P. RADHA KRISHNAN, B.Tech (Electrical)
CARRIER PROFILE
1. Organization: Galfar engineering &contracting SAOG, Oman. Designation: Deputy Manager (Electrical).
Period : May 2011 to March 2024.
Experience: 13 Years.
2. Organization: Al Amri Glass Sukret factory Est, Saudi Arabia. Designation : Electrical Engineer.
Period : March 2010 to March 2011.
Experience: 1 Year.
3. Organization: Arabian Forasol Foundation LLC, Dubai, UAE. Designation: Electrical Engineer.
Period : April 2006 – February 2009.
Experience: 3 Years.
4. Organization: SMR Cotton Mills Pvt Ltd, India.
Designation: Electrical Supervisor.
Period : June 2002 – November 2005.
Experience: 3 Years.
5. Organization: Public Works Department (PWD), India. Designation : Electrical Trainee.
Period : May 2001 – May 2002.
Experience: 1 Year
6. Organization: Turbo Electrical Engineers & A Grade Contactors. Designation : Electrical Supervisor.
Period : June 1998 – May 2001.
Experience: 3 Years
Over all 25 Years of Experience (08 Years in India and 17 years in Middle East - Dubai, Saudi Arabia, and Sultanate of Oman) in Electrical Engineering, Quantity surveying, Execution of Airfield (AGL), Residential and Commercial projects. Experience in Inspections, Testing and Commissioning, and Maintenance of construction projects. Seeking a position in your firm that will utilize, expand and enhance my academic and technical knowledge base to develop a fulfilling career in the organization. CONTACT INFO
Phone:
+91-948******* (India)
E-Mail:
*****************@*****.***
********@*****.***
SKILL MANAGEMENT
Project management
Quality Controller
Team Management
Complex problem solver
SOFTWARE KNOWLEDGE
AutoCAD
MS- Program
LANGUAGES
English
Tamil
Hindi
Malayalam.
Arabic.
DRIVING LICENSE
Oman LMV License.
India LMV License.
`Page 2 of 5
ACHIEVEMENTS CONTACT INFO
RESPONSIBILITIES
Successfully managed, team of size 200-350 men and budgets varying across 12 million to 30 million OMR as Deputy Electrical Manager. Managed the construction process from the conceptual development stage to final construction and making sure that the project completes on time & within the set budget accordance with the project charter.
Coordinated with statutory bodies, prepared look ahead programs, reviewed plant and labor allocation, method statement and risk assessments & review of drawings.
Preparation of operation & maintenance manuals, Standard operating procedures for the electrical system of the Main Pumping Station, Area Pumping Stations & Grinder Pumping Stations.
Preparation of As build drawings. (Well-versed with Auto Cad, Excel & Word.)
Installation of Pole mounted Transformers, Ring Main unit & HT Cable laying work.
Operation and Maintenance of Main pumping station, Area Pumping Stations
(22 Nos ).
Document Control work, distribution of controlled drawings to the Site as per QA/QC requirements.
Electrical, Instrumentation & SCADA related works for Reservoir Project & Pumping Station. Installation testing & commissioning of Analyzers, Actuators Flowmeters, Level Sensors.
Installations of MOV'S, PT'S, HV switchgear, Soft starter, HT cable laying works.
Pump station and building Electrical works, building wiring, HVAC works, Data networking works
Installation testing of LV /HV cables
Installation and Testing of 48 Fiber Single Mode Fiber Optic cable.
Installation, testing, and Commissioning of MOV's, Flow Meters, Pressure Transmitters.
Installation, testing commissioning of PLC/SCADA system.
Design Review of Electrical, Fire Alarm and Fire Fighting system.
MEP Material review and submission for a client.
Technical Evaluation of all MEP material for the project. Before MAS submission.
Material Procurement follow-up and inspection.
Preparation and Submission of working and shop drawings and obtaining their approvals.
Complete installation of cabling, internal wiring of electrical motors (for the pumps), control panel for area pumping station and grinding pump station, testing and commissioning.
CCTV installation works
Intruder Alarm System installation works.
Automatic gate barrier Installations and testing work.
Fire Alarm and Fire Fighting system installation work review and supervision. HOBBIES
Playing Crick
Internet Browsing.
Listening Music.
PERSONAL PROFILE
Passport No : M9211468
Valid Up to : 21-09-2025.
Date of Birth : 09-06-1976
Age : 47
Sex : Male
Marital status: Married
Nationality : Indian
Skype ID : +968-********
TRAININGS
QMS - Quality Management
System
QHSE – Inductions
H2S Awareness
Confined Space.
`Page 3 of 5
SUMMARY OF PEROSONAL EXPERIENCE
Oman – 13 Years (From May 2011 to March 2024).
Project -1
This project involves Refurbishment of Southern Runway, Taxiway, AGL and Utility services (ie). Earth works, Concrete structure, Pedestals, water proofing, Road work, AGL light works and other services. Project -2
The construction of Dual Carriageway National Road NR32, Phase -1 at Duqm. Which includes 41.7KM of road, Along with existing underground cable 33KV & FOC cable, Omantel, Ooredoo and Water pipe line and Fire hydrant, ( 800mm dia & FOC ), Gas Pipe Line, MOD Line and 33KV, 132KV OHL and UGL accordance with drawing. Project -3
The water distribution network includes Engineering Procurement and construction of drinking water pipeline network for Al Hamra Town. Which includes 400 Km of the pipeline network. One Reservoir, Break Tank, Administration Building, Five skids mounted 21nos Booster pumping station & SCADA system to link the networks for remote operation. Project -4
Development of Muscat International Airport Project at Muscat Employer GALFAR ENGINEERING & CONTRACTING SAOG.
Role Deputy Electrical Manager – (Utilities)
Client Civil Aviation Authority (CAA), Muscat, Sultanate of Oman. Consultant Renardet S.A. & partners Consulting Engineers LLC. Duration From November 2022 – March 2024.
Construction of Dual Carriageway National Road Nr-32, Phase-1 At Duqm. Employer GALFAR ENGINEERING & CONTRACTING SAOG.
Role Deputy Electrical Manager – (Utilities)
Client Public Authority for Special Economic Zones and Free Zones. Consultant National Engineering Services Pakistan and Partners L.L.C. Duration From September2022 – November 2022.
Construction of Water Distribution Networks for Wilayat Al Hamra and Bilad Sait In Ad Dakhliya Region.
Employer GALFAR ENGINEERING & CONTRACTING SAOG.
Role Deputy Electrical Manager – (Utilities)
Client Public Authority of Water (PAW, Diam)
Consultant Mott MacDonald & Co LLC.
Duration From October 2019 – August 2022.
Salalah LPG Project – PDO SIte
Employer GALFAR ENGINEERING & CONTRACTING SAOG.
Role Deputy Electrical Manager – (Utilities)
Client Oman Gas Company S.A.O.G (OGC).
Consultant Petrofac.
Duration From September 2019 – October2019.
`Page 4 of 5
Project -5
Project -6
Project -7
Saudi Arabia – 1 Year (From 2010 to March 2011).
Project -8
UAE – 3 Year (From April 2006 to February 2009).
Project -9
India – 8 Year (From June 1998 to November 2005).
Project -10
Royal Oman Police (ROP) General Hospital Muscat Oman Employer GALFAR ENGINEERING & CONTRACTING SAOG.
Role Senior Electrical Engineer
Client Royal Oman Police
Consultant Option One International W.L.L
Duration From October 2015 to August 2019.
Ras-Al-Hadd International Airport, Sur, Oman
Employer GALFAR ENGINEERING & CONTRACTING SAOG.
Role Electrical Engineer
Client Civil Aviation Authority (CAA).
Duration From September 2012 to October 2015.
Salalah International Airport, Salalah, Oman
Employer GALFAR ENGINEERING & CONTRACTING SAOG.
Role Electrical Engineer
Client Civil Aviation Authority (CAA).
Duration From May 2011 to September 2012.
AL AMRI GLASS SUKRET FACTORY EST, Saudi Arabia
Employer Al Amri Glass Sukret factory Est, Saudi Arabia Role Electrical Engineer
Duration From March 2010 to March 2011
Dubai Metro Rail
Employer Arabian Forasol Foundation LLC, Dubai
Role Electrical Engineer
Client JT Metro JV (Japan Turkey Metro Joint Venture) Consultant Systra and Parsons for RTA (Road and Transport Authority) Duration From April 2006 – February 2009.
Construction of SMR Cotton Mills
Employer SMR Cotton Mills PVT Ltd.
Role Electrical Supervisor
Duration From June 2002 –November 2005.
`Page 5 of 5
SOFTAWRE SKILL CERTIFICATIONS
DECLARATION
EDUCATION
Project -11
Project -12
B.Tech – Electrical, SSK Engineering College, Chennai (RVU).
Diploma in Electrical & Electronics Engineering ( MPT ).
Diploma in Computer Application.( Microsoft Excel, Microsoft Word, Microsoft Power point)
Diploma in Foundation Electrical CADD. (AUTO CADD 2D, PC schematic Elautomation) I hereby declare that all the details furnished above are true. I believe in being loyal to the organization and work sincerely.
PLACE :
DATE :
(P.RADHAKRISHNAN)
TURBO ELECTRICAL ENGINEERS & A GRADE CONTACTORS
Employer PUBLIC WORKS DEPT ( PWD ), India
Role Electrical Trainee.
Duration From May 2001 – May 2002.
TURBO ELECTRICAL ENGINEERS & A GRADE CONTACTORS
Employer TURBO ELECTRICAL ENGINEERS & A GRADE CONTACTORS Role Electrical Supervisor
Duration From June 1998 – May 2001.