Peyman Moradi
Dallas, Texas, United States
***.********@*****.*** 940-***-****
linkedin.com/in/peymanmoradi
Summary
A seasoned mechanical engineer with expertise in HVAC systems and plumbing design for residential and industrial buildings. Specializes in managing pipeline and valve chamber projects within the oil and gas industry. Passionate about creating efficient and sustainable solutions, consistently ensuring optimal comfort and functionality for occupants. Known for delivering high-quality designs by applying cutting-edge technologies and codes. Thrives in challenging terrain and complex environments, always seeking innovative approaches. Committed to excellence, continuously striving to improve and enhance mechanical systems for an environmentally friendly and more sustainable future. As a result of the COVID-19 pandemic, I made the difficult decision to close my workshop and subsequently migrated to the USA. This transition provided me with the opportunity to obtain the necessary certifications. I am fluent in English and do not require any visa support. Experience
Workshop Establishment and Manufacturing Projects
GARMABSARD ENGINEERING CO
Jan 2017 - Mar 2022 (5 years 3 months)
Established and operated a workshop to manufacture various mechanical components and systems, catering to diverse industries.
Produced fittings, pressure vessels, tanks, and food industry machinery, showcasing expertise in fabrication and machining.
Undertook insulation and HDD projects, demonstrating versatility and adaptability in addressing market demands.
Completed projects ranging from hydrostatic test machines to ice-bank production units, highlighting innovation and technical proficiency in manufacturing processes. Oil and Gas Pipeline Projects
GARMABSARD ENGINEERING CO
Jan 2012 - Dec 2016 (5 years)
Company: Pars International Pipeline Co.
Projects: Oil and Gas Pipeline Construction
Contributed to oil and gas pipeline projects, focusing on mechanical construction works and infrastructure development.
Executed pipeline construction, welding, valve chamber installations, insulation, and cathodic protection systems.
Peyman Moradi - page 1
Managed the installation of complex mechanical systems, utilizing advanced equipment such as Horizontal Directional Drilling machines.
Subcontractor Construction and Subcontracting Projects GARMABSARD ENGINEERING CO
Jan 2005 - Dec 2012 (8 years)
Companies: Azin-Tarhe Mantaghe (2005 - 2008), Parss International Pipeline (2008 - 2012) Projects: Residential, Administrative, and Entertainment Complexes Collaborated as a subcontractor for main employers, specializing in mechanical works for large-scale complexes.
Managed mechanical installations for Mahmood Abad complex, including piping, plumbing, HVAC systems, and wastewater treatment.
Oversaw the installation of a membrane bioreactor wastewater treatment system, ensuring compliance with industry standards.
Expanded operations to Asalouyeh, executing similar projects with additional VIP building construction. Pumping and Distribution Chamber for Golestan Dam no. 2 GARMABSARD ENGINEERING CO
Jan 2002 - Dec 2004 (3 years)
Managed the construction of a pumping and distribution chamber for Golestan Dam no. 2, overseeing mechanical installations and project supervision.
Coordinated pipings, valve chambers, and pump installations, ensuring adherence to project timelines and quality standards.
Successfully navigated challenges such as flooding events, demonstrating resilience and adaptability in project management.
Food Industry Projects:
GARMABSARD ENGINEERING CO
Jan 1995 - Dec 2001 (7 years)
Role: Project Manager and First Senior Engineer
Projects: Malt extract and tomato paste production plants. Managed design, construction, and commissioning of malt extract production facilities, including machinery design, process layout, and installation supervision. Established malt extract plants in Neishabour and Tabriz, optimizing production capacity and expanding into Non-Alcoholic Beer production.
Peyman Moradi - page 2
Led the construction of tomato paste plants in Shemshad, Azarshahr, and Sanandaj, demonstrating expertise in concentration and extraction processes. Directed the setup of a non-alcoholic beer plant in Qeshm Island, considering unique challenges posed by extreme tropical climates.
Oversaw the construction of a wastewater treatment facility in Kish Island, focusing on concrete infrastructure and advanced treatment processes.
Education
Amir Kabir University of Technology
Bachelor of Engineering, Mechanical Engineering
1982 - 1986
Licenses & Certifications
FE Exam - NCEES
Professional Engineer (PE) - NCEES
Issued Jan 2024 - Expires Dec 2034
Skills
Equipment Design • Project Engineering • End-to-End Project Management • Wastewater Treatment • Project Planning • HVAC Design • Plumbing Design • Creative Problem Solving • Pump Stations • Sustainable Development
Peyman Moradi - page 3