RESUME
** ***** ** ******* ********** in Combined Gas & Thermal Power Plant, Coal Based Thermal Power Plant, Metro project, Production & Planning department, Oil & Gas Energy.
Electrical Engineer Approved by Petroleum Development Oman (PDO).
Electrical Engineer “C” license No: C46003 issued by Government of Tamil Nadu.
Competent Electrical License Approved by Petroleum Development Oman (PDO).
Construction, Commissioning and Maintenance Electrical Engineer Experience in 1X2400MW, 1X2520MW, 1X180MW, 2X80MW and 1X77MW Combined gas and thermal power plant, Coal Based thermal power plant.
Government Board of Apprenticeship training completed in HCL INFO SYSTEMS.
Good Understanding of Electrical drawing, Planning of Project, Manpower Management,
Both Practical as well as theoretical knowledge of different electrical equipment.
Professional Experience:
1)SAMSUNG C&T Corporation–UAE & Qatar.
Project-1: F3 IPP PROJECT (1X2400MW Combined gas and thermal power Plant-April 2022 to till date).
Project-2: UMM AL HOUL POWER PLANT IWPP PROJECT (1X2520MW Combined gas and thermal power Plant-March 2016 to Jan 2016).
Construction, Commissioning & Maintenances Electrical Engineer Experience in 1X2400MW 1X2520MW Combined gas & thermal Power Plant.
Erection and Commissioning of Power & Auxiliary transformer (Main tank erection, radiator assembly, control panel erection, oil, Break Down Voltage checking for transformer oil, cable laying & termination of transformer, protection stimulation for transformer & charging of transformer. Rating: 595MVA, 355MVA, 345MVA, 100MVA, 31.5MVA & 2.5MVA).
Erection & Commissioning of 11kV and 415V panels (panel alignment, panel bus bar alignment checking, and bus bar tightness checking as per torque setting, CT ratio, Burden test, contact resistance test, Breaker timing test cable laying & termination, charging of panels).
Erection of Insulated Phase Bus duct for generator and NSPBD erection for 415V transformers.
Erection of excitation panel and commissioning of excitation panel (Energization of control and auxiliary power, interface loop check, light load test).
Erection and commissioning of generator control and protection panel GCRP (energization of control and auxiliary power, interface loop check protection simulation).
Erection of battery charger & UPS system (battery erection, connection of individual cells, load test conducted for battery cell).
Earthing work done BOP area.
Erection of cable tray for Main Electrical Building, Local Electrical Building, HRSG & Steam turbine area.
Pre Commissioning of LT & HT motors (Insulation Resistance, winding resistance measured for motor, control circuit checking, decouple & Couple trial run taken, Current & Voltage measured for motors).
Pre commissioning of MOV’s and Lighting distribution board, Heaters.
2)RAY INTERNATIONAL LLC – Electrical Construction Engineer, Oman (Sep 2019 to Jan 2021).
CLIENT NAME: PETROLEUM DEVELOPMENT OMAN (PDO)
Erection of Concrete pole, 33Kvoverhead line conductor stringing, Cable termination and testing of transformer &cables.
Supervise discipline construction activities in the area to ensure that all work are completed according to design on schedule and to appropriate level of HSE & Quality.
Supervising the discipline construction and commissioning activities in a safe manner within budget on the time in accordance with applicable company procedure and technical specification.
To review scope of construction work and identify for any anomalies prior and during construction.
To monitor the HSE performance of all construction contractors in the area and to ensure that all work site under his control are operating in a safe manner.
To sign the test pack after completion of individual jobs making sure that the job has been done according to company standard and regulation and site is clean of any scrap.
To plan of station or part of station shut down with operations.
To review marked up as built drawing of the completed job before handover to operations & project engineer.
Ensure that schedule required is always met and ensure quality deliverable.
3) ALYSJ -Commissioning Electrical Engineer (April 2018 to Jul 2018).
Project: Gold line underground Metro project.
Designation:
Location &Station Name: Qatar &AL Sudan Station.
Commissioning of MCC & Lighting distribution board (meggering done for bus bar, tightness checking for bolt & charging of HV & LV panels).
Commissioning of HV & LV motors (winding resistance, insulation resistance value measured for motor, couple train run taken for motors).
Commissioning of earth pit. (Measuring resistance value for each individual pit, measuring the earth grid resistance value).
Commissioning offresh air handling unit & Air handling unit system.
4)OPG POWER GENERATION PRIVATE LIMITED, Chennai (June 2011 – Feb 2016).
A)Maintenance Electrical Engineer Experience in 1X180MW, 2X80MW& 1X77MW Coal based Thermal Power Plant.
B)Project Electrical &Commissioning Engineer in1X180MW, 2X80MW coal based thermal Power Plant.
A.Maintenance Electrical Engineer
Maintenance Electrical Engineer for Power House, Boiler, Electro static precipitator, Air cooled condenser (ACC), Generator, Bottom Ash Handling System, Coal Handling System, and Effluent Treatment Plant.
Synchronization of 1X180MW, 2X80MW and 1X77MW coal based Thermal Power Plant.
Maintenance for 11Kv, 6.6Kv and 415Vpanels (Tightness checked for Bus bar as per torque setting, meggering of Bus bar with respect to Phase and ground, & Internal loop wiring checking, main & auxiliary contactor function checking, Charging of HT & LT Panels).
Maintenance for HT and LT Motors (Winding resistance and Insulation Resistance values measured for motor, motor terminal tightness checking &Decouple and couple trial taken).
Maintenance for 100MVA generator step up transformer & 31.5MVA station incomer transformer&2.5MVA auxiliary transformer (all protection simulation, oil filtration and BDV Checking, all air vent release, terminal tightness checking for transformers).
Maintenance of 230Kv& 110Kv switch yard.
Maintenance done for motorized operating valve & dampers (calibration done for limit switch & torque limit switch).
Maintenance &Commissioning and Testing of Generator Make: Siemens rated voltage: 15750V current=7753A.
Maintenance for battery charger and UPS system h units).
Maintenance for collecting & emitting rapping system in Electro static precipitator.
Maintenance done for Support & Shaft insulator heater.
Maintenance for Transformer Rectifier panel in Electro static precipitator
Maintenance for Wall blower, long retractable soot blower and half retractable soot blower and heaters.
Maintenance done for bottom ash & coal handling system.
Maintenance done for level indicator controller in electro static precipitator
Condition and monitoring of Motor, HV & LV Panels, Power & Auxiliary transformers & Switchyard.
Condition & Monitoring of MOV& MOD, Wall blower & Heaters.
Condition & Monitoring for control relays, HV & LV Panel, HV & LV Motors.
B.Project Electrical & Commissioning Engineer:
Erection & Commissioning Electrical Engineer for 1X180MW, 2X80MW Coal based thermal power plant.
Erection of 11KV, 6.6KV & 415V panels (Alignment of panels, bus bar connection, internal panel wiring, and bus bar tightness checking, cable laying & termination for outgoing feeders).
Erection of power transformer 220MVA, 100MVA Generator step up transformer & 2.5MVA Auxiliary transformer (transformer rail fixing, main tank erection and radiator assembly erection, control panel erection, oil filtration & BDV checking for transformer oil).
Erection of 230Kv switch yard (Foundation bolt fixing, Structure erection, equipment erection like Current transformer, voltage transformer, circult breaker SF6, Isolator & earthing).
Erection of IPBD for generator & NSPBD for auxiliary transformer.
Erection of cable tray and cable laying (Power house, Coal mill, Boiler, Electrostatic Precipitator, RO Plant & Dust Extraction system, Air cooled condenser)..
Earthing grid formation for Power House, Boiler, Electro static precipitator, Air cooled condenser (ACC), Generator, Bottom Ash Handling System, Coal Handling System, and Effluent Treatment Plant.
Erection and design of Lighting fitting for Power House, Boiler, Electro static precipitator, Air cooled condenser (ACC), Generator, Bottom Ash Handling System, Coal Handling System, and Effluent Treatment Plant.
Erection & Commissioning of bottom ash, Fly ash & Coal handling system.
Commissioning of 6.6KV & 415V panels (Bus bar tightness checking as per torque setting, meggering of bus bar, charging of panels, phase sequence & Voltage checking).
Commissioning of 6.6KV & 415V motors (meggering of motor, control circult checking, decouple & couple trial run taken, Direction of rotation and current, voltage checking).
Commissioning of Generator Heater.
Commissioning and charging of 220MVA & 100MVA Generator step up transformer, 31.5MVA Station incomer transformer and 2.5MVA Auxiliary transformer (All protection and simulation checking).
Commissioning of wall blowers, heater and rapping system for ESP.
Commissioning of motorized operating value & damper (open, close checking and all feedback checking, limit switch setting checking).
Commissioning of Electro static precipitators (lamp load test conducted for TR panel, open and short circult checking for rectifier transformers, load test conducted, all rapping system operating time sequence checking).
Maintain daily progress report.
Defects, Preventive Maintenance notification checking, permit closing and service Entry, material PR raised in System Application Product (SAP).
Providing technical support to commissioning team as well as vendors.
5)GT Electronics India Private limited Pondicherry (JAN 2011 – MAY 2011)
Assistant Engineer (Planning Dept.).
I have supporting to planning and production department.
Preparing Production schedule and maintain the production schedule progress.
Preparing packing schedule and maintain the packing schedule progress
Shipment status follows up for production department and quality control department, packing department.
Material stock maintained for production department.
6)HCL Info System Private limited Pondicherry (NOV 2006 – MAY 2007) Coordinator Trainer.
Production schedule prepared with production supervisors.
Maintain the Production Daily progress.
HCL Info System Private Limited Apprentice training completed certificate issued by Board of Apprenticeship training (southern region) Chennai (NOV 2005 – NOV 2006) Trainee.
Education Details.
1. Bachelor of Engineering in Electrical & Electronics
Arasu Engineering College, Kumbakonam.
University Name: Anna University
Duration: 2007 – 2010
Percentage: 74% First Class.
2. Diploma in Electrical and Electronics Engineering.
A.V.C Polytechnic College, Mayiladuthurai.
Department of Technical Education
Duration: 2003 – 2005
Percentage: 83.12%, First class with Honors.
Technical Skills
Basic operation System Application Products Modules.
Well versed in Window 98, Window XP and Windows7.
Proficiency in entire MS office.
Good understanding of internet tools.
Excellent communication listening and motivating skills.
Awards and Achievements
Got 2nd price in cricket tournament at college level.
Got Award in essay competition about plant safety.
Certificate issued by St John Ambulance for First Aid Class.
Passport Details
Passport Number: Y1417602.
Date of Issue: 29/04/2024.
Date of Expiry: 28/04/2034.
Place of Issue: Dubai.
Passport Address:
No 44/19Kasthuri Bai Street,
Koranadu,
Mayiladuthurai-609001.
DECALARATION
I hereby declare that the information furnished by me in the above document is correct and accurate to the best of my knowledge.
Place: Mayiladuthurai. Signature
S.Prakash
S. PRAKASH
44/19 kasthuri Bai Street
Koranadu
Mayiladuthurai
Tamilnadu-609001
India
Mobile: India +91-959*******
: UAE+971-*********
Email: ************@*****.***.
Skype ID: sriprakash1986