HIGHLIGHTS
EXPERIENCE
Years of experience: **+Years.
EDUCATION
Master of Construction project management from Arizona State University ASU (Undergraduate)
Bachelor’s degree in civil engineering of National Military Academy of Afghanistan (NMAA) – Graduated 2010.
Istalif High School – Graduated – 2003.
CERTIFICATION
Construction Quality Management for Contractors/SW9-03-23-00129 Certificate U.S. ARMY CORPS OF ENGINEERS
OSHA – 30 Hours Outreach Training Program
CPR / AED / First Aid (Adult / Child / Infant / choking) Certificate.ID# 6415FBCD (Completion of May 04, 2023)
Certificate of EM385-1-1 40 Hour.
PCC workshop certificate Heather Smith USACE TSC
Advanced Project Scheduling Series Certificate (Dec-2010).
PROFESSIONAL EXPERIENCE:
Contractor Quality Control manager CQCM: Sep 2023–March 2024
ACE Consultant Specializing in Construction, Security and Training Services
Project: W912QR21C0031, P2: 467417,
ROTARY WING LANDING PAD CONROE ARMY RESERVE AVIATION BASE, CONROE, TX
Contractor Quality Control manager CQCM: Aug 2023–Sep 2023
ACE Consultant Specializing in Construction, Security and Training Services
Project: [H2003323] W912QROD0026 and W912QR22F0199
Davis-Monthan Reno B5247 47th Fighter Sq, Tucson, AZ
Construction Project Manager PM Dec.2021-Feb.2023
ROMSIT CONSTRUCT SRL, ROMANIA.
List of projects which I worked with ROMSIT companies in Romania:
Total price of projects was 67M Euro.
Rehabilitation of TRAIAN VUIA building (50.5x18.5m in 4 Floor) Technic college.
Rehabilitation of TEOLOGU building (31.5x28.4m in 3 Floor) High school.
Renovations of portable water system of ARMATA POPORULUI street Single pipe of diameter 25cm.
Renovations of portable water system of DOMNEASCA street double pipes of PEHD De 500mm and Teava PEHD De 250mm.
Renovations of portable water system of UNIVERSITATII -AI CUZA-LAHOVARY, DE APA street Single pipe of diameter 25cm.
New construction of tree floor building of Kindergarten of TIGLINA 2
GENERAL SCHEDULER. 08/2018 to 08/2021
SEPTIOGLU INS MAD LTD STI, AFGHANISTAN.
Worked as a General scheduling and assistant PM for KHOST International Airport complex project, Afghanistan.
The complex project was (in Multi Phases of contract, which included Runway, Taxiway, Apron, Parking, Control tower and airport Terminal) with a total cost of 113M.
QC Engineer 12-2014 to 08/2018
SEP CONSTRUCTION CO (TURKISH INTERNATIONAL COMPANY) AFGHANISTAN. Design and Construction of Parwan-e-two up to Qualey Khoja Bughra in 4 lines and 35 KM, including the design and construction of new water collection systems. The project price was 25 M USD.
Contractor Quality Control Manager CQCM 01-2012 to 12-2014
CLEVER CONSTRUCTION COMPANY, AFG
Project #: W5J9LE12C0067, ANP BP Company HQ Tapa Khoran, Lash-e-Juwan District, FARA PROVINCE, AFGHANISTAN.
Project DESCRIPTION
1-GENERAL (Mobilization/Demobilization, Security - Static &Dynamic, (UXO) Removal, O&M Manuals)
2-DESIGN PROGRAM: (Site Survey, Geotechnical Report, A/E Design, Record Drawings)
3-SITE DEVELOPMENT: (Site Demolition/Preparation, Site Grading, Well drilling Casing and Screening, Potable Water System and Storage, Elevated Water Storage Tank, Well Pump, Wastewater Collection and Treatment System, Electrical Generation and Distribution System, Generator Fuel Tank, Communication System, Fuel Storage, Generator Canopy, and Vehicle Fuel Point, Vehicle Fuel Tank, Fuel Pump)
4-FORCE PROTECTION: Perimeter Wall and Fencing, Gates, and Barriers.
5-FACILITIES: (Administration Multipurpose Bldg, Open Bay Barracks, Women’s Barracks, Gate House, Guard Towers, Guard Shack, Trash Collection Point, Warehouse, Secure Storage Building (ASP), Well House (U03), Composting Toilets)
SITE QC ENGINEER 10-2010- 01-2012
AZEEM CONSTRUCTION CO, AFGHANISTAN
Site QC Engineer for construction of Pojawah elementary school in Khenj District of Panjshir Provinces, and construction of Concrete footpath on Wardak provinces PRT.
737-***-**** ***********@*****.***
Mir Firozuddin Shamsi
C-QCM