M: +91-891*******, E-mail: *********@*****.***, Location: Kolkata 700052, WB, India SUMMARY: B.E (M), MBA (Operations), BOE certified, 40 years’ experience in power plant:
35 years in coal fired power plant (Steam Turbine, Boiler and BOP – CHP, AHP, Water Systems) - unit capacity: 87.5 to 800MW
2 years in HRSG - unit capacity: 30 to 250MW
3 years in Hydel power plant: capacity 35 MW
TARGET ROLE: Looking for a suitable assignment in IPP/ CPP SKILLS:
Power Plant O&M, Erection & Commissioning, Budget Formulation & Control, Resource Optimization, Performance Management, Project Management, Sourcing & Procurement, EPC Package Development, Negotiations & Agreements with vendors,, Contracts Management, Plant & Corporate Level Safety, Strategy Management, Team Building & Leadership WORK EXPERIENCE:
Since Nov 2020: Advisory services on power plant technical audit and plant betterment July 2008 to Oct 2020: Tata Consulting Engineers Ltd Maximum team size handled: 50 employees
Last Designation: General Manager (M), Power Business Unit Job Description:
Supervised commissioning of HRSG & steam turbine 6x225MW at Qurayyah IPP, KSA
Conducted commissioning & fuel optimization of 2x600MW IPP at DB Power, Chhattisgarh
Executed pre-commissioning, commissioning, PG test witness for 2x525MW Maithon TPP
Assisted internally the commissioning of 5x800MW power plant at Mundra, India
Managed O&M audit 350 MW Captive Power Plant HMEL refinery, Bhatinda, Punjab, India
Succeeded project management & engineering support to CESC Budge Budge 250MW TPP
Performed contract & commercial management and claim management for Punj Lloyd – EPC vendor for 2X300MW Thermal Power Plant of Haldia Energy Limited.
Achieved plant betterment & PG test witness of HM-Coke TPP (2X45MW + 1X30MW)
Composed DPR for 2X68 MW combined cycle power plant, Agartala, Tripura, India
Directed commissioning of Co-gen power plant (4MW) of Cabot India, Thane, Mumbai 2
Prepared commissioning checklist for BTG & BOP
Imparted training on BTG & BOP
Organized and implemented ISO 9001:2008 audit
Produced project & process audit check list
Reviewed technical documents and developed standard operating procedures (SOP)
Participated walk down, consolidated punch list items and resolved the issues
Administered the function of Quality Management System Coordinator
Initiated Balanced Score Card (BSC) implementation for functional heads in TCE Kolkata Office
Implemented Tata Business Excellence Model (TBEM) in TCE Kolkata Office
Interviewed engineering candidates for recruitment through on & off campus Achievements
Honoured for PG test inspection & witness of 2x525 MW Maithon thermal power plant
Awarded for betterment of 120MW Hooghly Met-Coke power plant
Appreciated for exceptional contribution as QMSC
Accelerated innovation contest participation
On-time completion of 2x300 MW coal fired power project of Haldia Energy Limited July 1983 to June 2008: WBPDCL & WBSEB
Maximum Team Size Handled: 500 employees
Last designation: Sr. Manager (M)
Job Description:
Expedited commissioning of BTG and BOP (Water Systems, CHP & AHP)
Spearheaded power plant O&M
Mastered the assignment of Control Engr., Shift Charge Engineer, Manager & Sr. Manager
Pioneered in trouble shooting of BTG & BOP (water system, CHP & AHP)
Streamlined inspection, pre-commissioning & commissioning
Managed Power Plants:
Santaldihi Thermal Power Station: 4X120 + 2X250 MW
Bandel Thermal Power Station: 4 X 87.5 MW + 210 MW
Kolaghat Thermal Power Station: 6x210 MW
Jaldhaka Hydel Power Station: 3X9 + 2X4 MW
Involved in O&M of DG set
Introduced condition monitoring of rotary equipment
Established import substitution & vendor development
Developed spare parts management
3
Implemented lubrication schedule
Prepared coal mill (pulveriser) maintenance schedule
Trained up, motivated, guided, led and controlled young engineers
Upheld O&M of Coal Handling & Ash Handling Systems
Modified & updated O&M Manual
Improved departmental administration
Administered Store & Purchase functions
Established standard time for each operational & maintenance activity
Successfully analyzed project/ activity delay
Achievements
Reduced O&M budget by 20%
Eliminated excess manpower (20% approximately)
Optimized specific fuel oil consumption (25% approx./) & earned award
Enhanced PLF
Jul ‘82 to Jun ’83: Bridge & Roof, India
Graduate Engineer Trainee: Executed fabrication, erection & testing of large diameter underground urea piping at RCFC project
EDUCATION
1982: BE (M), IIEST (previous BESU or B E College),Shibpur, Howrah, India 2013: MBA (Operations) –NIBM, India
CERTIFICATION
1997: BOE- Directorate of Boiler, Kolkata, West Bengal, India 2009: ISO 9001:2008 Internal Auditor – NABET, India 2010: TBEM –TQMS, India
PERSONAL INFORMATION
Postal Address: 2B Parijat Apartment Phase 1, Kaikhali Daspara, Kolkata: 700052, WB, India Passport: W6317640 (Expiry: 19/10/2032)
Languages Known: English, Hindi & Bengali
Computer Skills: MS Office, Power Point, Excel & Internet Attitude: Team-Oriented, Flexible, Creative & Cooperative LinkedIn Profile: linkedin.com/in/dipak-das-19013932 Skype ID: dipak_das4
Date of Birth: 1st Nov 1960