Post Job Free
Sign in

Inventory Control Material Coordinator

Location:
Coimbatore, Tamil Nadu, India
Posted:
May 20, 2024

Contact this candidate

Resume:

VENKATESAN.J Mob: +91-784*******/819*******

Materials Controller E-Mail: ad5trs@r.postjobfree.com

Professional Synopsis:

A dynamic professional with over 18 years of rich & extensive experience as a Material Coordinator/Controller in various projects and shutdowns in India and GCC.

Logistics & Warehouse discipline in Oil & Gas/Petrochemical’s projects i.e., EPC, EPCC, EPCM & Operations

Managed Warehouse sizes from 15000 Sq Feet to 200000 Sq feet

Executed Shipment Schedules& Inventory Control and led successfully on mega & short EPC/EPCC/EPCM Projects. Coordinating the logistical needs of Project’s Team

Review of Design packages and job scope to identify and list out the material requirement.

Liaise with Planning Engineer and supervisors to identify the priority listing and fixed targets such as shut down dates etc, to ensure the material movement in time

Prepare and submit the Material request note (MRNs) to Project engineers and coordinate with them for issues of Material issue pick lists and material issue authorizations.

Identify and advise the MTO summary discrepancy with respect to MTO listed and actual requirement to Supervisors and client project engineers. Supervise the Material handling departments/ Stores for the timely collection, transport, stacking/storage and issue of material and consumables. Track, register and reconcile the material receipt, issue and shortage and submit the returns to Planning, Supervisors and client material controllers.

Raise the Criticism of Material (COM) on client issued materials, if any, and arrange the corrective action/close out or replacement. Ensure the safe method and precautions during the handling and transportation of materials and also the safe storage of material.

Ensure the material identification and Inspection with Quality Control department, for the contractor supply material, to ensure the Quality and Specification of the material.

High integrity & energetic leader known for ability to envision and create successful teams with latest knowledge & modern skills in quality assurance and product development fields to deliver quality services to clients/customers.

Organizational Experience:

Company : Ragmet Engineers Pvt. Ltd, India– Shutdown Specialist. Job Position : Material Controller

Duration : Aug 2017 to Feb 2024

Project : Turnaround

Client : BPCL, HPCL, TATA & RCF

Job Description

Coordinate with security disciplines and ensure that maximum-security measures are provided to safeguard all materials and properties under custody of the Material Control Section.

Control all materials and equipment from the time of delivery thereof to a storage area until the issuance to subcontractor for fabrication or field installation. Maintain inventory record at all times.

Physically conduct periodic stocktaking on all materials held at warehouses/yards and update their inventory records accordingly.

Maintain and arrange all documents related to material control received from respective subcontractors such as acknowledged copy of construction material issue voucher, verified copy of construction material return voucher and all copies of approved request for approval of scrap.

Update all data of changes in piping materials due to the revisions of isometric drawing (ISO)/list of materials (LOM) and Field Change Sheet into the CMS/MARIAN. If there is any discrepancy between material requisition and the relevant ISO/ Field Changes, immediately consult with the Field Engineering Manager for remedial action.

VENKATESAN.J Mob: +91-784*******/819*******

Materials Controller E-Mail: ad5trs@r.postjobfree.com

Company : Emdad

Job Position : Material Coordinator

Duration : Dec 2016 – April 2017

Project : ADGAS Turnaround Shutdown Project 2016

Plant Owner : ADGAS

Review of Design packages and job scope to identify and list out the material requirement.

Liaise with Planning Engineer and supervisors to identify the priority listing and fixed targets such as shut down dates etc, to ensure the material movement in time

Prepare and submit the Material request note (MRNs) to Project engineers and coordinate with them for issues of Material issue pick lists and material issue authorizations. Identify and advise the MTO summary discrepancy with respect to MTO listed and actual requirement to Supervisors. Supervise the Material handling departments/ Stores for the timely collection, transport, stacking/storage and issue of material and consumables.

Ensure the safe method and precautions during the handling and transportation of materials and also the safe storage of material. Ensure the Purchase requisitions for the Consumables and Contractor supply material in time and follow up.

Ensure the material identification and Inspection with Quality Control department, for the contractor supply material, to ensure the Quality and Specification of the material. Company : Qcon, Qatar

Job Position : Material Coordinator

Duration : Feb 2015 – April 2015

Project : ADGAS Turnaround Shutdown Project 2015

Plant Owner : ADGAS

Job Description

Review of Design packages and job scope to identify and list out the material requirement.

Liaise with Planning Engineer and supervisors to identify the priority listing and fixed targets such as shut down dates etc, to ensure the material movement in time

Prepare and submit the Material request note (MRNs) to Project engineers and coordinate with them for issues of Material issue pick lists and material issue authorizations.

Identify and advise the MTO summary discrepancy with respect to MTO listed and actual requirement to Supervisors.

Supervise the Material handling departments/ Stores for the timely collection, transport, stacking/storage and issue of material and consumables.

Ensure the safe method and precautions during the handling and transportation of materials and also the safe storage of material.

Ensure the Purchase requisitions for the Consumables and Contractor supply material in time and follow up.

Ensure the material identification and Inspection with Quality Control department, for the contractor supply material, to ensure the Quality and Specification of the material.

VENKATESAN.J Mob: +91-784*******/819*******

Materials Controller E-Mail: ad5trs@r.postjobfree.com

Company : Majan Aluminium Services, Oman

Job Position : Material Controller

Duration : Dec 2012 to Dec 2013.

Project : Emirates Aluminium Smelter Cell Bus Fabrication and Sohar Aluminium Anode Stem Maintenance work.

Plant Owner : Emirates Aluminum/Sohar Aluminium

Review of Design packages and job scope to identify and list out the material requirement.

Liaise with Planning Engineer and supervisors to identify the priority listing and fixed targets such as shut down dates etc, to ensure the material movement in time

Prepare and submit the Material request note (MRNs) to client-material controllers/Project engineers and coordinate with them for issues of Material issue pick lists and material issue authorizations.

Identify and advise the MTO summary discrepancy with respect to MTO listed and actual requirement to Supervisors and client project engineers. Liaise with client central stores for organizing the material collection and transport. Supervise the Material handling departments/ Stores for the timely collection, transport, stacking/storage and issue of material and consumables.

Track, register and reconcile the material receipt, issue and shortage and submit the returns to Planning, Supervisors and client material controllers. Raise the Criticism of Material (COM) on client issued materials, if any, and arrange the corrective action/close out or replacement.

Ensure the safe method and precautions during the handling and transportation of materials and also the safe storage of material.

Ensure the Purchase requisitions for the Consumables and Contractor supply material in time and follow up.

Ensure the material identification and Inspection with Quality Control department, for the contractor supply material, to ensure the Quality and Specification of the material. Company : Ragmet Engineers Pvt. Ltd, India– Shutdown Specialist. Job Position : Material Controller

Duration : May 2010 to Nov 2012

Project : Turnaround

Client : BPCL, HPCL, TATA & RCF

Job Description

Coordinate with security disciplines and ensure that maximum-security measures are provided to safeguard all materials and properties under custody of the Material Control Section.

Control all materials and equipment from the time of delivery thereof to a storage area until the issuance to subcontractor for fabrication or field installation. Maintain inventory record at all times.

Physically conduct periodic stocktaking on all materials held at warehouses/yards and update their inventory records accordingly.

Maintain and arrange all documents related to material control received from respective subcontractors such as acknowledged copy of construction material issue voucher, verified copy of construction material return voucher and all copies of approved request for approval of scrap.

Update all data of changes in piping materials due to the revisions of isometric drawing (ISO)/list of materials (LOM) and Field Change Sheet into the CMS/MARIAN. If there is any discrepancy between material requisition and the relevant ISO/ Field Changes, immediately consult with the Field Engineering Manager for remedial action.

VENKATESAN.J Mob: +91-784*******/819*******

Materials Controller E-Mail: ad5trs@r.postjobfree.com

Company : Majan Aluminium Services, Oman

Job Position : Material Controller

Duration : April 2009 to April 2010.

Project : Emirates Aluminium Smelter Cell Bus Fabrication and Sohar Aluminium Anode Stem Maintenance work.

Plant Owner : Emirates Aluminium/Sohar Aluminium

Job Description

Review of Design packages and job scope to identify and list out the material requirement.

Liaise with Planning Engineer and supervisors to identify the priority listing and fixed targets such as shut down dates etc, to ensure the material movement in time

Prepare and submit the Material request note (MRNs) to client-material controllers/Project engineers and coordinate with them for issues of Material issue pick lists and material issue authorizations.

Identify and advise the MTO summary discrepancy with respect to MTO listed and actual requirement to Supervisors and client project engineers. Liaise with client central stores for organizing the material collection and transport. Supervise the Material handling departments/ Stores for the timely collection, transport, stacking/storage and issue of material and consumables.

Track, register and reconcile the material receipt, issue and shortage and submit the returns to Planning, Supervisors and client material controllers. Raise the Criticism of Material (COM) on client issued materials, if any, and arrange the corrective action/close out or replacement.

Ensure the safe method and precautions during the handling and transportation of materials and also the safe storage of material.

Ensure the Purchase requisitions for the Consumables and Contractor supply material in time and follow up.

Ensure the material identification and Inspection with Quality Control department, for the contractor supply material, to ensure the Quality and Specification of the material. Company : Venture Gulf - Oil And Gas Division, Qatar. Job Position : Material Controller

Duration : Sep 2006 to Sep 2008

Project : Dolphin Warehouse Management

Plant Owner : Dolphin Energy Ltd

Job Description

Work in the Material Control Group as Material Controller, supervising the receipt and recording incoming deliveries of materials and equipment from various vendors.

Controlling and safekeeping of various documents from project specifications, drawings, site quality assurance manuals, project procedure manuals, inspection and test plans, method statements, sub- contractors submitted documents such as inspection and test plans, welding procedures specifications, material submittals for approvals.

Keeping correspondences, test and inspection reports. Preparation of quality documents for hand over to clients. Preparation of request for inspection to clients and compilation of inspection reports. VENKATESAN.J Mob: +91-784*******/819*******

Materials Controller E-Mail: ad5trs@r.postjobfree.com

Company : Al Muftah Contracting Co.WLL, Qatar

Job Position : Material Controller.

Duration : Nov 2004 to April 2006

Project : NGL II, Arab-D Gas Recycling plant, FNF, Fahil Main, North & QAFCO Shut Down Jobs

Plant Owner : Qatar Petroleum, Qatar Fertilizer Company Job Description

Set up and operations of the computerized materials control system for Construction Management System (CMS) General & Piping Material Control System.

Collecting essential information related material status and to distribute it the respective discipline once available i.e. Material status report, Bill of Materials, Non-available Materials Report, Materials Arrival Report.

Maintenance and Control of stock inventories and report to the Material Control Manager. Routine activities involve checking of content of approved “Construction Material Issue Voucher” prepared request by Subcontractor, Request for Field Purchase and Non-available Material Report.

Conduct periodic stocktaking on all categories of materials held at warehouse/storage yard and updates inventory records.

Supervision of the daily operation of warehouses and routine performances of the personnel from warehouse keepers to common workers in the material control group. Ensures there are no dangerous acts or safety negligence at places of work and all safety rules and regulations as are absolutely complied with.

Company : Ragmet Engineers Pvt. Ltd, India– Shutdown Specialist. Job Position : Material Controller.

Duration : Oct 1999 to Nov 2004

Project : Turnaround

Client : BPCL, HPCL, TATA & RCF

Job Description

Coordinate with security disciplines and ensure that maximum-security measures are provided to safeguard all materials and properties under custody of the Material Control Section.

Control all materials and equipment from the time of delivery thereof to a storage area until the issuance to subcontractor for fabrication or field installation. Maintain inventory record at all times.

Physically conduct periodic stocktaking on all materials held at warehouses/yards and update their inventory records accordingly.

Maintain and arrange all documents related to material control received from respective subcontractors such as acknowledged copy of construction material issue voucher, verified copy of construction material return voucher and all copies of approved request for approval of scrap.

Update all data of changes in piping materials due to the revisions of isometric drawing (ISO)/list of materials (LOM) and Field Change Sheet into the CMS/MARIAN. If there is any discrepancy between material requisition and the relevant ISO/ Field Changes, immediately consult with the Field Engineering Manager for remedial action.

VENKATESAN.J Mob: +91-784*******/819*******

Materials Controller E-Mail: ad5trs@r.postjobfree.com

Educational Qualification:

Bachelor in Science (B.Sc - Chemistry)

Computer Skills:

Ms-Office, Excel

PowerPoint

PageMaker

SAP (Experience only).

Technical Qualification:

ASNT LVEL II – RT, UT, PT & MPT.

Personal Details:

Date of Birth : 07.05.1977.

Passport Number : V8730837 (expiry on 06.04.2032).

Marital Status : Married

Languages : English, Hindi, Malayalam and Tamil.

Permanent Address. : J.Venkatesan, Old Adanakkottai, Pudukkottai-Dt, Tamilnadu, India-622 203



Contact this candidate