May 2015-September 2018

Mechanical superintendent

Myers & Sons

Ontario, California, United States

Ontario, Ca (9M)

I was responsible for managing and procurement of all material for the project. Coordinating project on site setup, submittals, schedules and subcontractors. I conducted daily and weekly safety meetings to encourage an accident-free environment. The project consisted of a Headworks remodification and dewatering, Sedimentation coating, Removal and install of the Grit screening and associated piping.

Long Beach (11M)

Mechanical superintendent-I was responsible for project onsite setup, submittals, RFI's and developing 6week schedules I conducted the daily and weekly safety meetings along with any training needed to help promote and maintain an accident-free working environment for everyone. I utilized the Last Planner through constraint planning, look ahead schedules and Weekly Work Plans and measured progress on production and planned percent complete. The project consisted of modification to the existing Aeration Facility. This included the demo 9 Aeration Basins including all diffusers, 18" SST piping 3 Blowers and associated valves and interior steel piping. Installation of the new diffusers, 18" SST piping tying into a 54" Steel Header piping, install of 3 Blowers (2ea 28000lbs, 1ea 35000lbs) and all electrical. Los Angeles World Airport Second Level Roadway Reconstruction-LAX, CA (80M) Element Manager/Canopies- Responsible for the installation of the new canopies throughout the project limits in the central terminal area. This Construction Manager at Risk (CMAR) project includes roadway and bridge reconstruction, vertical and electrical components, all required to be completed within an active international airport (LAX), requiring extensive owner and third-party coordination, as well as traffic control.

Gilroy WTP (10M)

Responsible for managing and procurement of all material for the project. Coordinating project on site setup, submittals, schedules and subcontractors. I conducted daily and weekly safety meetings to encourage an accident-free environment. This Project consisted of 4 new Clarifiers and associated underground piping, RAS/WAS pumping structure Modifications to the Oxidation structure and a retro fit of the existing Pre-Oxidation.

February 2012-2015

Civil/Mech Superintendent

PCL- City of Riverside Water Quality Control Plant

Riverside, California, United States

I was responsible for managing the procurement and materials information necessary for preparing the weekly reports on production costs, timecards and monthly billing. I implemented

(WWP) and measured progress on production and planned percent complete. I was also responsible for conducting daily and weekly safety gang box meetings to help promote and maintain an accident-free working environment for everyone. The project converted an existing Sed Bain to a 26 MGD MBR (membrane bioreactor facility). The construction included a new storm water equalization basin and ancillary facilities, new clarifiers, modification to existing clarifiers, 2 blower room, CCB

(Chlorine Contact Basin), Chemical farm and facility and upgrading of electrical generators. 2

November 2011-January 2012

Estimator

Div 3 & Div 5

United States

September 2009-November 2011

Mechanical / Civil Superintendent

Otay WTP

Chula Vista, California, United States

Oversee installation of Flocculation equipment, Stainless Super Scrapers, 3" NPW systems, Redwood Diffuser walls & completion of all concrete activities.

• Responsible procurement of tools and material needed weekly reports on production cost and time cards, monthly reports on billing of materials.

• Create and implement Last Planner through constraint planning look ahead schedules and Weekly Work Plans (WWP). Measure progress on production and planned percent complete.

• Implemented changes to support continuous improvement and build efficiencies in daily work activities and overall project performance.

• Responsible for conducting daily and weekly safety gang box meetings and maintain an accident-free working environment.

April 2008-September 2009

Mechanical / Civil Superintendent

Miramar Contract B

San Diego, California, United States

Oversee installation of Flocculation equipment, Stainless Steel Gates, 4" NPW systems, Fiberglass grating & misc concrete activities.

• Responsible procurement of tools and material needed weekly reports on production cost and timecards, monthly reports on billing of materials.

• Create and implement Last Planner through constraint planning look ahead schedules and Weekly Work Plans (WWP). Measure progress on production and planned percent complete.

• Implemented changes to support continuous improvement and build efficiencies in daily work activities and overall project performance.

• Responsible for conducting daily and weekly safety gang box meetings and maintain an accident-free working environment.

June 2003-May 2008

Civil Superintendent

Miramar Contract A

San Diego, California, United States

• Oversee construction of the Filter Bldg, Ozone Bldg & Chlorine Bldg

• Responsible procurement of tools and material needed weekly reports on production cost and time cards, monthly reports on billing of materials.

• Create and implement Last Planner through constraint planning look ahead schedules and Weekly Work Plans (WWP). Measure progress on production and planned percent complete. 3

• Implemented changes to support continuous improvement and build efficiencies in daily work activities and overall project performance.

• Formwork utilized Doka and Jahn- A system.

• Responsible for conducting daily and weekly safety gang box meetings and maintain an accident-free working environment.

May 2007-April 2008

Civil Superintendent

Perris Tertiary WTP

Perris, California, United States

Responsible for formwork design, procurement of formwork, tools and material needed, weekly reports on production cost and timecards, monthly reports on billing of materials.

• Create and implement Last Planner through constraint planning look ahead schedules and Weekly Work Plans (WWP). Measure progress on production and planned percent complete.

• Implemented changes to support continuous improvement and build efficiencies in daily work activities and overall project performance.

• Oversee construction of Chlorine Contact Basin, Pump Station, 2 Concrete Ponds

• Installation of Misc. Metals

• Responsible for formwork design, procurement of formwork, tools and material needed, weekly reports on production cost and timecards, monthly reports on billing of materials.

• Formwork utilized Aluna Beams and Jahn- a system.

• Responsible for conducting daily and weekly safety gang box meetings and maintain an accident free working environment.

June 2002-June 2003

Civil Superintendent

RP-1 & RP-4

Ontario, California, United States

Oversee construction of two Pump Station, Chlorine Basin, Splitter Box and installation of pre- stressed Double -T concrete panels.

• Responsible procurement of tools and material needed weekly reports on production cost and time cards, monthly reports on billing of materials.

• Formwork utilized Symons Handset, Jahn- a system and Hunnebeck forms.

• Responsible for conducting daily and weekly safety gang box meetings and maintain an accident-free working environment.

December 2001-June 2002

Carpenter Foreman / Field Engineer

Central Plant South Secondary

Las Vegas, Nevada, United States

• Responsible for all layout and construction of four clarifiers and Splitter Box.

• Responsible for all final road layouts around the project with the use of a total station.

• Formwork utilized Symons Radius Forms and Hunnebeck forms.

• Responsible for conducting daily and weekly safety gang box meetings and maintain an accident-free working environment.

June 1999-December 2001

Carpenter Foreman

Bar Screen Facility

Las Vegas, Nevada, United States

• Responsible for construction of the Grit Basin.

• Formwork utilized Hunnebeck forms and Jahn -A system.

• Responsible for conducting daily and weekly safety gang box meetings and maintain an accident-free working environment.

February 1998-June 1999

Carpenter Foreman / Field Engineer

San Elijo WTP

California, United States

• Responsible for construction of Chlorine Contact Basin, Splitter Box and Filter Structure.

• Responsible for all layouts of structures and roads.

• Formwork utilized Symons Handset, Jahn- A system

• Responsible for conducting daily and weekly safety gang box meetings and maintain an accident-free working environment.

July 1996-February 1998

Carpenter Foreman / Field Engineer

Corona WTP

Corona, California, United States

• Responsible for construction of Oxidation Basin and Headworks.

• Responsible for all layouts of roads.

• Formwork utilized Symons Handset, Symons Radius and Jahn- A system June 1995-July 1996

Carpenter Foreman

South Bay WTP

San Ysidro, California, United States

• Responsible for construction Sed Basin and misc site work

• Formwork utilized Symons handset Jahn-A hand set and Alluma System. May 1993-December 1993

Carpenter Laborer

Henderson WTP

Henderson, Nevada, United States

February 1989-April 1993

Carpenter/Surveyor

TIC- The Industrial Company, Inc

California, United States

EDUCATION

-2016

AGC

FMI Leadership Academy

United States

• 2016 #1 California Safety Superintendent of the Year/AGC

• 30 Hour OSHA

• STS Certified Safety Trained Supervisor

• CPR/First Aid

• Competent Person Training in: Confined Space, Lock-Out/Tag-Out, Fall Protection, Trenching and Excavation, Forklifts

• PBS (People Based Safety)

• SST I, II & III

• FMI Leadership Academy

• P3/P5/P6 (Primavera)

• Last Planner

• NCCER- Core Training - Trainer

• Procore

• SAP Training

• MS Office (Word, Excel, Power Point, Access)

• Workplace Harassment Training

• Crisis Management/Conflict Resolution

• Base Security Clearnce

• Crisis Management

SKILLS

Plant Design Pump Station Designing Waste Water Treatment Sedimentation Water Quality AACE Surveyor Concrete P3 Piping Suretrak Primavera Quality Control Continuous Improvement Fiberglass Generators PCL Computer Vision Civil/Mechanical Mechanical Construction Robotic Total Station Total Station Field Engineer RAS Radius SED SAP MS Office Irrigation Trenching Grating TIG Welding Stainless Steel Billing Budget Fall Protection OSHA Excavation Estimator CPR CPR/ Procurement Translate Crisis Management Excel Microsoft Office

CERTIFICATIONS

STS Certified Safety Trained Supervisor

HONORS & AWARDS

2016 #1 California Safety Superintendent of the Year/AGC LANGUAGES

English - Intermediate

WORK AUTHORIZATION

I am authorized to work in the following countries:

• United States



Contact this candidate