Post Job Free
Sign in

Scrum Master Project Management

Location:
Montreal, QC, Canada
Posted:
June 12, 2024

Contact this candidate

Resume:

JULIO HERBAS

Engineering Manager

**** *** ** ***** ***** Laurent Mntreal H4r OL1

Telf 1-514-***-****

E-mail: ***********@**********.***

PROFESIONAL PROFILE:

Petroleum engineer with experience in the upstream and mid-stream sectors, evaluating, planning, and coordinating offshore and onshore production development projects, water and gas injection, carbon capture and storage, and geothermal. Interface Subsurface with Facilities. Hands on experience in wells, reservoirs, production facilities, transport and storage, economics, risks, and uncertainties.

Worldwide experience with international and national operators as BP, Maersk, Tullow Oil, Xodus Group, io oil and gas, PDVSA, Intevep, and joint ventures with Total, Statoil, Shell and CNOOC. Conversant with petroleum engineering software and Microsoft applications.

QUALIFICATIONS:

Petroleum Engineer El Zulia University, November (10 semesters).

Civil and Mechanical Engineering (7 semesters)

Gas Engineering, Engineering School Zulia University.

Project Economics, Institute of Advance Economics IESA.

LANGUAGES: Bilingual Spanish and English.

CITIZENSHIP: British and Venezuelan.

Society of Petroleum Engineers SPE fellow member number 0966235. Member of the BP society.

EMPLOYMENT HISTORY AND KEY ACTIVITIES

November 2020-present Independent Consultant (MineaOIl Limited).

oProposal to convert an oil field to a geothermal producer, using existing production facilities and wells.

oField development project plan for a heavy oil in Belize, wells, reservoir, production facilities, transport, and exporting facility in Belize, Fire Creek PLC.

oProposal project “effects of asphaltene in the wells, pipelines, and production facilities” in a Middle East field with Tar Mat overlying the aquifer. Geplan

oExothermal Chemical Treatments with Zero Carbon emissions to increase the production and reserves in heavy oil.

oModelling the conversion of a gas well to an oil producer Thunderball offshore North Sea field, Tangram Energy.

oEvaluation for acquisition Guatemalan field, wells, production facilities and reserves. Fire Creek PLC.

oProject planning to development Laguna Colorada geo-thermal resource to generate electrical power in Bolivia, wells models, electrical generation, and transmission lines.

oLecturing: Production Allocation Systems, Oil and Gas Production Fundamentals, Heavy Oil Production Facilities, Water Flooding Systems, Gas Condensates, Field Development Planning, Well Productivity, Reservoir Engineering, Well Testing, Reserves, Petroleum Economics and Enhanced Oil Recovery methods.

March 2018-2020 Leopardus Petroleum Technical Director. Technical and economic evaluations of various oil and gas fields in Argentina, Peru, Brazil, Colombia, USA (Texas, Kentucky, Oklahoma and California, North Sea UK & Ireland. Proposal for Reactivation Study Magic Field in Lybia, Arabian Gulf Oil Company (Agoco).

June 2017- March 2018 Independent Consultant (MineaOIl Limited)

oField development project high CO2 oil field North Italy, CO2 capture and reinjection, wax effects in wells and production facilities. Delta Energy & Primera Resources.

oCaptain field Offshore North Sea. Evaluating Polymer injection project, production and injection facility, injector wells, polymers quality, mixing and transport facility.

oAndrew field offshore North Sea, review production system, wells, and reserves

oSamaria field Bermudez complex Mexico, water flood performance and EOR Screening, recommended Nitrogen Injection and WAG (Water Alternate Gas) Pemex.

August 2015 – June 2017. Principal Projects Engineer, io oil and gas consultants London UK.

oOffshore projects: Fortune in Equatorial Guinea, Tortue in Tanzania, Ogo and Nsiko in Nigeria, Jackdaw, Tolmount, West Clair, Catcher, and Sea Lion in the North Sea, Giove, Robesti, Cignus & Aquila in Adriatic Sea, Tamar, Karish and Tanin in Egypt Mediterranean Sea, Nitrogen injection Ku-Maloob-Zaap & Cantarell, Ayatsil-Tekel-Utsil heavy oil in Mexico, Cassia-Amhersia-Cannonball gas compression in Trinidad Patao, Dragon & Mejillones gas fields in Venezuela and Amistad in Equator, Ogo in Nigeria.

June 2014 - June 2015. Principal EOR Reservoir Engineer Xodus Group London UK

oBadila field Chad republic Africa, water injection project identified 3% recovery factor increase (additional 3 million bbls, NPV $MM>90), and 5% increase by Polymer Injection project. (NPV US$10MM at oil price $50/bbl interest rate 15%). Road map for Enhanced Oil Recovery projects for India Oil.

oGas Cycling strategy for liquids recovery El Franig field in Tunisia.

oNorth Iraq Kurdistan Bijell field, fluid compositions and asphaltenes effects in the production facilities. Fluids composition model changing with depth demonstrated 20% higher oil in place; defined actions to prevent well plugging by asphaltene flocculation and mitigate productivity deterioration.

January 2011 - May 2014 Subsurface Leader Tullow Oil Uganda

oScreening study defined polymer injection as EOR method for Lake Albert fields in Uganda, added 200 million barrels resource. Designed Polymer injection Pilot Test for Kasamene and Kigogole fields; process diagram transport, storage, mixing and injection facility, incremental production, Capex, Opex and economics.

oCoordinated field development plan to produce 70000 bbls/Day, 100 horizontal producers and 50 water injector wells in the Jobi-Rii field, a 1.7 billion barrels STOIIP field; optimized well patterns increased 57 million barrels resources.

oCoordinated Dual Straddle Packer Drill Stem Tests in Jobi-Rii, Jobi-East, and Kasamene wells in Uganda.

oCoordinated EOR research projects: at Clausthal University in Germany, proving polymers combined with lake Albert water reduces interfacial tension increasing the recovery factor; and developing a polymer shear model at Texas University in Austin Tx.

December 2008-December 2010 Senior Reservoir Engineer Maersk Oil Copenhagen

oDesigned Water Injection project injecting sea water in chalk reservoirs offshore North Sea Svend field, added resource ~6 million bbls.

oElaboration a field decommissioning plan for the North Sea Svend field, including logistic, documentation and costs estimations.

oWell interventions in Lulita North Sea offshore field, added 2.6 million bbls reserve and increased oil rate by 40 % modifying separation pressures; prepared the gas cap depletion plan.

oReserves management and depletion plan Roar, Svend, Lulita and Svend fields.

October 2005 - December 2008. BP Senior Reservoir Engineer Aberdeen Scotland

oDevenick Gas Field Development to produce 120 MMscf/d and 6000 bbls/d liquids; integrated asset model VIP, MBal, Prosper and Gap; well test interpretations, and horizontal well length optimization 300m saving 20 drilling costs.

oEvaluation and managing portfolio of Hight Pressure High Temperature fields North Sea fields: Kate, Kesog, Puffin, JU-5, Devenick, Shearwater, Elgin & Franklin.

oFarragon field reservoir management, added 5.5 million bbls reserve

oAndrew & Cyrus fields added 0.8 million bbls reserves.

oDefined incremental resource 2.5 mmbbls in Farragon field by multiple contact miscible displacement gas injection project.

March-October 2005 Landmark Halliburton KL Malaysia Managing Consultant. Field optimization studies for the D18, Dulang & Tiong Ke-Pong fields.

2003– 2004 Consultant. Herbas Consultores Asociados Venezuela

oDevelopment project Musallim field in Oman PDO. Horizontal and multilateral producer and water injection wells, process diagram and facilities, capex, opex and economics.

oProduction Optimizing, well completions, and evaluation of exploration wells Casma Anaco field in Venezuela, Open Operator Nacional.

oDesigning well interventions to reduce water production injecting Polymeric Gels in producer and injector wells; defining adsorption, resistant factors to model the process with Stars and Eclipse simulators. Estimated incremental production in range 120-230,000 bbls per treated well in El Furrial field Venezuela.

2001- 2003 Project Leader Intevep, Technology Centre of PDVSA Venezuela

oWater and Gas injection strategies to optimize Oil production in El Furrial field.

oLagunillas-07 integrated study, Eclipse model, designed water injection secondary recovery project in Hexagonal Patterns and economic evaluations.

oAquifer characterization study to forecast the impact in the production facilities and wells of the Sincor project in Zuata field.

1999 - 2001. Senior Reservoir Engineer Sincor, a Total, Statoil, PDVSA venture.

Engineering studies to develop 180.000 bbls/d extra heavy oil with 200 horizontal wells, PVT, cores, well tests, well models, aquifers, simulations in Eclipse and STARS.

1996- 1999 Development Coordinator BP Venezuela.

oCoordinating the Pedernales phase2 development, interface subsurface facilities, documentation for platform design, construction, transport and installation in Pedernales shallow water offshore field. CO2 injection and WAG water alternate Gas process to increase the oil recovery. Abatuco-1X Exploration well in Abatuco block, well testing, planning and interpretations. Defining Business Development Opportunities for BP participation in Mexican oil industry. Acquisition study Option 29 Rubiales field in Colombia.

1980-1997Lagoven S.A. Venezuela. Reservoir Manager & Thermal projects.

oCoordinated the implementation of a Gas Injection project 450 MMscf/day at 6500 psi and 290 F in El Furrial. Defining gas sources, treatment, and transport requirements. High Pressure gas compression equipment and cost estimations. Added reserve >200 million bbls. Coordinated laboratory tests slim tube, and SCAL at Westport lab. Compression system, process flow diagrams, risks and economics. Identified, and implemented high angle wells in El Furrial field, achieving 15-20% increased oil rates.

oGas Injection Feasibility Study for El Furrial field, identified miscible displacement injecting dry gas by compositional simulations. Coordinated slim tube tests, swelling tests to verify multiple contact miscibility, and special core analysis tests (SCAL) in Intevep, Core Lab. And Westport laboratories. Elaborated Process diagrams, compression facilities, cost estimates and economic evaluations. Gas effects in oil with high asphaltenes content and mitigation actions to prevent wells plugging 1991-92.

oCoordinated the design and construction of a 450.000 barrels/Day water injection project in El Furrial field, a 8 billion barrels reservoir, added incremental reserve of 1200 million barrels.

oCoordinated water-oil and gas-oil relative permeability’s in aged cores, capillary pressures, asphaltenes deposition onset and water compatibility.

oDesigned and coordinated implementation of Pilot water injection test in Furrial field.

oLead development of 250.000 bbls/d in El Furrial field.

oCoordinated dual completions in El Furrial field wells, doubling production per well from 7000 to 14000 bbls/day.

oJusepin field reactivation study, including design of a water injection project.

oCoordination of thermal operations by steam injection in Cerro Negro, Jobo & Morichal fields.

oDevelopment of 200 mmscf gas Quiriquire field (deliverability tests, PVT & and cores).

oDevelopment of 30.000 bbls/d heavy oil Jobo, Morichal, Temblador fields. Cerro Negro Orinoco Oil Belt Venezuela Exploration and Appraisal campaign, well testing, data capture and interpretation.

oGas Engineer for the Ministry of Energy and Mines, in charge of gas gathering systems, metering, compression and utilization, aiming to achieve a 90% utilization of the produced gas.



Contact this candidate