Post Job Free
Sign in

Commercial Construction Broken Arrow

Location:
Broken Arrow, OK
Salary:
15+
Posted:
July 18, 2024

Contact this candidate

Resume:

Resume

Darren L. Harrington

**** * ******** **

Broken Arrow, OK 74011

Summary

Dedicated to providing every customer with a positive and memorable experience. Skilled in working under pressure, adapting to new situations and challenges to best enhance the organizational brand. I will be an asset in one way or another to anyone I team up with. Let's team up together !

Skills

●Business ownership

●Construction

●Concrete work

●Maintenance

●Wastewater treatment

Experience

Business Owner

Kaychris Construction LLC

Broken Arrow, OK

2018 - Present

●Managed all aspects of a residential and commercial construction business.

●Estimated bids and executed all jobs, including framing, sheetrock, flooring, and bathroom/kitchen remodels.

●Handled financial obligations with customers.

●To all remodeling contractors viewing this. My business is and was strictly a residential and commercial construction business in Tulsa and surrounding areas. I received jobs under contractors and advertised for my own jobs. I estimated my bids and executed all jobs which were, but not limited to, frame work, sheetrock, flooring(laminate time, wood plank) full bathroom/ kitchen remodels from start to finish. I took care of the financial obligations with the customer too. I feel I am a well seasoned individual for this field and would be glad to stay employed in it. Due to some family emergencies and loss of vehicles in the recent past I have had to step down temporarily until back on my feet.

Concrete Construction Laborer

Start: January 2013

End. : January 2018

●Loaded and unloaded tools, materials, and machines.

●Set up and reinforced forms for accurate concrete pouring.

●Poured and leveled concrete.

●Finished surfaces by troweling, floating, and brushing.

●Placed steel pins using a sledgehammer.

●Operated excavators and loaders to prepare the site.

●Reviewed blueprints and drawings to identify correct grades.

●Calculated concrete quantities needed for jobs.

●Removed debris and waste after completing work.

Maintenance Crew Leader

City of Tulsa

Start: 2007

End: 2013

●Supervised preventive maintenance projects, employee tasks, and performance.

●Delegated daily tasks to employees.

●Planned and laid out repair work.

●Set up and operated machine tools.

●Operated various types of trucks and excavators to maintain sanitary and storm sewer systems.

Water/Wastewater Treatment Plant Operator

Travis County WCID

Start: 2003

End: 2007

●Sampled and tested wastewater.

●Applied chemical dosing.

●Received chemical shipments.

●Performed preventive and minor corrective maintenance.

●In charge of maintaining the Reclaimed Wastewater System

Maintenance Crew Leader

City of Tulsa

Start: 2007

End: 2013

●Supervised preventive maintenance projects, employee tasks and performance and adherence to safety standards.

● Delegated daily tasks to employees to manage

●Planned and laid out repair work using diagrams, drawings, or schematic diagrams.

●Set up and operate machine tools to repair or fabricate jigs, fixtures, or tools.

● Operated Vactor trucks, Cues cameras, dump trucks and various types of excavators to maintain sanitary sewer, and storm sewer systems for the City of Tulsa

● Sampled and tested wastewater, applied chemical dosing, received chemical shipments, and performed wastewater plant preventive maintenance and minor corrective maintenance.

Thank you for your time and consideration. I appreciate the opportunity to share my skills and experience with you. I look forward to hearing from you soon.

Best regards,

-Darren L. Harrington



Contact this candidate