Page
Curriculum Vitae
Nadeem Javed
Kotly Gujran Kot Nainan Narowal, PAKISTAN
***********@****.*** / ***********@******.***
GENERAL PROFILE
I have over Twenty Two (22) years of experience comprises on Projects as Senior Quantity Surveyor & Estimator for Civil Projects. (Including 15 years) International in Infrastructures, Oil and Gas Refineries, Power Plants, Culvert and Bridges, Asphalt & Concrete Roads, Commercial & Residential Buildings, Building Complex and Tower Projects etc. I have a vision to become a motivating team member to help, create and maintain company objectives. EMPLOYMENT HISTORY
AL-HASSAN ENGINEERING COMPANY SAOG DEC-2014 TO Nov-2023 OMAN
CONTRACTING CONSTRUCTION ENTERPRISES OCT-2010 TO AUG-2014 SAUDI ARABIA
AL-HASSAN ENGINEERING COMPANY SAOG NOV-2007 TO JULY-2010 OMAN
ALLIED ENGINEERING CONSULTANT PVT LTD DEC-2005 TO SEP-2007 PAKISTAN
MEM BAU GMBH KTML SEP-2003 TO JULY-2005 PAKISTAN
HABIB RAFIQ CONSTRUCTION COMPANY JULY-2001 TO FEB-2003 PAKISTAN PROJECTS HISTORY
SR # PROJECT CLIENT COUNTRY POSITION DURATION
PROJECT
COST
1
SRIP (OMAN OIL & GAS)
/ RHPP (PDO)
ORPIC / PDO OMAN
SENIOR
QUANTITY
SURVEYOR for
CIVIL PROJECTS
AUG-2016 TO
NOV-2023
DEC-2014 TO
JUL-2016
68 + 18
MILLION
USD / 52.4
MILLION
OMR
2 JERP (OIL & GAS)
TECNIP &
SATORP /
ARAMCO
SAUDI
ARABIA
SENIOR
QUANTITY
SURVEYOR for
CIVIL PROJECTS
OCT-2010 TO
AUG-2014
79.40
MILLION
USD
3
SARP (OMAN OIL &
GAS)
ORPIC - Oman OIL
REFINERIES &
PETROLEUM
INDUSTRIES Co.
OMAN
QUANTITY
SURVEYOR
(CIVIL)
NOV-2007 TO
JUL-2010
47.90
MILLION
USD
4
SAID SEGAL CARDIAC
COMPLEX / ALLIED
ENGINEERING CO.
KOHINOOR
TEXTILE
PAKISTAN
RESIDENT
ENGINEER
DEC-2005 TO
SEP-2007
220
MILLION
PAK RS.
5
COAL GRINDING &
FIRING PLANT
SAUJI CEMENT /
ASKARI CEMENT
PAKISTAN SITE ENGINEER
SEP-2003 TO
JUL-2005
55 + 55
MILLION
USD
6
FAUJI FOUNDATION
MEDICAL COLLEGE
RAWALPINDI
FAUJI
FOUNDATION
PAKISTAN
CIVIL
SUPERVISOR
JUL-2001 TO
FEB-2003
500
MILLION
PAK RS.
BRIEF OF PROJECT BASED JOB RESPONSIBILITIES
Page
2
Leading a team of Technical and Non-Technical team members and keep coordination between themes.
Involving in Pre and Post Tendering work.
Studying the tender scope of work, Specifications, Drawings, Scope Matrix & BOQ Item description. Identifying the conflict items and raising the technical query.
Quantity calculating from Structural & Architectural drawings, preparing the BOQ and sending enquiry for quotations.
Studying the Contract document & BOQ line Items description identifying the Variation items and submitting the same for client approval. Identifying the extra item from IFC drawing and preparing the rate analysis and Submit to client for approval. Prepare the claims report.
Producing monthly cost & value report, Quarterly report and cash flow information.
Client R/A Bill & Final Bill preparing and submitting the same for certification.
Sub-Contractors Bill checking and quantity certifying for Payment.
Material procurement work and taking approval of the same from client.
Daily site visiting, taking the progress update along with photography and preparing the DPR.
Preparing the external and internal audit report and material reconciliation report.
Developing strong relationship with the client and sub-contractors.
For Planning and Scheduling help team members to carry out the tasks.
Estimation of resource (Manpower, Material & Equipment) requirement using productivity / consumable.
Co-ordination between project teams & clients, meeting with client personnel for periodical review.
Preparing plan, contracts, budgets, bill of quantities, and preparing PMS (Project measurement status) SUMMARY OF QUALIFICATION
B-Tech (Civil) – Preston University of Technology, PAKISTAN
Diploma (Civil) – G.C.T - Rasul (M. Bahauddin) PAKISTAN
Metric (Science)
COMPUTER SKILL
Engineering Software: Primavera (P6) & MS Project (Planning)
Microsoft Office – (Word, Excel & Power Point)
Auto-CAD (2D &3D)
CPMS (Construction Progress Measurement System)
PERSONAL INFORMATION
1. Name Nadeem Javed
2. Father’s Name Allah Ditta (Late)
3. Date of Birth 01/04/1980
4. Sex Male
5. Marital Status Married
6. Nationality Pakistan
7. Passport no. AX8676554
8. Date of Expire DEC, 19, 2023
License KSA no. 229-***-****
Language Known English, Arabic, Urdu, Punjabi, etc. Page
3
EMPLOYMENT RECORD
A) Al Hassan Engineering Co. S.A.O.G.
Position Held Senior Quantity Surveyor Civil
Period October-2014 to till Date
Location MUSCAT (OMAN)
Project # 01
Name of the Project Sohar Refinery Improvement Project. Client Oman Oil Refineries & Petroleum Industries Co, SAOC. Main Contractor Daelim Petrofac JV Project.
Project Cost 68 Million in USD (Contract) + 18 Million USD (Extra Works) / Completed Profile of duty performed: Analyzing BOQ items and preparing detailed measurement item wise from Civil and Architectural drawing. Identifying the non-BOQ items and Extra items, Preparation of rate analysis and submit the same for client approval. Identify the disputed items and coordinate between Tendering department and client contract department along with supporting document to shut out the problems. Prepare the variation report. Month wise submitting the Progress R/A Bill to Client and follow-up the same for certification. Sub-contractors Bill checking and verifying the quantity for payment. Working out the materials requirement of the project and raising the purchase requisition to procurement department. Preparations of Material reconciliations report. Provide activity wise quantity to Planning department for schedule making. Visit site to update the daily progress report. Prepare documents for claims. Time to time arrange meeting with client for finalization of rate for Extra item and Variation order. Performed and managed all civil & mechanical activities at SRIP project like, Secondary cooling water system 2 (SCWS2), Sea water desalination 2 (SWD2), Potable and service system 2 (PWS2), Fuel gas and natural gas system 2 (FG2), Flare system 2 (FLR2), Mixed crude oil tank T-8105 (A, B, C), Bund wall crude storage tanks, Clarifier tank (ME-8501-A-04-B), Treated water tank (ME-8501-T-12), DNF effluent tank (ME-8501-T-13), DNF effluent tank (ME-8501-A-05-A/B), Filter feed sump (ME-8501-T-23), Sludge clarifier SCUM tank (ME-8501-T-23), Desalinated water tank (T-4401-A/B), Secondary cooling water tank (T-7311), Desalinated water tank (T-7341- A/B), Demineralized water tank (T-7401-A/B), Suspect condensate tank (T-7402), Transformer 02TR101-A/B (unit-8800), Pipe sleeper and pipe support (unit-9900), Waste water treatment facilities 2 (WWT2), Sea water out fall (Z-7206), Suspected contaminated sea water impound basin (Z-7207), HCU, HGU2, ISOM, Underground facilities, Road works, Paving works, Landscaping works etc. Project # 02
Name of the Project RHPP & HRSG Power Plant Project (E.P.C) Client PDO – (Petroleum development of Oman)
Page
4
Main Contractor Al Hassan Engineering Co. S.A.O.G
Project Cost 52.40 Million in Omani Riyal / Completed Profile of duty performed: Analyzing BOQ items and preparing detailed measurement item wise from Civil and Architectural drawing. Identifying the non-BOQ items and Extra items, Preparation of rate analysis and submit the same for client approval. Identify the disputed items and coordinate between Tendering department and client contract department along with supporting document to shut out the problems. Prepare the variation report. Month wise submitting the Progress R/A Bill to Client and follow-up the same for certification. Sub-contractors Bill checking and verifying the quantity for payment. Working out the materials requirement of the project and raising the purchase requisition to procurement department. Preparations of Material reconciliations report. Provide activity wise quantity to Planning department for schedule making. Visit site to update the daily progress report. Prepare documents for claims. Time to time arrange meeting with client for finalization of rate for Extra item and Variation order. Performed and managed all civil & mechanical activities at RHPP project like, Unit electrical building (UEB) 2 nos., Station control building (SCB), Gas treatment plant building (GTP), Heat recovery stream generator building (HRSG), and foundation works like GT foundations, HRSG foundations, Fin fan cooler foundations, Water cooling pumps, Water cooling tower, Condensate system, Sleeper and pipe rack foundations, Utilities foundations, Closed cooling water system (CCWS), GT step up transformer foundations and Fire walls, Bypass stack foundations, Skid foundations, Vent stack foundations, 132 KV substation works, Electrical cable trenches, Instrument cable trenches, Underground piping works, U & V ditches, Paving works, Asphalt works, Fence & Gate installation works, Gravel finishing etc.
B) CCE (Contracting Construction Enterprises)
Position Held Senior Quantity Surveyor Civil
Period October 2010 to August-2014
Location SAUDI ARABIA (AL JUBAIL)
Project # 01
Name of the Project Jubail Export Refinery Project (JERP) Client TECNIP and SATORP (ARAMCO)
Project Cost 79.40 Million in USD (Completed)
Period October 2010 to June-2012
Project # 02
Name of the Project SADARA Project
Client TECHNIMONT - (Saudi Aramco Dow Arabia Chemical Project) Project Cost 24 Million in USD (Completed)
Period July 2012 to August-2014
Profile of duty performed: Analyzing BOQ items and preparing detailed measurement item wise & bar bending scheduled from Civil and Architectural IFC drawing. Identify the non-BOQ items and extra items, preparing rate analysis and submitting the same for client Page
5
approval. Prepare the claims report. Prepare and submitted the monthly Progress R/A Bill and Final Bill to Client and follow-up the same for certification. Sub-contractors Bill checking and verifying the quantity for payment. Submit material to client for approval. Raise material requisition for procurement, prepared material reconciliation report of different items, planning for monthly manpower and equipment requirement. Preparing the monthly sale and cost report, Quarterly & Yearly budget report, audit report and CTC report. For planning and scheduling help team members to carry out the tasks. Most importantly meeting with client for finalize the rate of extra items, variation order and Day Work Sheet.
Performed and managed all civil works like, Cooling Tower, Pipe Racks, Box Culvert, Retaining Wall, Bridges, Concrete Basins, Duct Banks, Pulling Pits, Cable Concrete Trenches, Concrete Ditches, Concrete Basins, UG Pressure Piping with Joints, Pits, Manholes and Catch basins, U/G Pressure Piping Installation & Testing (Fire Water GRP), U/G Pits Installation, U/G E&I Cable Ways & Conduits Installation, U/G Gravity Piping Installation, General Excavation and Road Embankment, Asphalt Roads & Yards, Concrete Paving & Yard, Control building, Team building, Generator and Chiller building, Maintenance Workshop, etc C) Al Hassan Engineering Co. S.A.O.G.
Name of the Project Sohar Aromatic Refinery Project Client ORPIC-SAOG – Oman / GS Korean Company
Location MUSCAT (OMAN)
Position Held Quantity Surveyor Civil
Period November 2007 to July 2010
Profile of duty performed: Analyzing BOQ items and prepare detailed measurement item wise and bar bending scheduled. Identify the non-BOQ items and extra items. Prepare monthly Client R/A Bill and follow-up the same for client certification. Sub-contractors Bill checking and certifying the same for payment, Prepare joint measurement report and survey report. Material reconciliations work for different items. Update daily and monthly progress report. D) Allied Engineering Consultant Pvt. Ltd
Location Lahore PAKISTAN
Position held Resident Engineer
Period December 2005 to September 2007
Project cost 200 Million – (Pakistani Rupees)
Client Kohinoor Textile
Project status Said Segal Cardiac Complex Gulab Davi Hospital Profile of duty performed: Drawing received from client and distribute to site engineer. Quantity calculating from received drawing. Raise material requisition site wise. Preparing client running and Final bill and follow up the same for client certification. Sub- contractors bill checking and certifying for payment. Prepare material reconciliation report. Prepare as built drawing. Update the daily and monthly progress report.
E) MEM BAU GMBH KTML
Location Taxila Wah Centt. (PAKISTAN)
Page
6
Position held Site Engineer
Period September 2003 to July 2005
Client Fauji Cement, Askari Cement
Name of the Project Coal Grinding and Firing Plant Projects Profile of duty performed:
Prepare client drawing with Auto-CAD application. Visiting to site and checking the construction work as per approved drawing, Problems solving and decision making, checking the sub-contractors running bill & final bill and certifying the same for payment. Prepare as built drawing. Update daily and monthly progress report. F) HABIB RAFIQ PVT LTD
Location Rawalpindi (PAKISTAN)
Position held Civil Supervisor
Period July 2001 to February 2003
Client Fuji Foundation
Name of the Project Fuji Foundation Medical College Rawalpindi Profile of duty performed:
Supervision of Civil Works like Foundations, Columns, Beams, and Slabs for the building construction works. Preparing the BBS and Supervision of Rebar’s as per IFC drawings. Visiting to site and checking the finishing works as per approved drawings, problems solving, in case find some serious issues at site must be discussed with lead engineer so that work not be affected due to any decision pending.
DECLARATION
I hereby declare that all the information furnished above is true to the best of my knowledge and belief. Place : Muscat (Oman)
Dated : 25/12/2023 Nadeem Javed
SQS & Estimator for Civil Projects