Post Job Free
Sign in

Residential Construction High School

Location:
Charlotte, NC
Salary:
30 hourly
Posted:
July 05, 2024

Contact this candidate

Resume:

NICHOLAS

MCNEILL

LEAD HANDYMAN

nicholasrmacneill@gmail

.com

910-***-****

Charlotte, NC 28213

Dedicated Construction Professional with over 20+ years of experience in commercial and residential construction; resolving problems and improving customers satisfaction. Skilled in working under pressure and adapting to new situations and challenges. Safely operates equipment and remains focused on task completion.

PROFESSIONAL SUMMARY

Self Employed - Construction Engineer/Foreman/Owner 01/2022 - Current

Home Pro Solution - Lead Foreman

05/2021 - 12/2021

WORK HISTORY

• Work independently in fast-paced environment

Complete carpentry work such as installing floors and building decks, replacing doors etc.

Design, construct and or renovate home improvements including but not limited to kitchens, bathrooms, living rooms and garages

Design and construct custom projects such as tables and cabinets

Install drywall, ceilings, trim and fabricate replacement trim and moldings.

Operate tools, equipment and machinery according to safety standards.

Complete framing, setting windows, siding and trim installation.

Set up and managed maintenance contracts with

customers.

Cut and installed insulation for residential and

commercial buildings

• Organized and delivered supplies for each job

SKILLS

• Bath/Shower Installation

• Flooring/Tiling

• Carpentry

• Safe Operation Procedures

• Masonry

• Painting/Drywall

• Home Remodeling

• Plumbing/Basic Electrical

• Residential Construction

• Customer Satisfaction

Counters/Cabinets

installation

Triton High School

Erwin, NC

High School Diploma

EDUCATION

McIntosh Box And Pallet - Third Shift Logistics Supervisor 02/2018 - 04/2021

David Allen Company - Lead Foreman

03/2010 - 01/2018

Used hand tools, power tools and equipment to complete skilled deck building

Fabricated custom furniture, shelving and cabinets and installed in specified locations.

Used brushes, rollers and spray guns to complete jobs with speed and accuracy.

Took measurements and studied floor sketches to

calculate area to be floored and amount of materials needed.

Operated hand tools and machines to cut material and achieve proper fit around obstructions.

Used power wet saws and tile cutters to cut tiles to specifications for projects..

Placed marble and tiles into place using spacers to achieve proper spacing for grout application.

Trained new staff on job duties, company policies and safety procedures for rapid onboarding.

Collaborated with other supervisors to maintain smooth inter-departmental communication and operations.

Processed orders by due dates to enable on-time delivery to customers

• Oversaw, motivated, Led and trained 20 employees Loaded, unloaded and moved material to and from

storage and production areas.

Assisted with successful, time-sensitive renovations of various structures.

Installed, renovated, polished and grind new floors

(concrete, wood, terazzoo) and replaced worn

components to bring buildings up to current codes.



Contact this candidate