Post Job Free
Sign in

Civil Engineer Project Manager

Location:
Moratuwa, Colombo, Sri Lanka
Salary:
60000$ per annum
Posted:
June 09, 2024

Contact this candidate

Resume:

Page

*

Address: No. **, Gampola road,

Meewatura, Peradeniya, Sri Lanka.

Tel: Mobile: +94-776******,

Home: +94-812-***-***

E- Mail: ***************@*****.***

Name in full : Adikari Mudiyanselage Wickremasinghe Name with Initials : A.M. Wickremasinghe

Date of birth : 09

th

August 1968

Age : 51 years

E-mail : ***************@*****.***

Permanent address : No. 99, Gampola road, Meewatura, Peradeniya, Sri Lanka. Contact number : +94-776******, +94-812******

Gender : Male

Marital status : Married

Passport No : N2027024 I.D. No: 682220759V

School Attend : Mahinda College, Galle.

Nationality : Sri Lankan

PERSONAL PROFILE

Page

2

Higher Education:

Studied at University of Peradeniya, Sri Lanka

Degree: Degree of Bachelor of the Science of Engineering (B Sc Eng.) Engineering graduate from the University of Peradeniya specialized in the field of Civil Engineering – (1991 – 1996)

Secondary Education:

Studied at G/Mahinda College, Galle, Sri Lanka.

I have followed following management subjects in the University of Peradeniya, Financial Management & Accounting

Industrial Management & Marketing

Construction Management

Human Resources Management

In this project we have done several surveys and end of the camp we had to propose a solution for a narrow bridge in our surveyed road. Our project proposal was selected as the best project proposal. Level 4 – Final Year Project

“Development of Peradeniya Town” was the project carried out for my final year comprehensive design project.

Level 4 – Research Project“Risk Of Slopes In Kandy City Area” was the project carried out for my final year research project.

EDUCATIONAL QUALIFICATIONS

MANAGEMENT SKILLS

Level 3

– Survey camp project

PROJECT WORKS

Page

3

RECENT WORK EXPERIENCE

Presently working as a project Manager at Galle Fort Rampart restoration and improvement package - 01 Name of project: Restoration and Improvement of Galle Fort Rampart-Package-01. Sri Lanka. Project Value – 270M

Year: January 2020– To date

Client: Archeological department project features: 1. Reconstruction of collapsed walls, collapsed drains, gun bases, plastering, roofing, retaining walls, buttress walls, doors and windows.

2. Conservation of ancient constructed by Dutch in Galle Fort rampart walls. 3. Boulder stack packing prevention of erosion by sea. 4. Entrance arches supporting for conservation, excavation and waterproofing with lime concrete and back fill. 5. Conservation of steel works of gun artillery and other items. Those all construction categories controlled by me. During in this project I performed following tasks,

• Coordinated with Client consultant Design Engineer, Architect and got the relevant approvals

• Coordinated with subcontractors

• Monitoring progress and quality maintained, QA/QC is of utmost priority

• Monitoring program and billing circle, manage the project budget and cash flow by working closely with the commercial team

• Participated progress review meeting

• Weekly monthly presentations

• Evaluated construction progress and issued monthly progress

• Implement a risk mitigation plan and assign responsibility for risk management

• Liaised with the client for major decision making

• Ensured timely allocation of project resources

• Managed the performance of the design team and delivery contractors

• Development and implementation of project management strategy, structure and plan

• Daily meeting with key staff to maintain progress Presently working as a senior project Manager at fuel tank foundation project BIA Katunayake Name of project: Development and upgrading of Fuel Hydrant system BIA, Sri Lanka. Project Value – 70M

Year: June 2019– To date

Client: CPC project features:

1. Control foundation – 2 nos tank foundations area of one tank=278 m2 2. Sheet piling work, 2 nos ring type tank foundations, diameter 18.8m PROFESSIONAL QUALIFICATIONS

Page

4

7. Back filling 1000 cubes of soil compaction field density test 98% 8. HDPE layer laying and hot welding

9. Sand bed filling 100 cubes

10. Dry sand bitumen mix 100mm thickness layer area = 278m2 x 2 11. Oil water drainage system with circular type manholes 6” & 8” diameter HDPE pipes 110m length Those all construction categories controlled by me. During in this project I performed following tasks,

• Coordinated with Client consultant Design Engineer, Architect and got the relevant approvals

• Coordinated with subcontractors

• Monitoring progress and quality maintained

• Monitoring programe and billing circle

• Participate progress review meeting

• Weekly monthly presentations

• Evaluated construction progress and issued monthly progress

• Implement a risk mitigation plan and assign responsibility for risk management

• Liaised with the client for major decision making

• Ensured timely allocation of project resources

• Managed the performance of the design team and delivery contractors

• Development and implementation of project management strategy, structure and plan

• Daily meeting with key staff to maintain progress Worked as a Construction Engineer (similarity Assistant Resident Engineer) at I roads project UVA province Bandarawela in Association with Consultant Engineers & Architects Associated Pvt.Ltd. Name of project: Iroads Construction project (funded by ADB) Year: August 2018 – 2019 Location: Bandarawela, Sri Lanka Client: Road Development Authority

Main project features: mainly 16 no’s roads construction total 38km Bridges one 12m long span and 5 no’s other 7m long span Approach RDA Road length=9km and Road width =10m (2lanes), PRDA and PS roads single lane Box type culverts 32 no’s size more than 1m x 1m and pipe culverts done Position held: Construction Engineer (Actually I performed the job similarity to ARE position in this project) Activities performed:

• Monitoring Daily program and progress of contractor

• All working drawing and all method statements checking and correcting

• Inspection of all works (All sub and super structure construction works; earth works ABC and asphalt works)

Page

5

• Assisting and checking interim bills, quality assurance documents for. payments

• Coordinating with utility agencies for diversion of utility facilities

• Together with RE, carrying out joint final inspection completed works • Attending weekly progress meeting

Worked as a Construction Manager at Maga Engineering Pvt. (2017 September to 2018 August)

• Proposed 12th stories Ayurweda hospital high-rise project -Rajagiriya (no of 150 beds facilities and project cost 1.2 Billion)

In this project all works done under my guidance

During in this project I performed following tasks,

• Coordinated with Client consultant Design Engineer, Architect and got the relevant approvals

• Coordinated with subcontractors

• Monitoring progress and quality maintained

• Monitoring program and billing circle

• Participate progress review meeting

• Arrangement site works and site staff earlier finish of master program Construction of highway bridges girders precast yard invoices make and arrangement. Construction of university railway station of cladding works arrangement and invoices preparation Construction of underground/over ground railway project invoices arrangement preparation All above categories of ipc preparation checking and sending Worked as a Project manager of N & A engineering Pvt 15 stories high rise building projects at Kotahena, Narahenpita and Colombo 05, 12 stories high rise Siddalepa hotel building project Mount Lavinia. (2016 January- 2016 October).

worked as a Cost control engineer (invoices)at Redco international - Qatar. New orbitaj highway and truck rout Salwa road to North relief and underground railway stations construction – Doha,Qatar(From 2016 November - 2017 September)

These projects work have completed under my guidance. There are three cost control engineers have wor ked under my control in this period. Page

6

In this project all works done under my guidance

During in this project I performed following tasks,

• Coordinated with Client consultant Design Engineer, Architect and got the relevant approvals

• Coordinated with subcontractors

• Monitoring progress and quality maintained

• Monitoring program and billing circle

• Participate progress review meeting

• All the site work arrangement planning to complete to the required duration I have completed all invoices of sub-contractors works on recognized training and Worked as a Resident Project Manager at Isuru engineering of Sri Lanka& Yuman enterprices (From, 2011 To 2013).

• Construction of 120 nos housing scheme project at Madifushi

• Construction of language studies building project of bikshu university Project Value –Rs.400 Million (5 stories building)

These two projects had been completed on schedule time under my guidance. During in this project I performed following tasks,

• Coordinated with Client consultant Design Engineer, Architect and got the relevant approvals

• Coordinated with subcontractors

• Monitoring progress and quality maintained

• Monitoring program and billing circle

• Participate progress review meeting

• All necessary tenders preparing and all materials ordering

• Monitoring daily work progress with program and recovering delay works BUILDINGS CONSTRUCTION

Page

7

Site Manager

B.G. Martin Appuhamy

& sons (Pvt) Ltd, Kandy : (i) New Laboratory 2 store building for Department of physics Faculty of Science

Site Engineer: Sanken Lanka

(Pvt) Ltd.

Site Engineer: Maga Engineering

(Pvt) Ltd

Consultant Engineer:

Department of Buildings

Centeral Province

Kandy – 1

(i)

(ii)

(i)

(ii)

(iii)

(i)

(ii)

(iii)

Railway Rehabilitation Project Rathmalana.

(Japanes Aid & Consultants)

12 nos Silos and 10 store Ware house

Extension Project in Prima Company (Pvt)

Ltd at

Colombo – 15

(From 1996 to 1998)

Construction of 3 Store Building in Junior School

Project Kegalla and Rathnapura. (Japanese Aid

and Consultants) and

Construction of Millennium Information

Technology Center Building Complex Project at Malambe. And

Southern Provincial Roads Improvement Project

(ADB Funded) at Galle

(From 1999 to 2001)

Construction of 2 Store office Building and

Circuit Bungalow, Export Agriculture

Department, Nuwara Eliya.

Construction of Director’s bungalow, Export

Agriculture Department, Gannoruwa and

Repairs to seed stores seethe Eliya farm

Department of Agriculture and

(iv) Repairs to buildings belongs to kandapola farm Department of Agriculture. (From 2001 to 2002)

Page

8

University of Peradeniya. (From 2002 to 2003)

Site Manager :

Central Supplier’s (Pvt) Ltd

Kalugalla Road, Kegalle.

(i) Construction of 3 story building for

District Engineer’s office, National Water

Supply and Drainage board – Kegalla and

(ii) Construction of 2 store building for Electrical and Mechanical Workshop, Technical College –

Kegalla and

(iii) Construction of building Complex for six Youth Corps including water supply, drainages, roads,

Structures such as retaining walls at about 3

Million Rupees Projects.

(From 2003 to 2006)

Project Manager (i) Reconstruction of (Tsunami) 78 & 42 New Housing Units Isuru Engineering (Pvt)Ltd. On Th.Madifushi,Republic of Maldives.

(With Yuman Enterprises (Pvt) Ltd.) (From Apr. 2011 to Feb. 2013) Project Engineer (i) Brandix India Apparel City construction project in India Sanken Precision India (Pvt) Ltd (From Sep. 2013 to Apr. 2014) Andra pedes – India Project Engineer (i) Indipendence house building construction in Seychells Sanken Overseas (Pte)Ltd. (From Sep.2014 to Aug. 2015) Project Manager (i) High rise apartment building project, Kotahena,Sri Lanka N& A Engineering (Pvt)Ltd. (2015/2016)

Construction Manager (i) Ayurweda hospital building site - Rajagiriya Maga Endineering (Pte)Ltd ( From Aug. 2017 to Aug. 2018 ) Page

9

ROADS CONSTRUCTION

Site Engineer :

Maga Engineering (Pvt) Ltd

Project Engineer

State Engineering Corporation Of

Sri Lanka, Kurunagala. :

Project Manager

Jayawansa Construction (Pvt) Ltd

Mawathagama :

Civil Engineer :

(i)Southern Provincial Roads Improvement Project

(i)

(i)

(ii)

(ADB Funded) at Galle

(From 1999 to 2001)

Improvement to Thumbuwa Junction to

Ponnilawa Asirigama via Deegama Road Project

79 Million Rupees Japanese Aid Project (From

2006 to 2007)

Reconstruction of Bridge on 2/1 (at Padukka) on

Galagedara Horana Road (45 Million Rupees

Project) and

Reconstruction of Bridge no 6/1

(At Rattanapitiya) on Colombo – Horana Road

(65 Million Rupees Project)

(From 2007 to 2008)

Taisie Corporation (i) STDP – 2 Dodangoda to Kurudugahahethekma

. (Southern Highway ) progress plan works planning &

(From2008 July to 2010 Sep.)

Cost Control Engineer (1) New Orbital Highway and truck Rout Salwa Road to North Redco International North Relief Road – Dhoha,Qatar.(From Nov.2016 to Sep. 2017) Construction engineer (1) Iroad project UVA province –Bandarawela CEA consulting (From Sep. 2018 to June 2019)

Page

10

WATER TREATMENT PLANTS AND PIPE LINES

Area Engineer :

MT Hojgaard International (i) Town south of Kandy Water supply Project

(2008 ) for water treatment plants, intakes & pipes Laying,joint inspections & arrangements…etc.

Member of University of Peradeniya Buddhist Society In school

Member of school science society

Page

11

Participated in athletics for the inter house sports meet 01. Eng. Mr. N M A Munasinghe 02 . Eng. Mr. B T Priyantha Construction manager Planing engineer,

Maga engineering (Pvt)Ltd Resource Development Consultant. No. 200, (077*******)

Nawala Road,

Narahenpita.

(077*******)

I hereby certify that the information given is true and accurate to the best of my knowledge. I shall be glad if I am offered an opportunity to serve your steamed establishment and I assure you that I shall always discharge my duties with devotion and loyalty. Thank you,

Your’s faithfully,

(A.M. Wickremasinghe) (Date)

Page

12



Contact this candidate