ALAMGIR RAHIM
Building# ****/*** Muwailih Commercial Sheikh Khalifa Bin Zayed Al Nahyan Street, Sharjah UAE Cell no: +971-*********
E-mail: ************@*******.***, *******.*****@*****.*** To obtain a power utility power plant Shift Supervisor (Control Room Operator) position with a power generation plant and use my engineering skills in power generation, Safe Operation with Safety and control system.
EXPERIENCE PROFILE : 2006 TO TILL (18 YEARS)
::: Control Room Operator:
NE-1 950 MW Phase IV Mohammed bin Rashid Al Maktoum Solar Park Dubai (11th May 2023 to till date)
::: Control Room Operator:
NOMAC Al Mourjan Rabigh-2 IPP Saudi Arabia (2060MW CCPP) (17 th July 2016 to 19 April 2023)
::: Shift Supervisor (CCR): (08th Nov 2015 to 6 th June 2016) Saudi ARAMCO Cogeneration Power plant (ASHOMCo)
::: Associate Engineer Operation: (25 th July 2011 to 31st October 2015) K-Electric Formally (KESC) 560 MW Bin Qasim Power Station.
::: Assistant supervisor : ( 5 th January 2009 to 25 th July 2011 ) TNB Liberty Power Limited 235MW CCPP
::: Field Operator : (11th December 2006 to 5 th January 2009 ) TNB Liberty Power Limited 235MW CCPP
JOB RESPONSIBILITIES :
● Start-up, shutdown and emergency operation of the Combined Cycle Power Plant.
● Generate Notifications on SAP.
● Confirm and carry out safe isolation and normalizing of equipment’s.
● Effectively coordinate activities with the engineering and maintenance departments.
● Operation and Maintenance of Power Plant Main and associated Equipment.
● Organizational Health and Safety Management.
● Direct daily Shift activities and ensure safety, quality and high productivity.
● Perform the role of Incident Controller for the Plant (in the case of faults or emergencies, take charge, direct operations, Make decisions).
● Execute HV switching procedures, including isolation and earthling,
● Coordinating load dispatch with TCC.
● Maintain the equipment and accessories in safe; clean and healthy operating conditions in order to achieve reliable operation.
● Implement scheduled and emergency equipment changeovers / testing to ensure healthy condition of the equipment. DESCRIPTION OF EXPERIENCE :
STEAM TURBINE'S
● 3 203 MW PT and 1 100 MW CT Siemens Steam turbine.
● 3 Power Blocks each block 1 Steam Turbine (Siemens SST6 5000, SPPA-T3000 Automation Control) as well 244MW each.
● 1 Steam turbine Harbin Engineering 185 MW Hydrogen cooled, and stator water cooled generator of 250 MVA driven by steam turbine.
● 80MW ABB made Steam Turbine
GAS TURBINE'S
● 3 Power Blocks each block 2 Gas Turbine (Siemens SGT6 5000F 5EE, SPPA-T3000 Automation Control) as well 231MW each.
● 3 Gas turbine units, GE (General Electric) PG9171E Duel Fuel with DLN 1.0 Mark VIE Automation control with three generators provided by GE as well 128 MW each.
● 155MW V-94.2 Siemens Gas Turbine Ansaldo Energia HEAT RECOVERY STEAM GENERATOR (HRSG)
● 3 Power Blocks each block 2 HRSG’s (BHI) type of Triple pressure.
● 3 Harbin Engineering HRSG’s type of dual pressure. NATURAL GAS COMPRESSOR
● 7 x 16.7% Gas compressors centrifugal gas compressor units (6 duty,1 stand-by), each with automatic pressure and temperature control. Design Pressure: 43 barg / 55 barg (before / after compressors) Design Temperature: 70 C / 75 C (before / after dew point heaters).
● Three Natural gas compressor/Dry gas seal compressor to boost up gas pressure up to 28 bar, centrifugal double stage HP and LP compressor with dry gas seal N2 system 50% capacity of each compressor with inter stage cooler and cyclone separators.
WATER TREATMENT AND DESALINATION SYSTEM:
● Operation of DCS based Water filtration, Desalination and Demineralized production system by means of Dissolved air filtration (DAF) SWRO, BWRO based Desalination system 140 mᶾ/hr and Mixed Bed method one unit of Demineralized water plant of 240 mᶾ/hr.
DCS/HMI.
● Siemens SPPA-T3000, Yokogawa Centum VP, GE Mark VI-e and EMERSON (Ovation), TRAININGS CERTIFIED :
● Siemens SPPA-T3000 Simulator training in Orlando, FL, USA
● DCS Yokogawa Centum VP
● NAFFCO Certified Fire & safety Training NOMAC, R2IPP KSA.
● GE Operation training Saudi ARAMCO Cogeneration Power Plant Rastanura Saudi Arabia.
● GE Mark VIE control training Saudi ARAMCO Cogeneration Power Plant Abqaiq plant Saudi Arabia.
● APEX Certified Occupational Health & safety Training ASHOMCo KSA. QUALIFICATION :
B. TECH (HONS) Electrical (DADABHOY Institute of higher education) 1st Division D.A.E Instrumentation Processing Control (IPC) A Grade / 73% PERSONAL PARTICULARS :
Father Name : Rahim Buksh
NIC Number : 42501-2693726-9 Home Country Postal Address Date of Birth : 24th October 1986 A-2033, Gulshan-e-Hadeed, Phase II. Bin Qasim, Passport# : DA9157264 Karachi, Pakistan.