MA
Job consists of all aspects of telecommunication equipment installation. All work being performed for Verizon Labs, or Verizon Offices on the East Coast. Examples; Install ladder rack and bays, Cat5 \ Cat6\ RF\ Fiber Optic cabling as well as major DC power work. Complete Cell Site builds and maintenance work for batteries.
Customer Service Engineer
5/2008 – 2/2009
Cambridge Viscosity 02155
As a Customer Service Engineer I was responsible for -
Direct customer technical support for all of Cambridge Viscosity products
Service and/or repair equipment sent in by Customers. This would include precise and accurate calibrations using Standards to meet ASTM, DIN, JIS and ISO standards
Perform Sample Testing of products and produce complete details and solutions for customers needs. This could include designing and building custom testing fixtures
Perform in-field service at customer’s locations.
Assist customer onsite to maintain an accurate running system and offer advice and solutions to accomplish such tasks.
Arrange all travel plans and coordinate with Customer
Customers include leading organizations in oil and gas exploration, refining, automotive, research, industrial materials, and other high-stakes fields.
Field Deployment Lead/ FDL
6/2004 – 7/2007
Tellabs State: IL
Work in field on Tellabs 7100, 5500, 5500 NGX, 7120, 3100, 3600, Cablespan, and 5320L. Some of my duties include turning new systems up, performing preventive maintenance, software/hardware upgrades, and audit installations for quality and accuracy. This will include all testing and verifying equipment and cables/fibers etc. I am responsible for covering an area from Maryland to Canada.
Install Supervisor/Microwave Technician/RF
12/2003 – 3/2004
Airwave Network Systems Providence, RI
Over see the installation of Microwave equipment located at Verizon Wireless Cell sites.
Install Harris & NEC Microwave Radio Equipment
Harris FarScan
CAT-5e, T1, DS3 and RF Cabling
Install Eltek /Lucas Benning Power Plants & Batteries
Install Adtran equipment, Tellabs 5500, and Tellabs 3600 equipment
Installation/ Installer - Level 4
1/2003 – 12/2003
Butler International MA
Install Tellabs 6500, 6400, 5500, 532L equipment on Customers locations as requested. These are complete install jobs that consist of mounting bays and rack as well as hooking up power cables, fibers, coax, lan’s, etc. Testing is also required for all cabling. Follow strict guidelines and standards as well as meeting deadlines.
Most of my work is in the Wireless Field currently. I have been doing installs for companies such as Nextel, Verizon Wireless, and Cellular One.
I also worked in a Lab environment installing many different vendors equipment for presentation purposes.
Installer
10/2002 – 12/2002
TekSystems /AT&T Broadband Framingham, MA
I worked with AT&T Power crew installing/upgrading existing Head End equipment. Consists of major power work (change from one BDFB to Two) and installing new equipment bays, rack, stitching cables, etc.
Job is a short contract position.
Installer
7/2002 – 8/2002
Butler International Louis, MO
Install Tellabs Titan 5500/1024 system and a Tellabs 532L system. This was a complete start to finish job.
Field Service Engineer
8/2000 – 11/2001
Butler Telecom / Tellabs Schaumburg, IL
Working with Tellabs products such as the Titan 5300 system, Titan 5500, Cablespan 2300, Verity 3300, & 3100 systems.
As a Field Service Engineer I am responsible for the testing and turning up of new systems. Repair problems with existing systems, and expanding existing systems. I also upgrade all Tellabs products to maintain current feature package levels.
ACST Tech
8/1998 – 8/2000
Lucent Technologies Baltimore, MD - Framingham, MA
Installation of Central Office equipment. From super structure to bays/ equipment. Run cables and fiber optic cables as needed. Most of my last year and a half with the company has been major power work (750kmil cables), Galaxy plants, Lineage plants, battery stands, main buss bars, and Transition cables.
Worked with Bell Atlantic engineers doing field surveys for Collocation sites. Started working in this position in April 2000. Returned back to Installation June 2000
Mechanical Assembler
10/1997 – 4/1998
Ambec Owings Mills, MD
Assemble conveyor belt systems which are all made in house using raw materials Operate basic shop equipment, and hand tools
Fabricate parts from prints in a machine shop and sheet metal shop
Electro / Mechanical Assembler
4/1993 – 8/1997
Industrial Dynamics Cockeysville, MD
Design and Layout electrical control panels and cabinets.
Complete wiring of panels and cabinets. This would include full inspection and final ring out to be sure 100% completion.
Soldering parts, boards, and cables
CNC Setup & Operator using a Leblond 106 mill, and Slant 3 lathe. This includes manual mills and lathes to prepare raw material for the CNC machines.
Forklift Operator
Build and assemble transformers, electrical motors, and control cables.
Read blueprints and schematics
Note: I continued to work for this company after I was laid off. I was given a part time position while working for Ambec (next job)
Machinist
1 /1992 – 4/ 1993
Rayloid Glyndon, MD
Operate and maintain machine shop equipment including mills, lathes, saws, sandblaster, vapor degreaser, etc.
Use precision measuring equipment on finished parts to verify tolerance.
Lead Motorcycle Mechanic
1/1991 – 1/1992
Side Street Cycles Westminster, MD
Motorcycle maintenance from minor repairs to complete rebuilds.
I was responsible for all Inventory control and Customer service and sales.
Education/ Training Certification
Certification
10/2004
Tellabs 7100 Installation Guidelines and Acceptance Testing FP2.1 Lisle, IL
Certification
6/2004
Tellabs 5500 NGX Provisioning and Maintenance FP3.0 Lisle, IL
Certification
12/2003
Maintenance and Operation of MegaStar Microwave Digital Radio Westborough, MA
This class was held at Verizon Wireless for their employees. I was invited to attend due to work I was performing on Harris Microwaves at Verizon Cell Sites.
Certification
9/2003
Tellabs Installation Standards Assessment Lisle, IL
Tested on Telcordia GR-1275 Issue 4, and Tellabs 03.0317 Rev G.
This is required to be a level 4 Installer for Tellabs Equipment.
Certification
5/2001
Tellabs 5500 System Lisle, IL
Complete training by Tellabs to work infield on their Titan 5500 systems. Training consisted of trouble shoot existing problems with systems, upgrades, general repairs, and maintenance.
Certification
9/2000
Tellabs 5300 System Lisle, IL
Complete training by Tellabs to work infield on their Titan 5300 systems. Training consisted of trouble shoot existing problems with systems, upgrades, general repairs, and maintenance.
Certification
8/2000
Cablespan 2300 Fundamentals Lisle, IL
Trained by Tellabs for work with the Tellabs Cablespan 2300 system used by AT&T as well as RCN for their Broadband Services.
Certification
4/2000
Transmissions Framingham, MA
This was a self-paced class explaining the basics about Transmissions and how it works in the telecommunication field.
Certification
12/1999
Windows 95 and Internet Training Framingham, MA
Complete training in Windows 95 and using the Internet
Certification
1/1999
Specs and Drawings Framingham, MA
Training for Specs and Drawings for Lucent Technologies.
Certification
11/1998
DMACS Class Framingham, MA
Complete training for the DMACS Alarm and Monitoring System, and how it works in a Central Office system.
Certification
12/89- 1/1991
Motorcycle Mechanic Institute Phoenix, AZ
Obtained Motorcycle Career and Advance certification
Obtained Factory Harley Davidson certification
Obtained Factory Yamaha certification
Obtained Factory Suzuki certification
Certification
6/1989
High School Westminster, MD
References Available upon request