RAMESH BABU MALLAMPATI

Phone: +971-**-*******, +919********* +91-939*******; (home)

Email: **************@*****.***

Seeking senior-level assignments in Mechanical Piping Installation & Commissioning, Project Management, Preservation, in a reputed organization.

(Project Execution, Project Deliverables, Procurement Support & Site Support)

PERIOD

COUNTRY

COMPANY

DESIGNATION

From Nov 2022 to till

UAE ABU DHABI

Alnasr contracting company, Mirfa2, IWP 120 MIGD

Sr.Lead Mechanical Engineer

From Dec 2020 to Aug 2022

UAE ABU DHABI

ABENGOA, TWRO IWP Project IWP 200 MIGD

Sr. Mech. Piping Superintendent

From May 2019 to Oct 2020

UAE, Sharjah

Tecnicas Reunidas Hamriyah IWPP Project, 1800MW (3 GT+3 ST) RO 20 MIGD

Sr. Mech. Piping Engineer

From June 2016 to Dec 2017

Saudi Arabia

Kentz Al Hawiyah Project, pipeline project, 3 million BPD SAUDI ARAMCO

Sr. Mechanical Piping Superintendent

From Aug 2014 to Dec 2015

India, West Bengal

Haldia Petrochemical Limited, West Bengal, India

Mechanical Lead

From Dec2013 to July 2014

Basrah, Iraq

Weatherford, Zubair Oil Field Project, (1.2 million BPD), Basra, Iraq

Senior Mech. Piping Superintendent

From July 2013 to Sept 2013

Quraya, Saudi Arabia

Siemens, Quraya Independent Power Plant (Samsung C&T), QIPP 6X750 MW Saudi Arabia

Senior Mechanical Engineer

From July 2012 to May 2013

Kyauk Phyu, Myanmar

Daewoo E&P (Client) SHWE Field Development Project, Mya Gas, Myanmar (640 MMSCFD Million standard Cubic feet per day) Project Management Team

Sr. Mech Piping Superintendent.

From Dec 2006 to Aug 2012

Basrah, Iraq

Shell Majnoon Project (2 x 50KBPD) (Petrofac), Project Management Team (2.35 million BPD)

Senior Mechanical Piping Engineer

Atyrau,

Kazakhstan

Kashagan Field Development Project OGS (3.7million BPD), AGIP KCO(Petrofac) Project Management Team

Sr. Mechanical Piping Supervisor

From Dec 2002 to Nov 2006

Sohar,

Oman

Doosan Heavy Industries & Construction Co Ltd (EPC), Sohar, Oman IWPP Project 585MW & 60MIGD

Mechanical Piping Engineer

Fujairah,

UAE

Doosan Heavy Industries & Construction Co Ltd (EPC), Fujairah, UAE IWPP Project 650MW &100MIGD

Mech. Piping Supervisor

From Sept 1995 to Nov 2002

India

Mitsubishi (EPC) 180 MW IPP (Gas Power Station)

Mechanical Supervisor

From July 1992 to Aug 1995

India

VTPS (O & M) 600MW Thermal Power Station

Operator

PROFESSIONAL PROFILE & RESPONSIBILITIES

CONVERSANT THE FOLLOWING CODES AND STANDARDS SUCH AS:

ASME / ANSI Code:

ASME B31.1 : Power Piping

ASME B31.3 : Process piping

ASME Sec. VIII (1,2 &3) : Boiler & Pressure vessel Code

ASME Sec. IX : Welding & Brazing Procedure

ASME Sec V : NDE

ASME B31.4 : Pipeline Transportation

ASME B16.34 : Valves, Flanged Threaded & Welding

ASMEB31.8 : Gas Transmission & Distribution Piping

ASME B16.5 : Pipe Flanges and Flanged fittings

API Code:

API 610 : Centrifugal Pumps.

Api 672 : Air Compressors,

API 674 : Reciprocating pumps

API 676 : Rotary Pumps

API 680 : Reciprocating air compressors

API 682 : Pump Shaft sealing

API 617 : Centrifugal Compressors-axial Compressors.

API 618 : Reciprocating Compressors.

API 619 : Rotary Compressors

API 673 : Centrifugal Fans

API 614 : Lubrication & Control oil system.

API RP 686 : Machinery Installation.

API 620 : Large welded Low Pressure storage tanks

API 650 : Welded tanks for oil storage

API 651 : Cathodic protection

API 653 : Tank inspection & repair.

API 1104 : Field erected Pipeline

API 5L : Seamless Line Pipe

API 6D : Spc. Pipeline valves

API 618 : Reciprocating Compressors

API 605 : Large Diameter Carbon steel flanges

API 573 : Inspection of Fired Boilers & Heaters.

ASME Boiler and Pressure vessel Code:

Section 1 : Power Boiler

Section II, Part A.B, C : Material

Section V : Non-Destructive Testing

Section VIII, Div 1&2 : Pressure Vessel

Section IX : Welding Procedures and performance

AWWA American Water Works Association

M11 : Steel pipe Installation

M61 : Desalination Seawater

M68 : Water Quality

M42 : Steel Water Storage Tanks

M45 : Fiberglass Pipe

M55 : Polyethylene (PE) Pipe Installation

M46 : RO & Nano Filtration

M53 : PVC Pipe Design

C207 : Steel Pipe Flanges for Water Works

C651 : Disinfecting water Mains

EDUCATIONAL CREDENTIALS

Master of Technology in Mechanical Engineering (M TECH)

Master of Business Administration Operation Management (MBA)

AMIE Mechanical (ASSIOCIAT MEMBER)

Bachelor of Mechanical Engineering (B TECH)

Process Piping Engineering, (PGDPPE)

PDMS

Vibration Analysis Level-I

ASNT Level _ II

Primavera

MS Office,

Auto Cad

28 years of experience in construction & inspection, installation, pre-commissioning and commissioning Greenfield, Brownfield, shut down & revamping jobs in SWRO, POWER PLANTS & OIL and GAS field.

Project Management and Supervision: Leading and overseeing all aspects of project execution on-site, including planning, scheduling, and resource allocation. Providing guidance and direction to project teams to ensure adherence to project timelines and quality standards.

Teamwork and Planning: Fostering a collaborative working environment and promoting effective teamwork among project teams. Developing comprehensive project plans and schedules, identifying critical milestones and deliverables. Coordinating with internal and external stakeholders to align project objectives and priorities.

Analysis and Implementation: Proposing innovative solutions and strategies to optimize project performance and mitigate risks. Implementing best practices and industry standards to ensure quality and safety in project execution.

Planning and Effective Utilization of Resources: Strategically planning and allocate resources, including manpower, machinery, methods, and materials, to optimize project efficiency and cost-effectiveness. Monitor resource utilization and productivity levels, identifying areas for improvement and implementing corrective actions as necessary.

Project Execution: Engaged in the formulation and implementation of project execution strategy and planning, wherein delineating the project and discipline parameters encompassing scope, cost, and time imperatives. Facilitate the alignment of team efforts to surpass expectations, while concurrently orchestrating seamless coordination with diverse disciplines to fortify the foundations of project triumph.

Project Deliverables: Aggregating data from diverse sources, I orchestrate the compilation of intricate engineering studies, analyses, and calculations. Crafting discerning recommendations, I meticulously create conclusive documentation. In the process, I delineate technical issues, delineate alternative solutions, delineate the pros and cons of multiple alternatives, and present informed recommendations through official project documents, including technical queries and deviations. My responsibility extends to the meticulous creation of final documentation, meticulously incorporating all pertinent information, and navigating the path toward securing customer approval. Furthermore, I am actively engaged in reviewing analogous documentation to provide assistance to peers and meticulously scrutinizing and authorizing the work conducted by direct reports.

Procurement Support: Synthesizing data from diverse sources, amalgamating intricate details into equipment/material specifications, data sheets, testing prerequisites, and material requisitions represents a distinctive forte. Simultaneously, scrutinizing analogous documentation not only aids in supporting colleagues but also entails the critical evaluation and authorization of tasks accomplished by direct subordinates.

Site Support: Soliciting insights from cognizant authorities, actively engaging in discerning constructability, operability, and maintainability reviews, and meticulously integrating requisites into the engineering and design framework exemplify integral facets of my role. Collaborating seamlessly with on-site personnel, I adeptly address and resolve emerging challenges. My responsibilities extend to formulating comprehensive plans and documents that underpin construction, testing, commissioning, operations, maintenance, or decommissioning activities. Furthermore, I assume a pivotal role by delivering hands-on support during on-site endeavors, particularly focusing on construction, commissioning, or turnover phases.

Responsible for the management of Mechanical (Static & Rotating) piping construction activities on site. Plans and supervises the major functions of the construction which include the responsibility for the planning and coordination of all manpower and equipment, materials supplies, and subcontracted services, towards the proper completion of the work on schedule with approved drawings, specifications, cost, and quality limitations.

Reviews all engineering design drawings of his section of the project before passing them for use to his group. Directs and supervises project engineers in the performance of all aspects of their work. Exercises strict control over costs of construction particularly the use of labor, materials, and equipment. This includes reviewing variances from budgeted expenditure and recommends/initiates action to bring them under control. Discusses and resolves daily site problems with site supervisors. In Addition, all Method Statements dealing with his area of responsibility prior to issue to the Client. Participates in or (subject to the Project Manager delegation) leads in the discussion of all contractual matters related to Subcontractors employed on his section of the project.

Monitors Sub-contractors at each stage of the work to ensure proper compliance with all technical aspects of the contract through both individual contacts and coordination meetings.

Checks and authorizes all claims for payment from all Subcontractors involved in a section of the project to assure accuracy and that proper contractual obligations are met. Pass them to the Commercial Manager/Control Manager for payment. Directs the procurement of permanent and non-permanent materials required for the proper completion of the work on schedule

SKILLS & RESPONSIBLES:

MECHANICA:

Responsible for the MECHANICAL Equipment’s (Static & Rotating), Piping, HVAC and Fire & safety systems installation and commissioning.

Leadership qualities

Time management skills

Ability to problem-solve and use initiative.

Excellent verbal communication skills

Delegating work to colleagues within team.

Coordinate and direct construction workers and subcontractors.

Select tools, materials and equipment and track inventory.

Meet contractual conditions of performance.

Review the work progress on daily basis.

Prepare internal and external reports pertaining to job status.

Planning to prevent problems and resolve any emerging ones.

Ensuring quality construction standards and the use of proper construction techniques.

Meeting regularly with clients, third parties and other managers to report on progress.

Setting targets, objectives, and responsibilities for all supervised staff.

Regularly reviewing timings, budget, labor, risk, and project plans to ensure work stays on track.

Conducting site visits to inspect work, check materials and ensure staff are following health and safety guidelines.

Dealing with contracts and mitigating the impact of any issues.

Ensuring the delivery of high-quality work within contract timescales.

Working in an office and on a construction site.

Reviewing the project in-depth to schedule deliverables.

Collaborating closely with various stakeholders to ensure smooth project execution.

Capabilities to drive people management, talent development and performance management processes.

Keen attention to detail and strong organizational skills,

Understanding of all facets of the construction process.

Competent in conflict and crisis management.

Leadership and human resources management skills.

Controlling allocated engineering time to meet project deadlines.

Excellent time and project management skills.

Ensuring that all construction activities align with the established timeline.

Reviews and approvals of Project specification, Drawings, monitoring of progress and approval of invoices.

Leadership and project management skills

SAP system implementation,

Good knowledge of Rotating machinery & Equipment.

Good knowledge of online & offline condition monitoring equipment.

Good knowledge of Compressors & ancillary systems.

Good knowledge of Mechanical seal systems.

Good knowledge of bolt tightening & torquing techniques. And Bolt management system (tagging)

Depth knowledge of hydrotesting and experience of pigging.

Depth knowledge of flushing and retro jetting.

Depth knowledge of Nitrogen Helium Leak Testing.

Good knowledge of Oil & Gas Upstream Utility Packages.

Good knowledge of Pickling and Passivation for SDSS Material

Review and contribute to Construction work packs and planning with a view to achieving early and efficient client handover.

Have sound knowledge in Vendor Package Management and the ability to liaise with the Client, vendors, and other disciplines to close out clarifications and expedite documentation and see them through to Approval.

Able to provide comprehensive reports that provide good clear and concise information to the project manager.

Monitors all contractor work to ensure that it is performed efficiently, safely, and according to company quality standards. Identifies areas of concern and recommends corrective action.

Planning preparation corrective action for Rotating equipment (Reciprocating Compressors, Centrifugal pumps, Rotary Compressors, Fans & Blowers, gas turbine generators and auxiliaries such as Diesel engine, Generators & auxiliaries and chemical dosing pumps and other rotating equipment’s in Oil & Gas Petrochemical industry.

Supervising Major overhauls, time based – inspections, breakdowns maintenance & carryout modification.

API 510 (Pressure Vessel Inspection), API 570 (Piping Inspection), and API 653 (Above Ground Storage Tank Inspection)

Installation and commissioning of Heat Exchangers, Oil Heaters, Packaged equipment, Vessels (Horizontal and Vertical), Tanks, Filtering skids, Emergency Diesel Generators, Fuel systems, Gas systems, Metering skids, Hydraulic systems, HVAC, Firefighting (water and CO2), as well as columns, heaters, filters, boilers, Surge drums, Production separator, test separator, Gas Compressors, Gas coolers, Gas Filters, Gas scrubbers, Stabilizers, chillers, Cold separators, Process amine injection to amine contactor, Coolers, Glycol injection skids, Reflex condenser, Stripping Column, Cartridge filters, Carbon Filters, Heat Exchangers and Reboilers, and more.

Scrubbers, Accumulators, Flash tanks, Knock out drums (KO drums), Vertical Separators, Horizontal Separators.

Approves incoming materials by confirming specifications; conducting visual and measurement tests; rejecting and returning unacceptable materials.

Inspects rotating equipment, static equipment, structural steel, and piping systems for correct materials, sizing, alignment, tests and specialty items.

Inspects underground installations of gravity flow and pressurized piping systems.

Recommends corrective actions regarding code violations. Code compliance complaints and resolve, NCR’s Rising

Functional checks and mechanical completion check for equipment.

Levelness, position, orientation, anchor bolts, conduits, etc. of tanks foundation

Witness the tests, controls and inspections, guarantee inspection status control for parts of the plant.

Examine valves, and fittings for defects, such as cracks, corrosion, and leaks, Drill test holes,

Implementation of the approved Inspection Test Plan according to Client’s requirements.

Inspection of plant and equipment, maintain/update equipment inspection records and issue reports as required.

Erection and commissioning of Gas Turbines, steam turbines, HRSGs, BOPs, Water treatment etc.

Excellent interpersonal and communication skills; with the ability to lead teams in a multicultural environment.

Inspects new and existing mechanical installations such as: air conditioning, heating, ventilation systems, high and low pressure fired and un-fired vessels, and other mechanical.

Export pumps & Fire water pumps (Electrical & Mechanical) installation and commissioning

Take on the responsibility of Packaging Engineer which requires coordination of all discipline technical matters.

Have sound knowledge in Vendor Package Management and the ability to liaise with the Client, vendors and other disciplines to close out clarifications and expediting documentation and seeing them through to Approval.

Review results of verifications and advise on required mitigations to overcome foreseen risks to project start-up.

Special attention to Grouting, Final alignment, Leveling, Piping hook-up, and Instrument hook-up.

Advises Operations Managers of equipment requiring excessive repairs and recommends replacement where necessary.

RO Pressure vessels assembly and installation, and inspection of alignment and coupling gap inspection.

RO ERD alignment and installation and coupling inspection.

RO HP Pumps installation and alignment (shaft alignment), pre commissioning & commissioning

RO Booster pumps installation alignment (shaft alignment), pre commissioning & commissioning

RO Sweet water pumps installation alignment (shaft alignment), pre commissioning & commissioning

RO Sea water intake pumps installation alignment and commissioning, Bar screen assembling and installation, Band screen installation.

RO back wash system installation and commissioning (citric acide and neutralization tank and system)

DMPF installation and commissioning, (filling pumice, sand and gravel)

DAF system installation and commissioning (Mixers, Flocculation, flotation, coagulation)

Post Treatment (chemical skids installation and commissioning)

Limestone system (Saturator, Lime, Lime slurry) installation and commissioning (lime storage, mixers, injection system)

Potable water pumps installation and commissioning. (chemical injection)

Wastewater system installation and commissioning.

COMMISSIONING

The commissioning team sets priorities for system turnover that allows for productive simultaneous operations (SIMOPs) that allow for safe commissioning of systems while the construction contractor completes and turns over the remaining systems.

An effective communicator with excellent relationship management skills and strong analytical, problem-solving & organizational abilities.

Adept at installation and commissioning operations with demonstrated abilities in working on initiatives.

Represent the Commissioning team in key meetings with interfacing departments (Operations, Engineering Team, etc.).

Working with the engineering and operations department to promptly find the preferred alternative for alleviating issues discovered during commissioning.

Ensure all activities are implemented in a safe manner using the PTW system.

The Commissioning execution plan includes the materials, special tools, and vendor support for a safe and productive pace.

Planning and Schedule for vendor requirements at site for final approval and acceptance.

Support safe execution of the Mechanical and Piping pre-commissioning and commissioning work scope according to contract requirements, specifications, procedures, and schedule.

Plan and prepare for the execution of future work fronts.

Supervision in the commissioning/function testing of Mechanical and Piping plant, equipment, and systems

Maintain and making Complete weekly/ daily reports, for office/ site distribution

Develop discipline Commissioning Work Orders, Plans, documentation, Input into multi-discipline.

Commissioning Procedures and Handover documentation for early and efficient client acceptance Witness factory acceptance tests where required.

Witnessing installation of Mechanical equipment. And Packaged Equipment

Witnessing installation of HVAC system.

Inspecting & testing of tanks and internals, as required.

Shell and tube exchangers – perform field inspection.

Witnessing chemical cleaning or flushing operations and pickling and passivation, preservation

Accepting Mechanically Complete sub-systems from the Contractor including punch out, clearance and handover.

Interface with Engineering support personnel on technical matters.

Responding to site queries raised by Construction Contractor regarding Mechanical and piping issues

Providing technical support to the installation construction supervisors.

Witnessing & validating cold alignment & hot alignment.

Checking rotating equipment for correct direction of rotation and for freedom of moving parts before connection to driver.

Witnessing vessel internals installation, including trays, weirs & packing.

Air cooled exchangers – inspecting to ensure temporary shipping supports and erection materials have been removed. Adjust fan assemblies. Checking operation of louvers.

Carrying out vibration monitoring checks and making baseline surveys of rotating equipment.

Identifying / arranging & supervise supplier representatives to assist commissioning.

Co-ordinating and directing technicians and operations technicians to progress Commissioning activities in line with Project Planning Priorities and Commissioning Procedures.

Supervise the works of vendors and ensure efficient utilization of vendor manpower,

Suggest commissioning manager the need for mobilization of Vendors specialists.

Monitor and ensure the activities are carried out as per the schedule and by the procedures and requirements.

Inspection formats for the pre-commissioning and commissioning activities about mechanical activities.

Monitor Commissioning work-in-progress, and report against the plan.

Assisting in the development of commissioning spare parts listing and quantities.

Supervise the testing of Mechanical and Piping systems by applicable pre-commissioning, commissioning, and relevant vendor test procedures.

Supervise Mechanical and Piping commissioning team and interface with other disciplines.

"Redline" Mark-up drawings and procedures when changes have been completed during the commissioning phase.

Complete the project Completion System by handover documentation.

PIPING

A Responsible person with proven success in Project Management and EPC

My duties are, supervising craft personnel; scheduling and directing work crews, preparing work plans, assuring quality control, managing, and tracking costs, and materials, scheduling equipment, administering safety programs, and maintaining exceptional owner relations.

Participate in HSE improvement activities, promoting HSE elements throughout Work as being progressed, installed, and strictly implementing the project safety and HSE.

Responsible for the management of piping construction activities on site. Plans and supervises the major functions of the construction which include the responsibility for the planning and coordination of all manpower and equipment, materials supplies, and sub-contracted services, towards the proper completion of the work on schedule with approved drawings, specifications, cost, and quality limitations.

Ensure that contractors working within his discipline adhere strictly to the latest Approved for Construction project drawings, Specifications, ITP's, Procedures and Site Instructions

Performance against measurable construction targets as part of the overall project schedule performance against measurable construction targets as part of the overall project schedule

Ensuring that all work designed or supplied by the mechanical and piping engineering disciplines complies with the relevant standards, health and safety requirements, including any regulations or codes referred to within the required jurisdiction for the Project with due consideration of relevant client engineering standards.

Having good experience and Knowledge in the SDSS (Super Duplex Stainless Steel), DSS (Duplex Stainless Steel) SS Piping (Stainless Steel), CS Carbon Steel. GRP, GRE, PVC, & HDPE.

Check the ferrite content randomly, Microstructure test to be done, if ferrite content of the SDSS piping more than the limit, SDSS & DSS piping to be replace.

While welding SDSS & DSS piping check the oxygen level.

While Hydrotest for SDSS & DSS Check internal cleanliness,

After Hydrotest for SDSS & DSS pipe carried chemical cleaning, PICKLING AND PASSIVATION

Supports to be checked as per drawings.

Reviews all Method Statements dealing with his area of responsibility before issuing them to the Client.

Participates in or (subject to the Project Manager delegation) leads in the discussion of all contractual matters related to Subcontractors employed in his section of the project.

Supervision of construction activities including cross-country construction and construction of pipeline attributes at facilities

Monitor the discipline and timekeeping of contractors' staff and labor in a defined work area, identifying any disciplinary action required, and informing the relevant Discipline Superintendent

Prioritize field execution sequence and resources when conflict arises.

Assist in organizing safety awareness activities such as toolbox meetings, all safety promotional activities, safety audits, and safety meetings.

Assist in risk assessment job safety analysis, safety procedures/ checklists, safety records, and documentation.

Liaise with site operations staff and Construction Manager on all safety and health issues.

Overall, In-charge for Construction Activities on-site on, day-to-day basis and responsible for the construction activity as per plan and schedule to meet to the client requirements and ensure all scaffolding methods comply with Local and EHS policies.

Managing Contractor work on behalf of Owner to ensure safety, quality, and technical correctness in line with drawings, specifications, and technical standards.

Monitoring the subcontractor’s daily erection, dismantling Modification of scaffolding.

Coordinating with Project Engineers materials and design delivery to support construction activities.

Represent the Mechanical/Piping practice in project engineering coordination meetings.

Managing Contractor work on behalf of Owner to ensure safety, quality, and technical correctness in line with drawings, specifications, and technical standards.

Developing the work plan for insertion into the Project-specific execution plan and developing and maintaining the Project’s scope of work documentation and revising as required during the design evolution.

Managing and reviewing the engineering work packages associated with all deliverables and time-based functions to ensure that budgets and schedules are being met and take corrective action if necessary.

Check flow direction arrows on valves; verify that they are properly identified, and valves are installed in accordance with flow direction.

Line check to verify the use of correct material fittings, valves, and supports, prior to the hydro test and prepare punch list for incomplete works, check and closing after the work is done.

Participates in and oversees the installation and repair of piping systems. This requires a full understanding of the project plans and specifications.

Fabrication and erection of heavy steel structure, piping (pipeline), studying drawings, plans and parameters.

Follow planned progress schedule without compromising quality and safety.

Responsible for Material Take Off (MTO) and follow up.

Follow-up in surface preparation of sandblasting & painting

Ensure the work is carried out in time and by the scope of work, specification, and quality requirement.

Ensuring that construction hazards and risks are fully considered by designers and contractors and that appropriate mitigation actions are implemented, and appropriate action taken.

Maintains functional links with other unit heads in the project, particularly with the Accounts and Administration units. Makes forward plans in the section of the project for the release of equipment and personnel employed.

Responsible for installation of GRP piping and Installation of HDPE pipe, sample coupon marking, and inspection.

Responsible for overall Piping/Mechanical Fabrication, Installation, and testing (Hydro testing & Pneumatic testing), N2 leak testing, and Flange management system.

Participate in the inspection of the piping materials and facilities’ quality to ensure that they meet the project specifications and standards and issue non-conformance reports as necessary.

Initiate Field Change Requests (FCRs) and Field Change Notices (FCNs) as required.

Review Work Packages and system/area turnovers including review of applicable turnover and as-built documents and inspection records required by the contract.

Study the Isometric drawing received from the clients and identify the pipelines and carry out the inspection work.

Ensure that pipe supports, hangers, and guides have been installed by the piping drawings and the pipe support details.

Monitoring the QA/QC Documentation of the subcontractors and ensuring that all the activities are incorporated into their system on a daily basis and can be traced according to our requirements.

Supervise and Inspection of cold and hot insulation, cladding on piping, and equipment.

Line check to verify the use of correct material fittings, Valves, and supports, before the hydro test and prepare punch list for incomplete works, check and closing after the work is done.

Conduct site testing, pre-commissioning, and commissioning of installation with regards to all piping systems and facilities.

After installation walk-down and making punch listing, Hydro testing of Piping, and Reinstatement.

QC responsibilities:

Check the joint preparation and fit-up of piping & equipment of different



Contact this candidate