BRUNO PINELLI

NAME: : BRUNO PINELLI

ADDRESS: : *5300 Cutten Rd, Apt 2404, Houston, Tx. 77070

TELEPHONE:

E-mail:

: Cell No. 713-***-****

*********@*****.***

CERTIFICATES:

• NACE Certified, Level 2, Pipe Coating Inspector. Certificate No. 60873

• OSHA 30 HOUR Certified. No. 36-601******

• Certified to Inspect, Denso Girth Coating 7200, and 7125 Application

• Certified to Inspect, SPC 2888 and 2831 Girth Weld Coating Application PIPELINE INSPECTION EXPERIENCE:

(1) Main Line Coating FBE, and 2 Part Epoxy, Applied.

(2) TIE -In, FBE and 2 Part Epoxy Applied,

(3) HDD 2 Part Epoxy Applied.

(4) Pot Holing, Water Jet, and Vacuum

(5) Environmental, Installing Wet Area Fences

(6) Gates, and Fences

(7) Anomalies, and Strains

WORK HISTORY

July 2020 To Dec. 2020

ENBRIDGE, Ownsville Kentucky

Texas Eastern Gas Transmission Lines, from Houston to New Jersey Lines were laid in 1957. Inspected Anomalies, and Strains.

Nace, Level 2 Coating Inspector. Based on a Smart Pig data, I was attached to an Otis Eastern Crew, preforming, Sleeve installations, Line cut-outs Repairs by installing pipe section to replace damaged portion, or just Coating Repair.

Immediate Supervisor: Bart O’Neal Cel No. 318-***-**** Aug 2018 to Dec 2018

Elk Creek Pipeline Wyoming 20 inch OneOk Pipeline

Responsibilities: For all Tie-In Coating. The majority of the Material applied was SP-2888, and SP- 2831.

Immediate Supervisor Assistance Chief, Mr. Nile Handlin. 918-***-**** March 1, 2018 to Aug 2018

Coating Inspector on Spread # 2, Nexus 36” Pipeline, located in Alyria, Ohio. Inspecting SP-2888 and 2831 Two Part Epoxy Coating Application, to be applied to HDD’s, RR/Road Bores . Tie-in, and Above Ground 3 Part Coating.

Immediate Supervisor Derick Wells Cel. No. 903-***-****, Terry Klink 814-***-**** Page 1

July 2017 to Nov. 2017

Microalloying Inspection Service Houston, Texas.

Lead Coating Inspector with a staff of 5 Inspectors on Enterprise Products, Shin Oak 24” FBE Coated at LB Foster’s Pipe Coating facility, in Birmingham, Al. Responsible for FBE & ARO Coating of Shin Oak 24’ Pipeline, Loving County, and Orla NGL 16’, Along with a daily laboratory verify testing, for Soluble Salts, to 48 hour Soak Adhesion Test. Immediate Supervisor: Michelle Romedy 832-***-**** April 2017 to June 2017

Microalloying Inspection Service

Houston Tex.

Title: Lead Inspector for Enterprise Products, on Midland to Sealy project, at LB Foster’s Pipe Coating facility, in Birmingham, Al.. Enterprise 24” Coating Project, consisted of FBE, and ARO, along with a daily schedule to supervise, all laboratory testing related to the project. Immediate Supervisor: Michelle Romedy 832-***-**** Sept. 2016 To Jan. 2017

Universal Pegasus International. Marathon Petroleum Lead Pipe Coating, Inspector on a Marathon Project located at DURA Bond, Pittsburgh, Pennsylvania.

Responsibilities to apply FBE & ARO coating to a 16” Ø Project. The contract was for a Marathon Petroleum pipeline from, Lima to Harpster Ohio. Along with supervision of all Laboratory Test. Feb 2016 – July 2016

ENERGY TRANSFER COMANCHE TRAIL PIPELINE PROJECT

Pecos, TX to Van Horn, TX, and El Paso, Tx

Mainline girth weld coating inspector for ETC Comanche Trail 42-in Pipeline, Pecos, to El Paso, Texas. The Coating Process consisted of 2 Part SP- 2888, along with a Powder Ring Applicator Melvin Wells 817-***-****

Aug 2015 – Nov 2015

Marathon Petroleum

Lead Coating Inspector, Pittsburgh, Pennsylvania

Lead Inspector, with a crew of 3, at Dura Bond Coating facility, in Duquesne, Pa.. Applied external FBE to Marathon’s Coating specification, to their Cornerstone Project. Visually supervised and if passed, signed off, all laboratory testing, from bending of straps, to 24 and 30 hour soak tests. Nov. 2013, to July 2015

Universal Pegasus International

Lead Inspector for People’s Gas Chicago, Ill.

Responsibilities: Inspecting all Girth Weld 2 Part Epoxy Coating, and all pipe coating Repairs. On a project consisted of a South to North, 24 in. diameter, main Gas line, designed to be laid through the streets, of Chicago. The project was schedule for 5 phases. I inspected phase 1 through 4. Supervisor: Mathew Becker 281-***-****

Page 2

June . 2013 To Oct 2013

Company: Microalloying Coating Inspection

Location: Pittsburgh, Pa.

Function: Inspect the offloading Coated Pipes from River Barge to land Transport. Holiday Test all pipe Surface, and Repairs as required, prior to loading on land transport. Supervisor: Ben Meyers, Steve Garzia Cell : 830-***-**** March 2013 to May, 2013

Company: Microalloying Coating Inspection:

Title: Pipe Coating Inspector (9 months, Project)

Location: Welspun, Pipe Manufacturing & Coating Little Rock, Arkansas Function: Responsible as part of a team to Inspect all processed coated Pipe’s Surface, and enforced the signed specification standard.

Immediate Supervisor, was Mr. Jim Condon Cel: 832-***-****, Ben Meyers, Cell : 830-***-****

Oct. 2012 to Dec. 2013

Company: LaBarge Pipe Coating Sheldon Facility

Title: : Coating Plant Manager

Function: Organized, Manage, and Direct, 2 Shifts of 60 personnel / shift. To Apply FBE & ARO Coating, to Carbon Steel Pipes.

Main Office: 8300 Eager Rd. Suit 602, St. Louis, MO Responsibilities: Set up and organize the pipe coating facility, to maximize quality and output. Manage Plant and Office Personnel to proceed with a 24 hour / Day, 7 Days / week Schedule. Oct, 2010 to Sept. 2012

Company: TKPS BV

Title: : North & South America Representative

Function: International Pipe Coating Equipment Design & Fabricator Main Office: The Netherlands CEO Mr. Wayne Buttimore Cell No. +31-622-***-*** Responsibilities: To meet with potential customers, and recommend Equipment and Pipe Coating solutions to best suit their requirements, and environmental needs.. TKPS Installed or Modified Equipment in the following locations: (1)Welspun Little Rock AR., (2)Bayou Pipe Coating New Iberia, LA, (3)Jendal Baytown, Tx. (4)PSL, Bay St Louis, MS., Ber Steel, Panama City, Florida.

March, 2007 to Sept. 2010

Company: BAUHUIS INTERNATIONAL BV

( Manufacture of Carbon Steel Pipe Coating Equipment) Title: North and South America Representative

Function: Sales Engineering for Pipe Coating Equipment Design & Fabricator Main Office: The Netherlands

Installed as well as Instructed local Personnel to Operate Equipment in the following locations:

(1)External FBE Application, Jindal USA Baytown, Tx., (2) Internal Blast and Coat Equipment Welspun’s Little Rock AR., (3)Socotherm LaBarge Channelview, Texas., (4)Bayou Pipe Coating, New Iberia, LA, (5)Bayou Pipe Coating Baton Rouge LA, (6)Berg Pipe, Mobile, Al., (7) American Cast Iron, Pipe Birmingham, Al.(8)Jindal Saw Baytown, Texas.

Page 3

March. 2004 to March, 2007

Company: SOCOTHERM MIDDLE EAST, QATAR

Title: Engineering Dept.

Main Responsibilities: Responsible for all site Coating Applications from 3 Layer, FBE Internal, and External Concrete Coating. The project called for 3Layer Corrosion Coating, with a Concrete, Coating layer. The pipe sizes were 48”, 38”, and 36”OD pipes. With up to 4” to 6” Concrete Jacket. Project: Dolphin Gas Project, Qatar. 365km of 48”, 3Layer & Concrete, 157Km of 36” 3Layer & Concrete, 207 km of 38” 3Layer & Concrete Project Manager: Bo Crawley, Dubai. Present Cell +971-***-**-**** April. 1999 to Feb., 2004

Company: BAUHUIS INTERNATIONAL BV

Title: Project Site Manager

Function: International Pipe Coating Equipment Design & Fabricator Main Office: The Netherlands CEO Lex Bauhuis

Main Responsibility: Based at ILVA’s TARANTO Location, as Bauhuis Representative To advise on design pipe coating equipment, for ILva’s management with Automated PLC control systems, in order to reduce plant personnel..

Nov, 1998 to Feb. 1999

Company: SOCOTHERM, Spa, Adria, Italy

Title: Estimating & Technical Offer Manager

Main Responsibility: To estimate Equipment, Required and Cost related for all International Coating Projects.

Immediate Supervisors: Eng. Giancarlo Tocchio. Socotherm CEO Aug., 1994 to Nov., 1998

Company: Al-Qahtani Pipe Coating, Dammam, Saudi Arabia Title: Site Engineering, with Main Responsibility to install a 3Layer Coating Plant, with capacity to coat 10.75”” to 80” Ø pipe.

Main Responsibility: To integrate and Install New Equipment, along with personnel training at their Site #1, facility, to applying a 3 Layer PE, Coating.

Responsible To: Tariq Al Qhatani

Feb., 1993 to Aug., 1994

Company: ARABIAN SHAW, Sattahip, Thailand

Title: Operation Manager

Main Responsibility: Manage the coating operations at the FBE, 3Layer, and Concrete coating facilities. Immediate Supervisors:: Doug Lily, Warren Bennett,, Tony Lawson Jan, 1989 to Sept, 1992

Company: APCO, ARABIAN Pipe Coating Co. Jubail, Saudi Arabia Title: Operations, and Engineering Dept. Manager

Main Responsibility: To Organize and Manage the Facility’s new Equipment Installation, and a daily scheduling of the Coating Operations.

Site’s consisted of, 3Layer, FBE, 12” to 60”, Double Joint, Concrete Coating and Custom Fitting Shop, Site Manager: Bo Crawley, Dubai. Present Cell No. +971-***-**-**** Page 4

Jan, 1985 to Jan, 1989

Company: BREDERO PRICE: Shariqah, Dubai area,

Title: Coating Operations Manager,

: Site’s consisted of, FBE, Coal Tar, and Concrete Coating. Along with a large facility for Internal & External FBE Coating to large and small Fitting.

Site Manager: Bo Crawley, Dubai. Present Cell No. +971-***-**-**** Aug., 1982 to Dec, 1984

Company: BREDERO PRICE: Jubail Saudi Arabia.

Title: Plant Coating Manager Eventually took over the position as Operations Manager Main Responsibility: was to satisfy our main customer Saudi Aramco. Aramco’s scheduled projects were to apply Coal Tar, FBE, Center PE, and Concrete coating, to 12.75” to 48” pipe Diameters.

Site Manager: Lee Evans, Bo Crawley, Dubai. Present Cell +971-***-**-**** May, 1979 to June, 1982

Company: MidCon Pipeline Equipment Co, Houston, Texas. Title: Sales Engineering & Stationary Pipe Coating Equipment Set Up Main Responsibility: To assist the sales team with Equipment required, and responsible for equipment Installation. Through many years, Midcon supplied Pipe Coating Equipment to a large list of International clients. Required to familiarize locally personnel to operate and produce a quality product. Site Manager: Hugh Foster, George Marrick

PAGE 5