I
I
f
A
Zoilo
Intl. Assoc.
Flat **, Build
+974-556648
zegarchitect@
Position App
Dear Sir / M
I am an arch
buildings, h
commercial
I am writing
energetic lea
and delivere
deadline, sp
from concep
drawings, tr
activities wit
the current
construction
detailing wit
My attention
accurately a
ability to tak
As an archit
stem directly
company us
Project Arch
A gr
expe
(22)
(25)
Mid
My p
Doh
serv
also
Gold
Corp
Asso
Eric A
. AIA, UAP,
ding 18, Street
57
@yahoo.com /
plied: EXPE
Madam:
hitect with va
ealth care, h
buildings.
g to express
ader with mo
ed the highe
ecification a
ptual design,
racking site
th clients, co
version Au
n design, doc
th experience
1. Architec
2. Sustaina
3. Researc
4. Cross-F
5. MEP &
6. Goal Se
7. Team Le
n to detail
and to the hig
ke an authori
tect, I learn
ly from work
se a result-o
hitect experie
raduate of B
erienced Arc
) years. I am
) years. And
ddle East Cha
present work
ha. I have al
ving as an Ar
o noted my re
den Link Sc
poration) &
ociates) with
A. Ge
, UPDA MM
t 920, Zone 15
zega_jafo@y
ERIENCED
arious projec
hospitality, i
s my interest
ore than 29
est professio
and elevated
, program d
activities a
onsultants, co
uto CAD sys
cuments spe
e in CAD sof
ctural, interio
ability
h & Develop
Functional Sk
Structural C
tting
eading
and excellen
ghest possibl
itative role w
through exp
king in one
oriented prob
enced in suc
Bachelor of
chitect, Arch
m practicing
d an Internati
apter, since J
k is in Qatar,
lso work for
rchitect, Arch
ecent experie
chool Buildi
7-storey Fil
h the aid of
eniblaz
ME, GSAS C
5-Doha Al-Jad
yahoo.com
ARCHITEC
cts and cons
institutional,
t in the Exp
years of exp
nal standard
quality leve
development,
and progress
ontractors &
stem, Autode
ecifications a
ftware. Areas
or, landscap
pment
kills / Proble
Coordination
nt problem-s
le standard.
when the situ
perience. Bec
’s passion,
blem solver
ccessfully com
Science in A
itectural Des
as Licensed
ional Associa
January 201
, serving as a
r six (6) yea
hitectural De
ence in the P
ng in Cama
lia Corporat
special Eng
zo
CGP
deeda, Doha,
CT
structions on
, landscapin
erienced Ar
perience as a
ds to ensure
ls. Demonstr
and design
s, provides t
& staff. Excel
esk Revit an
and schedule
s of Expertis
ing design &
m Solving Sk
n / Time Man
solving skill
I am comfor
uation arises.
cause I enjoy
I submit my
with a thirs
mpleting dive
Architecture
signer and A
d Architect (
ate Member
0.
a Senior Arc
rs in the Ki
esigner, Proj
Philippines w
arin 2, Calo
te Center in
gineering sof
Qatar
luxury hous
ng design, in
chitect posit
a Team leade
e the comple
rated ability
n drawing de
technical ov
llent work kn
nd engineer
es, with exce
se include:
& project sup
kills
agement
ls ensure tha
rtable workin
y my work a
y resume to
st for new c
erse commer
e at Far Eas
AutoCAD us
(UAP-IAPOA
of American
chitect from F
ingdom of B
ject Architec
was planning
oocan City (
Makati City
ftware such a
ses, housing
nterior desig
tion at your
er, and Seni
etion of larg
to lead the f
evelopments
versight and
nowledge of c
ring softwar
ellent unders
pervision
at every pro
ng as part of
and know tha
you for co
challenges?
rcial projects
stern Univer
er for more
A) for more
n Institute of
Faisal Shara
Bahrain for t
ct and an Inte
g and manag
(from Borlan
y (from Trist
as AutoCAD
development
gn works, res
firm, an inn
ior Architect
ge-scale proj
full life cycle
through to
coordinatio
computers, p
re to effectiv
standing of
oject I work
f a team but a
at success an
onsideration.
As a season
s, I bring as,
rsity and also
than twenty
than twenty
f Architects (A
af Engineerin
three compan
erior Design
ging the 2-St
nd Developm
tan Y. Calixt
D release 14
t, sustainable
sidential and
novative and
t. Established
jects meeting
e of projects
construction
on of projec
proficiency in
vely produce
architectura
k on is done
also have the
nd fulfillmen
Could your
ned Senior /
o an
y two
y five
(AIA)
ng in
nies,
ner. I
torey
ment
to &
and
e
d
d
d
g
s,
n
ct
n
e
al
e
e
nt
r
/
A
f
2002
Con
of tw
Cag
serv
Con
extra
loca
Doc
spec
samp
orde
In-c
mate
Prov
cons
inclu
bein
As you can
member of y
“proven ski
interview to
forward to o
Yours Sincer
Zoilo Eric A
2. In additi
nstruction Ma
wo condomin
gayan de Oro
ve as Plannin
nceptualized
action from
ation, histori
cumentation;
cifications su
ples, constru
ers.
charge of to
erials and c
viding techn
struction pha
ude proper
ng followed in
see from my
your team a
ills” are bes
o discuss the
our future co
rely,
A. Geniblazo
ion to the r
anager for th
nium building
o City and 16
ng & Project
design and
client all rel
ic and cultu
prepare a
uitable for t
uction metho
otal project
components,
ical design s
ases of deve
scheduling a
n the project
y resume, I
and to work
st explained
e value I off
mmunication
recent proje
his projects.
gs in Mindan
6- Storey Bu
t Architect of
J
Project A
presentation
levant data n
ural influenc
and supervis
the project.
ods, and neg
Proj
implementa
selecting th
solutions to
lopment. Imp
and to ensur
t site.
take pride i
hard toward
in person,
ffer in your
n.
ect that I w
I was also r
nao, namely
uilding in Ge
f the 14-Store
Job Exposur
Architect / D
n from hand
needed for th
ces that may
se productio
Review of c
gotiation for
oject-in-Cha
ation; asses
e best const
any problem
plementation
re that all a
in my work,
d achieving
I welcome
company. T
was tasked to
recently invo
: 27-Storey P
neral Santos
ey ALPAP 2
re
Designer
d sketch to c
he project; fa
y influence
on of work
contractors b
claims on a
arge
the proper
truction tech
ms encounter
n of construc
architectural
too. It wou
of your com
the opportun
Thank you fo
o handle, I
olved in the p
Primetown P
s City. I was
Building in A
computerized
familiarizatio
upon the p
king drawing
bid, shop dr
additional an
r techniques
hnology for
red on site w
ction process
l design & s
ld be an ho
mpany goals
nity to intro
or reviewing
I also served
planning pro
Plaza Buildin
also assigne
Ayala, Alaba
d interpretat
on to the proj
project. Cont
gs, details,
rawings, pro
nd deductive
s of assemb
a given proj
with focus on
ses which w
specification
nor to be a
and objecti
oduce myself
g my resume
d as
ocess
ng in
ed to
ang.
tion;
jects
tract
and
oduct
e job
bling
oject;
n the
would
n are
contributing
ves. Because
f in a phone
e, and I look
g
e
e
k
_
Contact Add
Contact No.
E-mail:
Nationality:
Date of Birth
Civil Status:
Education:
Residence N
Passport No
Driving Lice
PRC No.:
AIA No.:
UPDA/MME
LinkedIn A
Archinect A
PRIMARY
j
dress:
:
h:
:
No.:
.:
ense:
E (Qatar):
Address:
Address:
Y WORKING
a. Well ver
b. Able to
c. High ap
d. Experien
architect
drawing
quantitie
Visualiz
end use
assignm
and othe
e. Ability
specifica
supervis
f. Proficien
g. Proficien
h. Knowled
i. Knowled
j. Knowled
in Qatar
Z
Flat
Zon
(+97
zega
Filip
Dec
Mar
Bac
(Far
270
P04
Qata
ARC
(Pro
Inte
Arch
Eng
http
http
G QUALIT
rse in Englis
adept and w
titude in com
nced in all p
tural workin
gs; expertise
es; assist in
zation; ability
er needs an
ments; familia
er discipline,
to perform
ation as ass
sion.
nt in adaptin
nt in Hand sk
dge on the p
dge on the F
dge on Glob
r (GSAS).
cvcCUR
ZOILO ER
t 48, Building
ne 15-Doha A
74) 5566485
architect@ya
pino
cember 05, 19
rried
helor of Scie
r Eastern Uni
60807784 (Q
10684B
ar
CHITECT #
ofessional Re
rnational As
hitect / Fire L
gineering & C
ps://www.lin
ps://archinec
TIES:
h.
orks well wi
mputer softw
phases of arc
ng drawing
e in constru
n developing
y to interpre
nd requirem
ar with build
develop pro
site projec
signed; abil
ng local / inte
ketch design
rocedures of
Fire Life Safe
al Sustainab
RRICULUM
of
RIC A. GE
g 18, Street 9
Al-Jadeeda, D
7 (mobile)
ahoo.com
970
ence in Arch
iversity, Man
Qatar)
13834
egulation Co
sociates (Mi
Life Safety #
Consulting O
nkedin.com
ct.com/peop
th other.
ware - fast lea
chitectural d
gs; develop
uction estim
g and prepa
et architectur
ents; compi
ding code re
oject design c
ct supervisio
lity to perfo
ernational bu
n and detailin
f Municipalit
ety evaluation
ility Assessm
M VITAE
ENIBLAZO
920,
Doha, Qatar
zega.jaf
itecture
nila, Philippi
mmission –
iddle East Ch
#1776 / Grad
Offices Accre
m/in/eric-gen
ple/cover/15
arning abilitie
designs, from
conceptual
mating; perfo
aring archite
ral design co
ile data and
equirements
criteria for va
on and site
orm variety
uilding codes
ng.
ty regulation
n of QCDD
ment System
O
**@*****.**
ines)
IAPOA)
hapter) - 304
de-A
editing Comm
niblazo-6b7
50321615/z
es and able to
m project pro
sketches i
orm design
ectural prese
oncepts and
d perform e
and standard
arious buildi
inspection
of task an
s & standards
ns & approval
& NFPA req
on Green Bu
om
465464
mittee
90b66/
zoilo-eric-ge
o learn by se
ogram defini
into legible
computation
entation dra
structure la
elementary
ds related to
ing design ty
and monito
nd work un
s.
ls.
quirements.
uilding
eniblazo
lf.
ition through
descriptive
ns / bill of
awings / 3D
ayouts as per
architectural
architecture
ypes.
oring; writes
nder general
h
e
f
D
r
l
e
s
l
COMPUTE
j
WORK EX
FAISAL SH
Office 3, 5F
Inclusive D
Designatio
Qatar Eng
Dut
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
ER SKILLS
a. Currentl
b. Knowled
Sketchu
c. Knowled
since 20
d. Good kn
e. Can con
f. Was trus
software
g. Can ope
h. Highly s
i. Good sk
j. Project s
XPERIENCE
HARAF EN
F, Al-Kuwa
Date: Novem
on: Senior A
gineering C
ties and Re
Make archit
proposed pr
detailed dra
Check and r
proceed wit
Handling ar
works on ar
Demonstra
managing t
Overseeing
final inspe
Demonstra
Demonstra
constructio
Handling m
Providing u
Demonstra
image.
Understand
team to en
Communic
Evaluating
3D Modelin
S:
ly using Auto
dge in 3D m
up Pro 2021.
dge in techni
010.
nowledge in
nvert AutoCA
sted by the S
e troubleshoo
erate printer,
skilled in Wi
kill in MS W
scheduling k
CES:
NGINEERI
ari Building
mber 1, 2022
Architect
Committee -
esponsibilit
tectural / inte
roject and de
awings and la
review the te
th the concep
rchitectural p
rea and space
ating workin
the works w
g the perfor
ctions, clos
ating knowl
ating experi
on field.
multiple Ins
updates to c
ating ability
ding, identi
sure works
cating effec
sustainability
ng and rende
oCAD 2014
modeling / ren
ical drawing
computer gr
AD drawing
System Admi
oting and sys
plotter and s
indows softw
Word, Excel an
knowledge in
ING
g, Al-Ghotah
2 to Present
- UPDA:
ies:
erior design /
evelop conce
ayouts.
echnical desc
ptual designs
project imple
e planning.
ng capabilit
within the p
rmance of th
e out and ha
edge in Arc
ence and ca
spections in
colleagues w
y to maintain
fying, and a
are not imp
tively, both
y projects fo
ering for pres
to AutoCAD
ndering using
gs review & d
raphics (such
into differen
in in ACAD
stem configu
scanner.
ware operatio
nd Powerpoi
n MS Project
h Street, Al-
t
Arc
/ landscaping
ptual drawin
cription of th
s and coordin
ementation, a
ties to repre
arameters e
he inspectio
andover).
chitectural w
apability in
parallel.
within the te
n a positive
assessing pr
pacted.
h in verbal a
or Global Sus
sentation.
D 2021.
g Autodesk R
documentatio
h as Coreldra
nt file formats
customizatio
uration in DO
on.
int.
s 2016.
-Sadd, Doh
chitect / Fire
g concept an
ngs into legib
he proposed s
nate with oth
architectural
sent the Co
established.
on team in te
works, proc
all aspects o
eam as well
client relat
roject risk a
and written c
stainability A
Revit Archite
on using BIM
aw X7 & Ado
s.
on of menus
OS, and Wind
a, Qatar
e Life Safety
nd design solu
ble descriptiv
site and area
her discipline
planning, de
mpliance In
esting and in
edures, and
of relevant
l as manage
tionship and
and sharing
communica
Assessment S
ecture 2021 a
M in Autodes
obe Photosho
, also
dows 10.
y (Grade-A
ution for eve
ve drawings a
requirement
s.
esigning and
nspection te
nspections
d standards.
discipline w
ement.
d profession
this with th
ation.
System (GSA
and
sk Revit
op 2022).
A) #1776
ery
and prepare
ts prior to
detailing,
eam and
(testing,
within the
nal firm
he wider
AS).
K
A
KEO INTE
P.O. Box 1
Inclusive D
Designatio
Qatar Eng
Dut
1.
2.
3.
4.
5.
6.
7.
8.
9.
ALTAWEE
1F, Buildin
Inclusive D
Designatio
Qatar Eng
Dut
1.
2.
3.
4.
5.
6.
7.
8.
9.
ERNATION
8108, Al-M
Date: June 1
on: Team Le
gineering C
ties and Re
Demonstrat
managing t
Overseeing
final inspec
Demonstrat
Demonstrat
constructio
Handling m
Providing u
Demonstrat
image.
Understand
team to ens
Communic
EL ENGINE
ng 102, Al-W
Date: Septem
on: Head of
gineering C
ties and Re
Coordinate
projects, in
approving d
Communic
to discuss a
Present des
explain rele
language.
Provide con
project dev
Assess pote
technology
Oversee rec
personnel a
teams.
Remain up-
technology
professiona
Innovate an
and enginee
Compile pr
NAL CONS
Mana Interse
5, 2021 to A
eader - Seni
Committee -
esponsibilit
ting workin
the works w
g the perform
ctions, close
ting knowle
ting experie
n field.
multiple Insp
updates to c
ting ability
ding, identif
sure works a
ating effect
NEERING C
Wakrah Roa
mber 15, 20
Architectur
Committee -
esponsibilit
and overse
ncluding dire
design chan
ate directly
and organize
sign proposa
evant detail
nsultations
velopment an
ential projec
y, design req
cruitment ef
as needed an
-to-date wit
y by reading
al developm
nd develop n
ering work
roject specif
ULTANTS
ection, C-Ri
August 16, 2
ior Architec
- UPDA:
ies:
ng capabiliti
within the pa
mance of th
e out and ha
edge in Arch
ence and cap
pections in p
colleagues w
to maintain
fying, and a
are not impa
tively, both
CONSULTA
ad, Al-Wakr
19 to April
re / Senior A
- UPDA:
ies:
ee all techni
ecting the d
nges.
with manag
e projects fr
als and bids
s, reports, e
and spearhe
nd bidding
cts for feasi
quirements,
fforts to sta
nd provide t
th current an
g industry pu
ment courses
new standar
as necessar
fications.
S
ing Road, D
2022
ct
Arc
ies to repres
arameters es
he inspection
andover).
hitectural w
pability in a
parallel.
within the te
n a positive
assessing pro
acted.
in verbal an
ANT
rah, Qatar
5, 2021
Architect (D
Arc
cal activitie
design team,
gers, produ
from origina
s to clients a
expense line
ead negotiat
phases.
ibility by re
governmen
ff project te
top-level m
nd trending
ublications,
s and events
rds, policies
ry to minimi
Doha, Qatar
chitect (Grad
sent the Com
stablished.
n team in te
works, proce
all aspects o
eam as well
client relati
oject risk an
nd written c
Design & Pr
chitect (Grad
es relating to
, reviewing
ction staff,
al conceptua
according to
e items, and
tions with p
searching a
ntal regulati
eams with a
management
elements o
manuals, a
s as time pe
s, and proce
ize costs an
de-A) #177
mpliance In
esting and in
edures, and
of relevant d
as managem
ionship and
nd sharing t
communicat
roject Super
de-A) #177
o architectu
drafts and c
marketing p
al design thr
o prescribed
d goals in cle
potential clie
nd analyzin
ons, and ma
architectural
for all desig
of design, co
and textbook
rmits.
edures for a
nd maximize
6
nspection tea
nspections (
standards.
discipline w
ment.
professiona
this with the
tion.
rvision)
6
ural and eng
computer m
personnel, a
rough const
d deadlines,
ear and pers
ents during
ng associate
arket deman
l and engine
gn and engi
onstruction,
ks and atten
architectural
e efficiency
am and
(testing,
within the
al firm
e wider
gineering
models, and
and clients
truction.
and
suasive
the
ed
nd.
eering
ineering
and
nding
l design
y.
D
10.
11.
12.
13.
SOUTH W
42F, Palm T
Inclusive D
Designatio
Qatar Eng
GSAS-Cer
Dut
1.
2.
3.
4.
5.
6.
7.
DAYLAMI
PO Box 52
Inclusive D
Designatio
Dut
1.
2.
3.
4.
5.
6.
7.
Ensure that
regulations
Make on si
Evaluating
3D Modelin
WEST ARCH
Tower B, W
Date: June 1
on: Senior A
gineering C
rtified Gree
ties and Re
Make archite
project and d
drawings an
Check and r
proceed with
Handling arc
works on are
Site Supervi
together with
and specifica
Evaluating s
3D Modelin
Perform all o
I CONSULT
39, Manam
Date: Octobe
on: Project &
ties and Re
Make archite
develop con
layouts.
Check and r
proceed with
Prepare com
site for cons
Handling arc
construction
Inspect site c
site with the
3D Modelin
Perform all o
t all works a
.
te visits to c
sustainabili
ng and rend
HITECTUR
West Bay, D
6, 2008 to F
Architect (D
Committee -
en Professio
esponsibilit
ectural / inte
develop conc
nd layouts.
review the tec
h the concep
chitectural p
ea and space
ision and ma
h the contrac
ations.
sustainability
ng and render
other duties
TING ENG
ma 321, King
er 19, 2006
& Design A
esponsibilit
ectural / inte
nceptual draw
review the tec
h the concep
mplete set of a
struction refe
chitectural p
n supervision
conditions pr
e designed pe
ng for present
other duties
are carried o
check on pr
ity projects
dering for pr
RE
Doha, Qatar
February 15
Design & Pro
- UPDA:
onal:
ies:
erior design /
ceptual draw
chnical descr
tual designs
roject implem
e planning.
anagement. M
ctor’s site en
y projects for
ring for prese
as assigned b
GINEERS
gdom of Ba
to June 13,
Architect / In
ies:
erior design c
wings into leg
chnical descr
tual designs
architectural
erence data an
lanning and
n, project mon
rior to start t
ermanent wor
tation.
as assigned b
out to specif
roject status
for Global
resentation.
5, 2019
oject Superv
Arc
CG
/ landscaping
wings into leg
ription of the
and coordin
mentation, ar
Monitor and c
ngineers base
r Global Sust
entation.
by the Depar
ahrain
2008
nterior Desi
concept and d
gible descrip
ription of the
and coordin
l working dra
nd informati
designing, w
nitoring and
the construct
rks.
by the Mana
fic standard
s and report
Sustainabil
vision) / Su
chitect (Grad
P Associate
g concept and
gible descript
e proposed si
ate with othe
rchitectural p
coordinate th
ed on the app
tainability A
rtment Head
igner / 3D V
design soluti
ptive drawing
e proposed si
ate with othe
awings, desig
on.
works on area
interior desi
tion activities
ging Directo
ds, building
on project.
lity Assessm
ustainability
de-A) #177
es (QA1435
d design solu
tive drawing
ite and area r
er disciplines
planning, des
he progress o
proved archit
Assessment Sy
and Presiden
Visualizer
ion for every
gs and prepar
ite and area r
er disciplines
gn details an
a and space p
igning.
s and verify t
or.
codes, guid
ment System
y Project Ma
6
5-001613)
ution for ever
gs and prepar
requirements
s.
signing and d
of the on-goin
ectural shop
ystem (GSA
nt.
y proposed pr
re detailed dr
requirements
s.
nd notes to be
planning, site
the compatib
delines and
m (GSAS).
anager
ry proposed
re detailed
s prior to
detailing,
ng project
drawings
S).
roject and
rawings and
s prior to
e submit on
e project
bility of the
E
E
EQUAL EN
PO Box 54
Inclusive D
Designatio
Visualizer
Dut
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
EMAAR EN
Manama 32
Inclusive D
Designatio
Dut
1.
2.
3.
NGINEERI
524, 183 Sa
Date: June 0
on: Project A
ties and Re
Make archite
and assist an
Prepare com
site for cons
Handling arc
construction
Check and r
Prepare desi
Assist the pr
space planni
drawing and
Perform tech
mocked-up s
Check and r
proceed with
Prepare bill
architectural
Site Supervi
together with
and specifica
Prepare arch
monitor dail
Prepare arch
prior to the c
Observe safe
ensure comp
Responsible
Perform all o
3D Modelin
ENGINEER
20, Kingdom
Date: Januar
on: Architec
ties and Re
Make archit
and evaluate
Assist the p
space plann
drawing and
Provides tec
inspection o
ING S.P.C.
almaniyah A
1, 2003 to S
Architect / A
esponsibilit
ectural / inte
nd evaluate w
mplete set of a
struction refe
chitectural p
n supervision
review archit
ign computat
rincipal archi
ing, site proj
d graphics pre
hnical review
samples subm
review the tec
h the concep
of materials
l design draw
ision and ma
h the contrac
ations.
hitectural pun
ly constructio
hitectural wo
completion o
fety practices
pliance with
e for all archi
other duties
ng for present
RING (Desig
m of Bahrai
ry 28, 2002
ct and Archi
esponsibilit
tectural desig
e work of sub
principal arc
ning, site pr
d graphics pre
chnical supp
f assigned pr
. (Value Ma
Avenue, Ma
September 2
Architectura
ies:
erior design c
work of subo
architectural
erence data an
lanning and
n, project mon
tectural shop
tions, compil
itect handlin
ect construct
esentation.
w work as as
mitted and p
chnical descr
tual designs
/ quantity ta
wings.
anagement. M
ctor’s site en
nch lists in re
on activities
ork snag-lists
of the constru
s and inspect
the documen
itectural finis
as assigned b
tation.
gn, Supervi
in
to May 200
itectural De
ies:
gn concept a
bordinate to
chitect handl
roject constr
esentation.
port in projec
rojects under
anagement)
anama 329,
2006
al Designer
concept and d
ordinate to m
l working dra
nd informati
designing, w
nitoring and
drawing sub
les data and
ng architectur
tion supervis
signed, revie
resented by t
ription of the
and coordin
akeoff / prepa
Monitor and c
ngineers base
elation with t
s of the contr
to be submi
uction.
the construc
nts and appro
shes of the pr
by the Mana
ision and P
03
esigner
and design s
meet the req
ling architec
ruction supe
ct conceptua
r implementa
) / Spectrum
Kingdom o
/ Interior D
design soluti
eet the requi
awings, desig
on.
works on area
interior desi
bmitted by th
perform elem
ral planning
sion, interior
ew and appro
the contracto
e proposed si
ate with othe
are architectu
coordinate th
ed on the app
the approved
ractor on site
itted to the co
ction of temp
oved shop dr
roject.
ging Directo
Project Man
olution from
quirements of
ctural plannin
ervision, in
alization, des
ation.
m Engineer
of Bahrain
Designer / Su
ion from a gi
irements of th
gn details an
a and space p
igning.
he contractor
mentary arch
and design, w
r designing a
ove architectu
or prior to ex
ite and area r
er disciplines
ural specifica
he progress o
proved archit
d architectura
.
ontractor’s si
porary and pe
rawings and m
or.
nagement)
m a given de
f the end-use
ng and desi
nterior desig
sign and coo
ring Consul
upervisor /
iven design p
he end-user.
nd notes to be
planning, site
.
hitectural assi
works on are
and architectu
ural material
xecution.
requirements
s.
ation based o
of the on-goin
ectural shop
al drawings a
ite engineer /
ermanent wo
material subm
sign problem
er;
gn, works o
gning and a
ordination, p
ltants
3D
problem
e submit on
e project
ignments.
ea and
ural
l samples /
s prior to
on
ng project
drawings
and to
/ architects
orks to
mittals.
m and assist
on area and
architectural
periodic site
BORLAND
3rd Floor, E
Inclusive D
Designatio
Dut
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
TRISTAN
1-B G/F Pa
Inclusive D
Designatio
Dut
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
D DEVELO
E & V Build
Date: Septem
on: Project A
ties and Re
Managing th
Provides tec
inspection o
Make archite
conceptual d
Review and
contractor;
Perform tech
mocked-up s
Check and r
proceed with
Prepare bill
architectural
Monitor and
engineers ba
Inspect site c
site with the
Observe safe
ensure comp
Perform oth
Y. CALIXT
atricia Bldg.
Date: Januar
on: Project A
ties and Re
Managing th
Provides tec
inspection o
Make archite
conceptual d
Review and
contractor;
Perform tech
mocked-up s
Check and r
proceed with
Monitor and
engineers ba
Inspect site c
site with the
Assist the pr
space planni
drawing and
Prepare arch
OPMENT C
ding, 1039 Q
mber 2001 t
Architect
esponsibilit
he constructi
chnical suppo
f assigned pr
ectural desig
drawings into
approve arch
hnical review
samples subm
review the tec
h the concep
of materials
l design draw
d coordinate t
ased on the a
conditions pr
e designed pe
fety practices
pliance with
er duties as a
TO & PART
., 1050 EDS
ry 1999 to M
Architect, C
esponsibilit
he constructi
chnical suppo
f assigned pr
ectural desig
drawings into
approve arch
hnical review
samples subm
review the tec
h the concep
d coordinate t
ased on the a
conditions pr
e designed pe
rincipal archi
ing, site proj
d graphics pre
hitectural pun
ORPORAT
Quirino High
o January 2
ies:
on (includes
ort in project
rojects under
gn concept an
o legible des
hitectural sh
w work as as
mitted and p
chnical descr
tual designs
/ quantity ta
wings;
the progress
approved arch
rior to start t
ermanent wor
s and inspect
the documen
assign by the
TNERS / PR
SA, Magalla
May 2001
Construction
ies:
on (includes
ort in project
rojects under
gn concept an
o legible des
hitectural sh
w work as as
mitted and p
chnical descr
tual designs
the progress
approved arch
rior to start t
ermanent wor
itect handlin
ject construc
esentation.
nch lists in re
TION
hway, Nova
25, 2002
scheduling,
t conceptuali
r implementa
nd design sol
criptive draw
op drawings
signed, revie
resented by t
ription of the
and coordin
akeoff / prepa
of the on-go
hitectural sho
the construct
rks;
the construc
nts and appro
e Operation M
ROJECT M
anes, Makat
n Managem
scheduling,
t conceptuali
r implementa
nd design sol
criptive draw
op drawings
signed, revie
resented by t
ription of the
and coordin
of the on-go
hitectural sho
the construct
rks;
ng architectur
ction supervi
elation with t
aliches, Que
estimating, e
zation, desig
ation;
lution for ev
wings and pr
for every pr
ew and appro
the contracto
e proposed si
ate with othe
are architectu
oing project t
op drawings
tion activities
ction of temp
oved shop dr
Manager.
MAKERS
ti City, M.M
ent-Project
estimating, e
zation, desig
ation;
lution for ev
wings and pr
for every pr
ew and appro
the contracto
e proposed si
ate with othe
oing project t
op drawings
tion activities
ral planning
sion, interio
the approved
ezon City, M
etc.)
gn and coord
ery proposed
epare detaile
roposed proje
ove architectu
or prior to ex
ite and area r
er disciplines
ural specifica
together with
and specific
s and verify t
porary and pe
rawings and m
M., Philippin
Officer, an
etc.)
gn and coord
ery proposed
epare detaile
roposed proje
ove architectu
or prior to ex
ite and area r
er disciplines
together with
and specific
s and verify t
and design, w
or designing
d architectura
M.M., Philip
dination, peri
d project and
ed drawings a
ect submitted
ural material
ecution;
requirements
s;
ation based o
h the contrac
ations;
the compatib
ermanent wo
material subm
nes
d Arch’l. D
dination, peri
d project and
ed drawings a
ect submitted
ural material
xecution;
requirements
s;
h the contrac
ations;
the compatib
works on are
and architect
al drawings a
ppines
odic site
d develop
and layouts;
d by the
l samples /
s prior to
on
ctor’s site
bility of the
orks to
mittals;
Designer
odic site
d develop
and layouts;
d by the
l samples /
s prior to
ctor’s site
bility of the
ea and
tural
and to
D
11.
12.
13.
14.
THE CSJ G
# 9724-B P
Inclusive D
Designatio
plotter & S
Dut
1.
2.
3.
4.
5.
6.
D.L. DAVI
#11 Parinas
Inclusive D
Designatio
Dut
1.
2.
3.
4.
5.
6.
monitor dail
Prepare arch
prior to the c
Observe safe
ensure comp
Responsible
Perform all o
GROUP, IN
Pililia St., Sa
Date: Decem
on: Project C
caled Mode
ties and Re
Attended sit
Provides te
inspection o
varying from
Prepare com
site for cons
Assist the P
space plann
drawing and
Handling ar
construction
Perform all o
ID & ASSO
s St., Bahay
Date: Januar
May 19
on: Asst. Pro
ties and Re
Supervised a
together wit
and specifica
Inspect site c
site with the
Provided ske
Prepare com
site for cons
Provides tec
inspection o
Perform all o
ly constructio
hitectural wo
completion o
fety practices
pliance with
e for all archi
other duties
NC.
antiago Vill
mber 1995 to
Coordinator
el Maker
esponsibilit
te coordinatio
chnical supp
of assigned p
m commercia
mplete set of
struction refe
Principal Arc
ning, site p
d graphics pre
rchitectural p
n supervision
other duties
OCIATES
y Toro, Que
ry 1992 to A
993 to Nove
oject Superv
esponsibilit
and evaluate
th the contra
ations;
conditions pr
e designed pe
etch drawing