Post Job Free
Sign in

Quality Assurance Level 1

Location:
Bruner, TX, 77630
Posted:
June 22, 2024

Contact this candidate

Resume:

DWAYNE TILLEY

Gladewater, TX ***** · 318-***-****

*************@*****.***

LICENSES

NOVEMBER 2013

NACE CIP LEVEL 1

Level 1 Coating Inspector – NACE # 643719/ CERT #48751 - Expires November 2025

DECEMBER 2021

CLASS A COMMERCIAL DRIVER’S LICENSE

EXPERIENCE

JUNE 2022

UTILITY INSPECTOR, T/J Inspection, Inc. – Henderson, TX/Palestine, TX

Inspect all clearing of row, ditching, lowering-in, stringing, padding and backfill. Inspected the application of RD6 tape on main line and tie-in sections. Inspect installation of cp test leads. Efficiently worked with survey and welding crews to lay FBE and ARO pipe. Documented, filed and maintained proper inspection records and quality assurance documents. (32” steel pipe – gas line)

MARCH 2021

UTILITY INSPECTOR, Tulsa Inspection Resources – Walnut Creek, CA

Observed the installation of a water monitoring system next to pre-existing pipeline. Documented, filed and maintained proper inspection records and quality assurance documents. This was a Kinder Morgan project.

DECEMBER 2019 – JANUARY 2020

UTILITY INSPECTOR, Kestrel Field Services, Inc. – Rockport, CO

Inspect all clearing of ROW, ditching, lowering-in, stringing, padding and backfill. Inspected the application of RD6 tape on main line and tie-in sections. Inspect installation of CP test leads. Efficiently worked with survey and welding crews to lay FBE and ARO pipe. Documented, filed and maintained proper inspection records and quality assurance documents. (24” steel pipe – gas line)

AUGUST 2019 – SEPTEMBER 2019

UTILITY INSPECTOR, Audie Price Inspection, Inc. – Windsor, CO

Oversaw ditching and lowering-in. Inspected the installation of CP test stations, as well as, the use of cleaning pigs, painting of valves and ballards. Inspected the application of RD6 Tape on main line and tie-in sections. Documented, filed and maintained proper inspection records and quality assurance documents. (20” steel pipe – gas line)

JANUARY 2019 – AUGUST 2019

UTILITY/COATING INSPECTOR, Cleveland Integrity Services, LLC - Brighton, CO

Monitored fence building, lowering-in, jeeping, backfill, and clearing. Oversaw the installation of zinc ribbon, CP test stations and AC mitigation. Inspected the main line coating and tie-in crews. Monitored the application of two-part epoxy on road bore and directional drill sections. Inspected the applications of FBE and ARO coating. Documented, filed and maintained proper inspection records and quality assurance documents. (Gathering System – 4”-24” steel pipe- oil and gas lines)

MARCH 2017 – JANUARY 2019

UTILITY/COATING INSPECTOR, Quality Check Energy Services, LLC - Brighton, CO

Inspected all clearing of ROW, fence building, lowering-in, jeeping and backfill. Monitored the installation of zinc ribbon, CP test stations and AC mitigation. Inspected the application of FBE and ARO coating. Assured that the application of shrink sleeves were within specifications. Monitored the application of two-part epoxy on road bore and directional drill sections. Inspected repair of damages. Documented, filed and maintained proper inspection records and quality assurance documents. (Gathering System – 8”-24” steel pipe – oil and gas lines)

JUNE 2016 – NOVEMBER 2016

UTILITY/COATING INSPECTOR, Pipeline Safety, LLC – Litchfield, IL/Ames, IA

Witnessed lowering-in, ditching and backfill operations. Monitored the application of Polyurethane 3-layer coating system to block valves, launcher receiver set, and proofer set. Inspected the application of FBE and ARO coating, and repair of damages. Documented, filed and maintained proper inspection records and quality assurance documents. Promoted and encouraged safe work practices. (24” steel pipe – gas line)

SEPTEMBER 2015 – DECEMBER 2015

UTILITY INSPECTOR, Patriot Inspection Services, LLC – Butler, PA

Monitored all clearing, lowering-in, and backfill operations. Observed conventional road bores, tie-ins and installation of zinc ribbon. Worked with survey and welding crews to lay FBE and ARO pipe. Documented, filed and maintained proper inspection records and quality assurance documents. (36” steel pipe – gas line/10” poly pipe – water line)

APRIL 2015 – AUGUST 2015

UTILITY/COATING INSPECTOR, Energy Management Services- Edinberg, TX

Inspect all clearing of ROW, fence building, lowering-in, jeeping and backfill. Monitored the installation of zinc ribbon, CP test stations and AC mitigation. Inspected the application of FB and ARO coating. Assured that the application of shrink sleeves were within specifications. Monitored the application of two-part epoxy on road bore and directional drill sections. Inspected repair of damages. Documented, filed and maintained proper inspection records and quality assurance documents. (40” steel pipe- gas line)

SEPTEMBER 2013-JANUARY 2014

UTILITY/COATING INSPECTOR, Big Horn Technical – Belle Fourche, SD

Monitored fence building, bending, backfill and clean-up of ROW. Inspected the main line coating and tie-in crew. Inspected the application of FBE and ARO coating, and assured that it was applied within proper specifications. Inspected the application of RD6 tape on main line and tie-in sections. Documented, filed and maintained proper inspection records and quality assurance documents. (10” steel pipe – oil line)

JULY 2013-SEPTEMBER 2013

UTILITY/COATING INSPECTOR, Big Horn Technical – Watford City, ND

Oversaw fence building, ditching hydro testing and clearing and clean-up of ROW. Inspected the main line coating and tie-in crew. Inspected the application of FBE and ARO coating, and assured that it was applied within proper specifications. Inspected the application of RD6 tape on main line and tie-in sections. Documented, filed and maintained proper inspection records and quality assurance documents. (12” steel pipe – gas line)



Contact this candidate