Post Job Free
Sign in

Experienced Architect

Location:
Doha, Qatar
Posted:
July 08, 2024

Contact this candidate

Resume:

I

I

f

A

Zoilo

Intl. Assoc.

Flat **, Build

+974-556648

zegarchitect@

Position App

Dear Sir / M

I am an arch

buildings, h

commercial

I am writing

energetic lea

and delivere

deadline, sp

from concep

drawings, tr

activities wit

the current

construction

detailing wit

My attention

accurately a

ability to tak

As an archit

stem directly

company us

Project Arch

A gr

expe

(22)

(25)

Mid

My p

Doh

serv

also

Gold

Corp

Asso

Eric A

. AIA, UAP,

ding 18, Street

57

@yahoo.com /

plied: EXPE

Madam:

hitect with va

ealth care, h

buildings.

g to express

ader with mo

ed the highe

ecification a

ptual design,

racking site

th clients, co

version Au

n design, doc

th experience

1. Architec

2. Sustaina

3. Researc

4. Cross-F

5. MEP &

6. Goal Se

7. Team Le

n to detail

and to the hig

ke an authori

tect, I learn

ly from work

se a result-o

hitect experie

raduate of B

erienced Arc

) years. I am

) years. And

ddle East Cha

present work

ha. I have al

ving as an Ar

o noted my re

den Link Sc

poration) &

ociates) with

A. Ge

, UPDA MM

t 920, Zone 15

zega_jafo@y

ERIENCED

arious projec

hospitality, i

s my interest

ore than 29

est professio

and elevated

, program d

activities a

onsultants, co

uto CAD sys

cuments spe

e in CAD sof

ctural, interio

ability

h & Develop

Functional Sk

Structural C

tting

eading

and excellen

ghest possibl

itative role w

through exp

king in one

oriented prob

enced in suc

Bachelor of

chitect, Arch

m practicing

d an Internati

apter, since J

k is in Qatar,

lso work for

rchitect, Arch

ecent experie

chool Buildi

7-storey Fil

h the aid of

eniblaz

ME, GSAS C

5-Doha Al-Jad

yahoo.com

ARCHITEC

cts and cons

institutional,

t in the Exp

years of exp

nal standard

quality leve

development,

and progress

ontractors &

stem, Autode

ecifications a

ftware. Areas

or, landscap

pment

kills / Proble

Coordination

nt problem-s

le standard.

when the situ

perience. Bec

’s passion,

blem solver

ccessfully com

Science in A

itectural Des

as Licensed

ional Associa

January 201

, serving as a

r six (6) yea

hitectural De

ence in the P

ng in Cama

lia Corporat

special Eng

zo

CGP

deeda, Doha,

CT

structions on

, landscapin

erienced Ar

perience as a

ds to ensure

ls. Demonstr

and design

s, provides t

& staff. Excel

esk Revit an

and schedule

s of Expertis

ing design &

m Solving Sk

n / Time Man

solving skill

I am comfor

uation arises.

cause I enjoy

I submit my

with a thirs

mpleting dive

Architecture

signer and A

d Architect (

ate Member

0.

a Senior Arc

rs in the Ki

esigner, Proj

Philippines w

arin 2, Calo

te Center in

gineering sof

Qatar

luxury hous

ng design, in

chitect posit

a Team leade

e the comple

rated ability

n drawing de

technical ov

llent work kn

nd engineer

es, with exce

se include:

& project sup

kills

agement

ls ensure tha

rtable workin

y my work a

y resume to

st for new c

erse commer

e at Far Eas

AutoCAD us

(UAP-IAPOA

of American

chitect from F

ingdom of B

ject Architec

was planning

oocan City (

Makati City

ftware such a

ses, housing

nterior desig

tion at your

er, and Seni

etion of larg

to lead the f

evelopments

versight and

nowledge of c

ring softwar

ellent unders

pervision

at every pro

ng as part of

and know tha

you for co

challenges?

rcial projects

stern Univer

er for more

A) for more

n Institute of

Faisal Shara

Bahrain for t

ct and an Inte

g and manag

(from Borlan

y (from Trist

as AutoCAD

development

gn works, res

firm, an inn

ior Architect

ge-scale proj

full life cycle

through to

coordinatio

computers, p

re to effectiv

standing of

oject I work

f a team but a

at success an

onsideration.

As a season

s, I bring as,

rsity and also

than twenty

than twenty

f Architects (A

af Engineerin

three compan

erior Design

ging the 2-St

nd Developm

tan Y. Calixt

D release 14

t, sustainable

sidential and

novative and

t. Established

jects meeting

e of projects

construction

on of projec

proficiency in

vely produce

architectura

k on is done

also have the

nd fulfillmen

Could your

ned Senior /

o an

y two

y five

(AIA)

ng in

nies,

ner. I

torey

ment

to &

and

e

d

d

d

g

s,

n

ct

n

e

al

e

e

nt

r

/

A

f

2002

Con

of tw

Cag

serv

Con

extra

loca

Doc

spec

samp

orde

In-c

mate

Prov

cons

inclu

bein

As you can

member of y

“proven ski

interview to

forward to o

Yours Sincer

Zoilo Eric A

2. In additi

nstruction Ma

wo condomin

gayan de Oro

ve as Plannin

nceptualized

action from

ation, histori

cumentation;

cifications su

ples, constru

ers.

charge of to

erials and c

viding techn

struction pha

ude proper

ng followed in

see from my

your team a

ills” are bes

o discuss the

our future co

rely,

A. Geniblazo

ion to the r

anager for th

nium building

o City and 16

ng & Project

design and

client all rel

ic and cultu

prepare a

uitable for t

uction metho

otal project

components,

ical design s

ases of deve

scheduling a

n the project

y resume, I

and to work

st explained

e value I off

mmunication

recent proje

his projects.

gs in Mindan

6- Storey Bu

t Architect of

J

Project A

presentation

levant data n

ural influenc

and supervis

the project.

ods, and neg

Proj

implementa

selecting th

solutions to

lopment. Imp

and to ensur

t site.

take pride i

hard toward

in person,

ffer in your

n.

ect that I w

I was also r

nao, namely

uilding in Ge

f the 14-Store

Job Exposur

Architect / D

n from hand

needed for th

ces that may

se productio

Review of c

gotiation for

oject-in-Cha

ation; asses

e best const

any problem

plementation

re that all a

in my work,

d achieving

I welcome

company. T

was tasked to

recently invo

: 27-Storey P

neral Santos

ey ALPAP 2

re

Designer

d sketch to c

he project; fa

y influence

on of work

contractors b

claims on a

arge

the proper

truction tech

ms encounter

n of construc

architectural

too. It wou

of your com

the opportun

Thank you fo

o handle, I

olved in the p

Primetown P

s City. I was

Building in A

computerized

familiarizatio

upon the p

king drawing

bid, shop dr

additional an

r techniques

hnology for

red on site w

ction process

l design & s

ld be an ho

mpany goals

nity to intro

or reviewing

I also served

planning pro

Plaza Buildin

also assigne

Ayala, Alaba

d interpretat

on to the proj

project. Cont

gs, details,

rawings, pro

nd deductive

s of assemb

a given proj

with focus on

ses which w

specification

nor to be a

and objecti

oduce myself

g my resume

d as

ocess

ng in

ed to

ang.

tion;

jects

tract

and

oduct

e job

bling

oject;

n the

would

n are

contributing

ves. Because

f in a phone

e, and I look

g

e

e

k

_

Contact Add

Contact No.

E-mail:

Nationality:

Date of Birth

Civil Status:

Education:

Residence N

Passport No

Driving Lice

PRC No.:

AIA No.:

UPDA/MME

LinkedIn A

Archinect A

PRIMARY

j

dress:

:

h:

:

No.:

.:

ense:

E (Qatar):

Address:

Address:

Y WORKING

a. Well ver

b. Able to

c. High ap

d. Experien

architect

drawing

quantitie

Visualiz

end use

assignm

and othe

e. Ability

specifica

supervis

f. Proficien

g. Proficien

h. Knowled

i. Knowled

j. Knowled

in Qatar

Z

Flat

Zon

(+97

zega

Filip

Dec

Mar

Bac

(Far

270

P04

Qata

ARC

(Pro

Inte

Arch

Eng

http

http

G QUALIT

rse in Englis

adept and w

titude in com

nced in all p

tural workin

gs; expertise

es; assist in

zation; ability

er needs an

ments; familia

er discipline,

to perform

ation as ass

sion.

nt in adaptin

nt in Hand sk

dge on the p

dge on the F

dge on Glob

r (GSAS).

cvcCUR

ZOILO ER

t 48, Building

ne 15-Doha A

74) 5566485

architect@ya

pino

cember 05, 19

rried

helor of Scie

r Eastern Uni

60807784 (Q

10684B

ar

CHITECT #

ofessional Re

rnational As

hitect / Fire L

gineering & C

ps://www.lin

ps://archinec

TIES:

h.

orks well wi

mputer softw

phases of arc

ng drawing

e in constru

n developing

y to interpre

nd requirem

ar with build

develop pro

site projec

signed; abil

ng local / inte

ketch design

rocedures of

Fire Life Safe

al Sustainab

RRICULUM

of

RIC A. GE

g 18, Street 9

Al-Jadeeda, D

7 (mobile)

ahoo.com

970

ence in Arch

iversity, Man

Qatar)

13834

egulation Co

sociates (Mi

Life Safety #

Consulting O

nkedin.com

ct.com/peop

th other.

ware - fast lea

chitectural d

gs; develop

uction estim

g and prepa

et architectur

ents; compi

ding code re

oject design c

ct supervisio

lity to perfo

ernational bu

n and detailin

f Municipalit

ety evaluation

ility Assessm

M VITAE

ENIBLAZO

920,

Doha, Qatar

zega.jaf

itecture

nila, Philippi

mmission –

iddle East Ch

#1776 / Grad

Offices Accre

m/in/eric-gen

ple/cover/15

arning abilitie

designs, from

conceptual

mating; perfo

aring archite

ral design co

ile data and

equirements

criteria for va

on and site

orm variety

uilding codes

ng.

ty regulation

n of QCDD

ment System

O

**@*****.**

ines)

IAPOA)

hapter) - 304

de-A

editing Comm

niblazo-6b7

50321615/z

es and able to

m project pro

sketches i

orm design

ectural prese

oncepts and

d perform e

and standard

arious buildi

inspection

of task an

s & standards

ns & approval

& NFPA req

on Green Bu

om

465464

mittee

90b66/

zoilo-eric-ge

o learn by se

ogram defini

into legible

computation

entation dra

structure la

elementary

ds related to

ing design ty

and monito

nd work un

s.

ls.

quirements.

uilding

eniblazo

lf.

ition through

descriptive

ns / bill of

awings / 3D

ayouts as per

architectural

architecture

ypes.

oring; writes

nder general

h

e

f

D

r

l

e

s

l

COMPUTE

j

WORK EX

FAISAL SH

Office 3, 5F

Inclusive D

Designatio

Qatar Eng

Dut

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

ER SKILLS

a. Currentl

b. Knowled

Sketchu

c. Knowled

since 20

d. Good kn

e. Can con

f. Was trus

software

g. Can ope

h. Highly s

i. Good sk

j. Project s

XPERIENCE

HARAF EN

F, Al-Kuwa

Date: Novem

on: Senior A

gineering C

ties and Re

Make archit

proposed pr

detailed dra

Check and r

proceed wit

Handling ar

works on ar

Demonstra

managing t

Overseeing

final inspe

Demonstra

Demonstra

constructio

Handling m

Providing u

Demonstra

image.

Understand

team to en

Communic

Evaluating

3D Modelin

S:

ly using Auto

dge in 3D m

up Pro 2021.

dge in techni

010.

nowledge in

nvert AutoCA

sted by the S

e troubleshoo

erate printer,

skilled in Wi

kill in MS W

scheduling k

CES:

NGINEERI

ari Building

mber 1, 2022

Architect

Committee -

esponsibilit

tectural / inte

roject and de

awings and la

review the te

th the concep

rchitectural p

rea and space

ating workin

the works w

g the perfor

ctions, clos

ating knowl

ating experi

on field.

multiple Ins

updates to c

ating ability

ding, identi

sure works

cating effec

sustainability

ng and rende

oCAD 2014

modeling / ren

ical drawing

computer gr

AD drawing

System Admi

oting and sys

plotter and s

indows softw

Word, Excel an

knowledge in

ING

g, Al-Ghotah

2 to Present

- UPDA:

ies:

erior design /

evelop conce

ayouts.

echnical desc

ptual designs

project imple

e planning.

ng capabilit

within the p

rmance of th

e out and ha

edge in Arc

ence and ca

spections in

colleagues w

y to maintain

fying, and a

are not imp

tively, both

y projects fo

ering for pres

to AutoCAD

ndering using

gs review & d

raphics (such

into differen

in in ACAD

stem configu

scanner.

ware operatio

nd Powerpoi

n MS Project

h Street, Al-

t

Arc

/ landscaping

ptual drawin

cription of th

s and coordin

ementation, a

ties to repre

arameters e

he inspectio

andover).

chitectural w

apability in

parallel.

within the te

n a positive

assessing pr

pacted.

h in verbal a

or Global Sus

sentation.

D 2021.

g Autodesk R

documentatio

h as Coreldra

nt file formats

customizatio

uration in DO

on.

int.

s 2016.

-Sadd, Doh

chitect / Fire

g concept an

ngs into legib

he proposed s

nate with oth

architectural

sent the Co

established.

on team in te

works, proc

all aspects o

eam as well

client relat

roject risk a

and written c

stainability A

Revit Archite

on using BIM

aw X7 & Ado

s.

on of menus

OS, and Wind

a, Qatar

e Life Safety

nd design solu

ble descriptiv

site and area

her discipline

planning, de

mpliance In

esting and in

edures, and

of relevant

l as manage

tionship and

and sharing

communica

Assessment S

ecture 2021 a

M in Autodes

obe Photosho

, also

dows 10.

y (Grade-A

ution for eve

ve drawings a

requirement

s.

esigning and

nspection te

nspections

d standards.

discipline w

ement.

d profession

this with th

ation.

System (GSA

and

sk Revit

op 2022).

A) #1776

ery

and prepare

ts prior to

detailing,

eam and

(testing,

within the

nal firm

he wider

AS).

K

A

KEO INTE

P.O. Box 1

Inclusive D

Designatio

Qatar Eng

Dut

1.

2.

3.

4.

5.

6.

7.

8.

9.

ALTAWEE

1F, Buildin

Inclusive D

Designatio

Qatar Eng

Dut

1.

2.

3.

4.

5.

6.

7.

8.

9.

ERNATION

8108, Al-M

Date: June 1

on: Team Le

gineering C

ties and Re

Demonstrat

managing t

Overseeing

final inspec

Demonstrat

Demonstrat

constructio

Handling m

Providing u

Demonstrat

image.

Understand

team to ens

Communic

EL ENGINE

ng 102, Al-W

Date: Septem

on: Head of

gineering C

ties and Re

Coordinate

projects, in

approving d

Communic

to discuss a

Present des

explain rele

language.

Provide con

project dev

Assess pote

technology

Oversee rec

personnel a

teams.

Remain up-

technology

professiona

Innovate an

and enginee

Compile pr

NAL CONS

Mana Interse

5, 2021 to A

eader - Seni

Committee -

esponsibilit

ting workin

the works w

g the perform

ctions, close

ting knowle

ting experie

n field.

multiple Insp

updates to c

ting ability

ding, identif

sure works a

ating effect

NEERING C

Wakrah Roa

mber 15, 20

Architectur

Committee -

esponsibilit

and overse

ncluding dire

design chan

ate directly

and organize

sign proposa

evant detail

nsultations

velopment an

ential projec

y, design req

cruitment ef

as needed an

-to-date wit

y by reading

al developm

nd develop n

ering work

roject specif

ULTANTS

ection, C-Ri

August 16, 2

ior Architec

- UPDA:

ies:

ng capabiliti

within the pa

mance of th

e out and ha

edge in Arch

ence and cap

pections in p

colleagues w

to maintain

fying, and a

are not impa

tively, both

CONSULTA

ad, Al-Wakr

19 to April

re / Senior A

- UPDA:

ies:

ee all techni

ecting the d

nges.

with manag

e projects fr

als and bids

s, reports, e

and spearhe

nd bidding

cts for feasi

quirements,

fforts to sta

nd provide t

th current an

g industry pu

ment courses

new standar

as necessar

fications.

S

ing Road, D

2022

ct

Arc

ies to repres

arameters es

he inspection

andover).

hitectural w

pability in a

parallel.

within the te

n a positive

assessing pro

acted.

in verbal an

ANT

rah, Qatar

5, 2021

Architect (D

Arc

cal activitie

design team,

gers, produ

from origina

s to clients a

expense line

ead negotiat

phases.

ibility by re

governmen

ff project te

top-level m

nd trending

ublications,

s and events

rds, policies

ry to minimi

Doha, Qatar

chitect (Grad

sent the Com

stablished.

n team in te

works, proce

all aspects o

eam as well

client relati

oject risk an

nd written c

Design & Pr

chitect (Grad

es relating to

, reviewing

ction staff,

al conceptua

according to

e items, and

tions with p

searching a

ntal regulati

eams with a

management

elements o

manuals, a

s as time pe

s, and proce

ize costs an

de-A) #177

mpliance In

esting and in

edures, and

of relevant d

as managem

ionship and

nd sharing t

communicat

roject Super

de-A) #177

o architectu

drafts and c

marketing p

al design thr

o prescribed

d goals in cle

potential clie

nd analyzin

ons, and ma

architectural

for all desig

of design, co

and textbook

rmits.

edures for a

nd maximize

6

nspection tea

nspections (

standards.

discipline w

ment.

professiona

this with the

tion.

rvision)

6

ural and eng

computer m

personnel, a

rough const

d deadlines,

ear and pers

ents during

ng associate

arket deman

l and engine

gn and engi

onstruction,

ks and atten

architectural

e efficiency

am and

(testing,

within the

al firm

e wider

gineering

models, and

and clients

truction.

and

suasive

the

ed

nd.

eering

ineering

and

nding

l design

y.

D

10.

11.

12.

13.

SOUTH W

42F, Palm T

Inclusive D

Designatio

Qatar Eng

GSAS-Cer

Dut

1.

2.

3.

4.

5.

6.

7.

DAYLAMI

PO Box 52

Inclusive D

Designatio

Dut

1.

2.

3.

4.

5.

6.

7.

Ensure that

regulations

Make on si

Evaluating

3D Modelin

WEST ARCH

Tower B, W

Date: June 1

on: Senior A

gineering C

rtified Gree

ties and Re

Make archite

project and d

drawings an

Check and r

proceed with

Handling arc

works on are

Site Supervi

together with

and specifica

Evaluating s

3D Modelin

Perform all o

I CONSULT

39, Manam

Date: Octobe

on: Project &

ties and Re

Make archite

develop con

layouts.

Check and r

proceed with

Prepare com

site for cons

Handling arc

construction

Inspect site c

site with the

3D Modelin

Perform all o

t all works a

.

te visits to c

sustainabili

ng and rend

HITECTUR

West Bay, D

6, 2008 to F

Architect (D

Committee -

en Professio

esponsibilit

ectural / inte

develop conc

nd layouts.

review the tec

h the concep

chitectural p

ea and space

ision and ma

h the contrac

ations.

sustainability

ng and render

other duties

TING ENG

ma 321, King

er 19, 2006

& Design A

esponsibilit

ectural / inte

nceptual draw

review the tec

h the concep

mplete set of a

struction refe

chitectural p

n supervision

conditions pr

e designed pe

ng for present

other duties

are carried o

check on pr

ity projects

dering for pr

RE

Doha, Qatar

February 15

Design & Pro

- UPDA:

onal:

ies:

erior design /

ceptual draw

chnical descr

tual designs

roject implem

e planning.

anagement. M

ctor’s site en

y projects for

ring for prese

as assigned b

GINEERS

gdom of Ba

to June 13,

Architect / In

ies:

erior design c

wings into leg

chnical descr

tual designs

architectural

erence data an

lanning and

n, project mon

rior to start t

ermanent wor

tation.

as assigned b

out to specif

roject status

for Global

resentation.

5, 2019

oject Superv

Arc

CG

/ landscaping

wings into leg

ription of the

and coordin

mentation, ar

Monitor and c

ngineers base

r Global Sust

entation.

by the Depar

ahrain

2008

nterior Desi

concept and d

gible descrip

ription of the

and coordin

l working dra

nd informati

designing, w

nitoring and

the construct

rks.

by the Mana

fic standard

s and report

Sustainabil

vision) / Su

chitect (Grad

P Associate

g concept and

gible descript

e proposed si

ate with othe

rchitectural p

coordinate th

ed on the app

tainability A

rtment Head

igner / 3D V

design soluti

ptive drawing

e proposed si

ate with othe

awings, desig

on.

works on area

interior desi

tion activities

ging Directo

ds, building

on project.

lity Assessm

ustainability

de-A) #177

es (QA1435

d design solu

tive drawing

ite and area r

er disciplines

planning, des

he progress o

proved archit

Assessment Sy

and Presiden

Visualizer

ion for every

gs and prepar

ite and area r

er disciplines

gn details an

a and space p

igning.

s and verify t

or.

codes, guid

ment System

y Project Ma

6

5-001613)

ution for ever

gs and prepar

requirements

s.

signing and d

of the on-goin

ectural shop

ystem (GSA

nt.

y proposed pr

re detailed dr

requirements

s.

nd notes to be

planning, site

the compatib

delines and

m (GSAS).

anager

ry proposed

re detailed

s prior to

detailing,

ng project

drawings

S).

roject and

rawings and

s prior to

e submit on

e project

bility of the

E

E

EQUAL EN

PO Box 54

Inclusive D

Designatio

Visualizer

Dut

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

EMAAR EN

Manama 32

Inclusive D

Designatio

Dut

1.

2.

3.

NGINEERI

524, 183 Sa

Date: June 0

on: Project A

ties and Re

Make archite

and assist an

Prepare com

site for cons

Handling arc

construction

Check and r

Prepare desi

Assist the pr

space planni

drawing and

Perform tech

mocked-up s

Check and r

proceed with

Prepare bill

architectural

Site Supervi

together with

and specifica

Prepare arch

monitor dail

Prepare arch

prior to the c

Observe safe

ensure comp

Responsible

Perform all o

3D Modelin

ENGINEER

20, Kingdom

Date: Januar

on: Architec

ties and Re

Make archit

and evaluate

Assist the p

space plann

drawing and

Provides tec

inspection o

ING S.P.C.

almaniyah A

1, 2003 to S

Architect / A

esponsibilit

ectural / inte

nd evaluate w

mplete set of a

struction refe

chitectural p

n supervision

review archit

ign computat

rincipal archi

ing, site proj

d graphics pre

hnical review

samples subm

review the tec

h the concep

of materials

l design draw

ision and ma

h the contrac

ations.

hitectural pun

ly constructio

hitectural wo

completion o

fety practices

pliance with

e for all archi

other duties

ng for present

RING (Desig

m of Bahrai

ry 28, 2002

ct and Archi

esponsibilit

tectural desig

e work of sub

principal arc

ning, site pr

d graphics pre

chnical supp

f assigned pr

. (Value Ma

Avenue, Ma

September 2

Architectura

ies:

erior design c

work of subo

architectural

erence data an

lanning and

n, project mon

tectural shop

tions, compil

itect handlin

ect construct

esentation.

w work as as

mitted and p

chnical descr

tual designs

/ quantity ta

wings.

anagement. M

ctor’s site en

nch lists in re

on activities

ork snag-lists

of the constru

s and inspect

the documen

itectural finis

as assigned b

tation.

gn, Supervi

in

to May 200

itectural De

ies:

gn concept a

bordinate to

chitect handl

roject constr

esentation.

port in projec

rojects under

anagement)

anama 329,

2006

al Designer

concept and d

ordinate to m

l working dra

nd informati

designing, w

nitoring and

drawing sub

les data and

ng architectur

tion supervis

signed, revie

resented by t

ription of the

and coordin

akeoff / prepa

Monitor and c

ngineers base

elation with t

s of the contr

to be submi

uction.

the construc

nts and appro

shes of the pr

by the Mana

ision and P

03

esigner

and design s

meet the req

ling architec

ruction supe

ct conceptua

r implementa

) / Spectrum

Kingdom o

/ Interior D

design soluti

eet the requi

awings, desig

on.

works on area

interior desi

bmitted by th

perform elem

ral planning

sion, interior

ew and appro

the contracto

e proposed si

ate with othe

are architectu

coordinate th

ed on the app

the approved

ractor on site

itted to the co

ction of temp

oved shop dr

roject.

ging Directo

Project Man

olution from

quirements of

ctural plannin

ervision, in

alization, des

ation.

m Engineer

of Bahrain

Designer / Su

ion from a gi

irements of th

gn details an

a and space p

igning.

he contractor

mentary arch

and design, w

r designing a

ove architectu

or prior to ex

ite and area r

er disciplines

ural specifica

he progress o

proved archit

d architectura

.

ontractor’s si

porary and pe

rawings and m

or.

nagement)

m a given de

f the end-use

ng and desi

nterior desig

sign and coo

ring Consul

upervisor /

iven design p

he end-user.

nd notes to be

planning, site

.

hitectural assi

works on are

and architectu

ural material

xecution.

requirements

s.

ation based o

of the on-goin

ectural shop

al drawings a

ite engineer /

ermanent wo

material subm

sign problem

er;

gn, works o

gning and a

ordination, p

ltants

3D

problem

e submit on

e project

ignments.

ea and

ural

l samples /

s prior to

on

ng project

drawings

and to

/ architects

orks to

mittals.

m and assist

on area and

architectural

periodic site

BORLAND

3rd Floor, E

Inclusive D

Designatio

Dut

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

TRISTAN

1-B G/F Pa

Inclusive D

Designatio

Dut

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

D DEVELO

E & V Build

Date: Septem

on: Project A

ties and Re

Managing th

Provides tec

inspection o

Make archite

conceptual d

Review and

contractor;

Perform tech

mocked-up s

Check and r

proceed with

Prepare bill

architectural

Monitor and

engineers ba

Inspect site c

site with the

Observe safe

ensure comp

Perform oth

Y. CALIXT

atricia Bldg.

Date: Januar

on: Project A

ties and Re

Managing th

Provides tec

inspection o

Make archite

conceptual d

Review and

contractor;

Perform tech

mocked-up s

Check and r

proceed with

Monitor and

engineers ba

Inspect site c

site with the

Assist the pr

space planni

drawing and

Prepare arch

OPMENT C

ding, 1039 Q

mber 2001 t

Architect

esponsibilit

he constructi

chnical suppo

f assigned pr

ectural desig

drawings into

approve arch

hnical review

samples subm

review the tec

h the concep

of materials

l design draw

d coordinate t

ased on the a

conditions pr

e designed pe

fety practices

pliance with

er duties as a

TO & PART

., 1050 EDS

ry 1999 to M

Architect, C

esponsibilit

he constructi

chnical suppo

f assigned pr

ectural desig

drawings into

approve arch

hnical review

samples subm

review the tec

h the concep

d coordinate t

ased on the a

conditions pr

e designed pe

rincipal archi

ing, site proj

d graphics pre

hitectural pun

ORPORAT

Quirino High

o January 2

ies:

on (includes

ort in project

rojects under

gn concept an

o legible des

hitectural sh

w work as as

mitted and p

chnical descr

tual designs

/ quantity ta

wings;

the progress

approved arch

rior to start t

ermanent wor

s and inspect

the documen

assign by the

TNERS / PR

SA, Magalla

May 2001

Construction

ies:

on (includes

ort in project

rojects under

gn concept an

o legible des

hitectural sh

w work as as

mitted and p

chnical descr

tual designs

the progress

approved arch

rior to start t

ermanent wor

itect handlin

ject construc

esentation.

nch lists in re

TION

hway, Nova

25, 2002

scheduling,

t conceptuali

r implementa

nd design sol

criptive draw

op drawings

signed, revie

resented by t

ription of the

and coordin

akeoff / prepa

of the on-go

hitectural sho

the construct

rks;

the construc

nts and appro

e Operation M

ROJECT M

anes, Makat

n Managem

scheduling,

t conceptuali

r implementa

nd design sol

criptive draw

op drawings

signed, revie

resented by t

ription of the

and coordin

of the on-go

hitectural sho

the construct

rks;

ng architectur

ction supervi

elation with t

aliches, Que

estimating, e

zation, desig

ation;

lution for ev

wings and pr

for every pr

ew and appro

the contracto

e proposed si

ate with othe

are architectu

oing project t

op drawings

tion activities

ction of temp

oved shop dr

Manager.

MAKERS

ti City, M.M

ent-Project

estimating, e

zation, desig

ation;

lution for ev

wings and pr

for every pr

ew and appro

the contracto

e proposed si

ate with othe

oing project t

op drawings

tion activities

ral planning

sion, interio

the approved

ezon City, M

etc.)

gn and coord

ery proposed

epare detaile

roposed proje

ove architectu

or prior to ex

ite and area r

er disciplines

ural specifica

together with

and specific

s and verify t

porary and pe

rawings and m

M., Philippin

Officer, an

etc.)

gn and coord

ery proposed

epare detaile

roposed proje

ove architectu

or prior to ex

ite and area r

er disciplines

together with

and specific

s and verify t

and design, w

or designing

d architectura

M.M., Philip

dination, peri

d project and

ed drawings a

ect submitted

ural material

ecution;

requirements

s;

ation based o

h the contrac

ations;

the compatib

ermanent wo

material subm

nes

d Arch’l. D

dination, peri

d project and

ed drawings a

ect submitted

ural material

xecution;

requirements

s;

h the contrac

ations;

the compatib

works on are

and architect

al drawings a

ppines

odic site

d develop

and layouts;

d by the

l samples /

s prior to

on

ctor’s site

bility of the

orks to

mittals;

Designer

odic site

d develop

and layouts;

d by the

l samples /

s prior to

ctor’s site

bility of the

ea and

tural

and to

D

11.

12.

13.

14.

THE CSJ G

# 9724-B P

Inclusive D

Designatio

plotter & S

Dut

1.

2.

3.

4.

5.

6.

D.L. DAVI

#11 Parinas

Inclusive D

Designatio

Dut

1.

2.

3.

4.

5.

6.

monitor dail

Prepare arch

prior to the c

Observe safe

ensure comp

Responsible

Perform all o

GROUP, IN

Pililia St., Sa

Date: Decem

on: Project C

caled Mode

ties and Re

Attended sit

Provides te

inspection o

varying from

Prepare com

site for cons

Assist the P

space plann

drawing and

Handling ar

construction

Perform all o

ID & ASSO

s St., Bahay

Date: Januar

May 19

on: Asst. Pro

ties and Re

Supervised a

together wit

and specifica

Inspect site c

site with the

Provided ske

Prepare com

site for cons

Provides tec

inspection o

Perform all o

ly constructio

hitectural wo

completion o

fety practices

pliance with

e for all archi

other duties

NC.

antiago Vill

mber 1995 to

Coordinator

el Maker

esponsibilit

te coordinatio

chnical supp

of assigned p

m commercia

mplete set of

struction refe

Principal Arc

ning, site p

d graphics pre

rchitectural p

n supervision

other duties

OCIATES

y Toro, Que

ry 1992 to A

993 to Nove

oject Superv

esponsibilit

and evaluate

th the contra

ations;

conditions pr

e designed pe

etch drawing



Contact this candidate