Post Job Free
Sign in

Project Manager Regional

Location:
San Antonio, TX, 78247
Salary:
140,000.00
Posted:
July 15, 2024

Contact this candidate

Resume:

Ben Matous

***** ***** ****

San Antonio

Texas *8248

bmatous@msn.c

om

Cell 210-***-****

Summary of

qualifications

Over Forty years of successful construction business and operations management/supervision in five major U.S. markets.Full knowledge of Corps of Engineers

contracting procedures, including all requirements of the RMS system, full knowledge of AIA documents

knowledge in E 4Clicks, and Timberline, Procore, Sage. 30 Hour OSHA CPR & First Aid Certified.

Professional

experience

August 2023, Present

Project Manager

AIS Artic Slope

Working on Eagle Island North Carolina. This project is a heavy Civil project. This site is for the Corps of Engineers. The dredging from the rivers is placed here for storage. There are a lot of issues with soil that require a lot of engineering and monitoring. The site is a mile long and three quarters of a mile wide.

June 2019 July 2023

Project Manager

D Wilson Construction / Employee Owned

Working on a design build bond take over at SAMMC North Fire Station. Worked through re-design correcting mistakes and compliance issues. Bought out project set budget mobilized to site managed all aspects of the project from staff efforts field efforts tracking, P&L and reporting all aspects to Corporate. November 2016- June 2019

Construction Manager

Managing, preconstruction, project start up through finish out.

Review bid documents, submit, bids, project start up, oversee construction, close out, working with various companies helping to organize and streamline overall production.

Sept 2015-Nov 2016

Tunista Construction LLC

Texas Regional Manager

San Antonio, Texas

As Texas Regional Manager I in charge of managing all task orders for a $30 million Lackland AFB IDIQ MATOC. Task orders ranged from $1.3 - $1.6 million. Part of the goal for these task orders was met and exceed the 8(a) disadvantage requirements by thoroughly reviewing

and contracting 8a, woman owned, minority, and HUB Zone qualified SBA contractors.

August 2011- 2015

Alamo City Constructors Senior Executive Project

Manager

Developing systems for all project pre-construction, buyout and implementing process for proper project documentation. Worked with accounting to obtain

accurate tracking on profit and loss. Helping

reconfigure existing IDIQ’s in multiple states as well as helping employees with specific issues for better

management of the projects. Current bonding capacity has doubled in the first two months of employment. Brought the company up to meet all OSHA standards

including correcting the ENR for the company, re-

writing a company safety plan as well as correcting job specific safety plans. Working in a positive direction to have the company expand from a thirty-five (25) million dollar a year business into a forty-five (45) to fifty (50) million dollar a year business. Awarded a 5 year 75– 100-million-dollar MACC at Randolph AFB.

January 2009-August 2011-

HJD Capital Electric, Henry Davila

Senior Vice President of Operations

Developed and streamlined daily operations and

accountability for all projects, increasing profits by more than 25% in the first six months. Implemented a

marketing and development plan of which gained 50

million dollars in MATOC IDIQ contract increasing the company’s volume by more the 50% for any one annual growth period. Obtained MATOC IDIQ’s and SATOC

IDIQ’s along with obtaining sole source work all with the Corps of Engineers. Helped this company down a path with increased profit, projecting a minimum growth production of 15% per year for the next five years. November 2007-November 2009

Turner Construction

Senior Project Manager

Project Manager / Integration Matrix Manager /

Superintendent Phase One / Wachovia Service

maintenance contract

Construct DATA Center in San Antonio TX

Daily duties are help in pre-construction and all

operations systems. Along with helping new hires to achieve goals and progress in their furthering career opportunities.

April 2005-October 2007 –

W.G. Yates and Sons Construction

Senior Project Manager

Duties to oversee multiple project managers and

projects. Prime responsibility to help produce timely delivery of projects while maintaining projected profits while training and structuring the project teams.

Oct. 2003 –May 2005 –

CF Jordan.

Project Manager

Duties of all project management from schedule to

invoicing to company representative to the

Government. Worked on Corps of Engineers and other government projects. The position is set up as

Construction Management for the company’s role on

this project.

April 2000 - Feb. 2003

A&S General Contractors, Inc.

Project Manager

Duties of bidding, design build, hard bid projects, scheduling, issuing contracts, change orders, pay

estimates, oversee day-to-day operations of multiple projects. Chaired monthly meetings at job site managed multiple superintendents as well as various office staff. Feb. 1995-April 2000 –

Corps of Engineers CQC / Project Manager

Select Constructors

Performed all phases of CQC responsibilities as outlined by the Corps. Of Engineers. To include submitting all pay requests and tracking the progress of the job with the help of the computer. (Used primavera tracing program) This also includes the Corp. three phase inspections. March 1990- Feb. 1995-

Project Manager / Superintendent

Watkins Construction

Directed and supervised Government contracts all over the United States, to include Texas, Oklahoma, Kansas, Arkansas mostly in the south-central region. Successfully managed and supervised work crews purchased material and acted as liaison to architect for multiple contracts. To include all correspondence, preparing contracts and all pay requests.

Sept. 1988-March 1990

Field Engineer

J W Bateson

Worked on multi-million-dollar projects from Army

barracks to Multi-level Hospitals. Work included all layout and grading for projects from Start to finish. Including all layout and elevations.

July 1982-Sept. 1988

Owner / Operator

Owned and operated my own construction business to include bidding running and closing many projects in commercial and residential construction.

June 1979- June 1982

U.S. ARMY- DISABLED VET

Flew and maintained multiple aircraft including the UH 1H, Huey, S and G model Cobra, and flew the first Black hawk West of the Mississippi.

Computer Skills

Many computer abilities include estimating programs such as Timberline, AutoCAD, Digitizer, Plotting, SureTrak, Expedition, Corps of Engineers RMS system and many revised versions to fit the needs. Also literate in Windows 3.1, 95, 98, ME, 2000 Excel, Word, Viewpoint, Router, Pro Log, Lotus, with tracking scheduling, contracts and pay estimates. E 4Clicks Procore P6 P Vault Sage 300.

Education

High school graduate from McClure North, Florissant Missouri.

College, / Trade 3000 hours of 6000 credited hands-on Aviation A&E program with Washington State University. Project List

Cost Project Description Customer

● 500 million Dollar Data Center, San Antonio Texas - Microsoft

Consisted of tilt up structure and massive amounts of encased underground high voltage, office finish out and high security systems.

● 75–100-million-dollar MACC Randolph AFB

Task order contract with over 50 TO’s issued

obtained over 32 of the TO’s which were ranging

from small repairs to 5.5 million in concrete repairs to LAFB runway.

● 60 million Dollar Hospital, Ft. Sill Okla. Corps of Engineers

Multi-level structure with trauma center, operating room area outpatient area and facilities care.

● 50 million Dollar MATOC- Corps of Engineers

Task orders of over 8 million dollars of concrete

troop walk accented with brick pavers, walking

bridges,

● 8.4 million Fire Station SAMMC North Corps of

Engineers

● 7.5 million Dollar Task Order, METC Ft Sam

Houston, Corps of Engineers

● 5.8 million Dollar Task Order IMCOM Ft Sam

Houston- Corps of Engineers

The Task Order contract consists of 8 parking

lots, some upgraded some new construction

with lighting and landscaping.

● 32 million Dollar Multi Level Barracks, Ft. Sill Okla. Corps

Multi-level concrete structure with precast exterior, cade area and 5, 3 story troop area including

kitchen and recreational area.

● 26-million-dollar New Business Building Texas

State University- Texas Education

5 story high end finish school for business with the Dean occupying the 5th floor.

● 24 million Dollar Jail/Sheriff's Office, Randall County, Amarillo, Texas, Randle County

● 24 million dollar100 bed facility with 72k square foot Sherriff’s office,

dispatch, impound, and lab.

● 18-Million-dollar High School Navarro High, Navarro Texas

Ground up High school with offices, library, and

cafeteria.

● 16-Million-dollar Eagle Island Confined Disposal Facility Improvements for Cell 1

Project consisted of moving over two million cubic yards of material to rebuilding interior and exterior dike for a dredging containment area.

● 14 million Dollar Fitness Center Corps project

Randolph Air Force Base, Corps of Engineers

Ground up facility with elevated running track,

basketball court, childcare area, full locker rooms and a nutrition center with offices cooking

classroom.

● 7.6-million-dollar Commissary Fort Campbell

Kentucky, - Fed Gov DECA

Full refumigation and cooler replacement along

with new flooring and decor

● 9.8-million-dollar New Command Wing Goodfellow

Air Force Base, - Corps of Engineers

New 2 story facility full force intrusion and secured facility housing the base commander.

● 5 million Dollar School Springdale Ark City of

Springdale Ark

Hard build school addition for SISD

● 1-5 million Dollar Multi Projects, Arsenal Pine Bluff Ark- Corps of Engineers

SABRE contract with multiple Task Orders for

remolding all sorts of existing buildings and some exterior improvements.

● 5 million Dollar Housing Project, Shepherd Air

Force Base TX. Base Contracting

Demoed everything except the bedrooms on

multiple base houses.

● 3 million Dollar Barracks Remodel Altus Air Force Base Okla. Corps of Engineers

Full roof replacement along with interior updates

● 2.8 million Dollar Multi Level Multi Building

Remodel L.R. Air Force Base / Base Contracting

● 2.6 million Dollar State of Texas Youth Commission Admin Seg. /Infirm Building- State of Texas Youth

Commission

Ground up hard build youth segregation building

in Gainesville Youth Prison.

● 1 million Dollar School Addition Benton Ark. City of Benton

Hard build school addition to existing school

● 500 thousand Dollar Mall Springdale Ark. –Private Investor

Built strip mall including all earthwork metal

building composites and storefronts.



Contact this candidate