Post Job Free
Sign in

Power Plants Mechanical Engineering

Location:
Chennai, Tamil Nadu, India
Posted:
May 06, 2024

Contact this candidate

Resume:

RESUME

*. NAME : C.SHANMUGAM.

*. DATE OF BIRTH : 30 TH MARCH 1964.

3. MARITAL STATUS : MARRIED.

4. E-MAIL : **********@*******.***

5. PRESENT ADDRESS : C.SHANMUGAM

PLOT NO-23,F1 THIRUVALLUVAR ST,

NILAMANGAI NAGAR

ADAMBAKKAM

CHENNAI-600088

MOBILE: 733-***-****

6. QUALIFICATION:

1. Completed Master Degree in Mechanical Engineering (Industrial Engineering) in

2006 from College of Engineering, Andhra University, Visakhapatnam and stood

First in college, secured 71.00 Percentage marks.

2. Completed Degree in Mechanical Engineering in 1994 from Institution of

Engineers (India), Calcutta.

3. Completed Diploma in Mechanical Engineering from State Board of Technical

Education and Training, Tamilnadu and secured 84.00 Percentage marks.

7. OTHER QUALIFICATIONS:

1.Certified as “Boiler Operation Engineer” (B.O.E) from Tamilnadu in 1994.

8. PROFESSIONAL TRAINING :

1.Undergone 22 Weeks training on “Operation and Maintenance of Thermal Power Station” from “Power Engineers Training Society (PETS)’’, Nagpur in 1987. (On job training at 220 MW Koradi Thermal Power Station, Nagpur, Maharashtra).

2.Attended training on “Circulating Fluidized Bed Combustion Boiler Operation &

Maintenance” organized by M/s FOSTER WHEELER INC.USA.

3.Attended training programme on Industrial Steam Turbine “organized by M/s

BHARAT HEAVY ELECTRICALS LIMITED”, Hyderabad.

9. PROFESSIONAL PROFILE :

Mechanical Engineer having more than 33 years of Thermal Power Station experience

looking forward to work on challenging and responsible positions. Experienced on

Axial flow ABB Steam Turbine & BHEL –1V Steam Turbine, SHIN-NIPPAN

Turbines, Siemens make Turbine, QINGDAO Jieneng Steam Turbine (Low Pressure

Turbine), Siemens make Turbine (low pressure Turbine), Pulverized fuel fired

Boilers (PF), Circulating Fluidized Bed Combustion Boilers(CFBC),

Atmospheric Fluidized Boilers (AFBC), Alstom make Waste Heat Recovery Boilers,

American Schak make Waste Heat Recovery Boilers.

Experienced in M/s ISGEC and M/s Transparent supplied Cement based Waste

Heat Recovery Power Plants.

Also experienced in 2 x660 MW Chettinad Power -Super Critical Boilers from tendering

stage to complete erection, commissioning, Operation and Maintenance of Power

Plants.

Experience in Erection, Commissioning, Operation and Maintenance of Captive Power equipments and Cement Based Waste Heat Recovery Power plants.

Well experienced on condition monitoring of equipments with IRD & Bentley

Systems.

10. ACCOMPLISHMENTS :

At Present Job:

1. More than11 Years of experience as Captive power Plants Head in Chettinad

Cement Corporation Private Limited, Chennai.

Leading a team of Chettinad Engineers and O &M Team (Hofincon) for the operation

and Maintenance of below CPPs & Waste heat Recovery Power plants.

1. Puliyur 1 x15 MW

2. Karikkali 1 x15 MW, 2 X30 MW

3. Ariyalur 3 x15 MW

4. Kallur 1 x30 MW &

1 X7.3 MW (Cement Based WHRPP)

5. Anjani 1 x16 MW

6. Dachepalli 1 x19.05 Mw (Cement based WHRPP)

2. Complete Erection and Commissioning of Captive Power plants&Cement Based

Waste Heat Recovery Power Plants carried out under my supervision.

1.Karikkali 2 x30 MW

2.Kallur 1 x30 MW

3.Kallur 1 x 7.3 MW (Cement Based WHRPP)

4.Anjani 1 x16 MW

5.Dachepalli 1 x19.05 MW (Cement Based WHRPP)

3.Experienced in Chettinad Power corporation private Limited of 2 x660 MW Super Critical Power plant from tendering stage to erection, commissioning, Operation and Maintenance of complete Power plant.

During previous job:

a) More than 13 years of experience as Operation& Maintenance Section Head in Co-Generation Plant of 53.5 MW of RAIN CII CARBON (INDIA) LIMITED, Visakhapatnam,

Leading a team of Engineers and Technicians and involved from Erection stage to

Commissioning stage and Smooth running of the Plant.

Carried out Design modifications on Circulating Fluidized Bed Combustion Boilers,

Waste Heat Recovery Boilers which improved the Boiler efficiencies by 3 to 4 %.

Overhauled the M/s ABB MP –24 Model Turbine.

b) More than 10 years experience in Thermal Power Station Mechanical Maintenance

division of Heavy Water Plant of Department of Atomic Energy, Manuguru,

Andre Pradesh.

Leading a team of Technicians and involved from Erection stage to

Commissioning stage and smooth running of Pulverized fuel fired Boilers of

3x265 T/Hr and106 kg/sq.cm at 485 Deg.c.

11. JOB PROFILE

I.ORGANISATION : M/S CHETTINAD CEMENT CORPORATION

PVT LTD, CHENNAI

DURATION : From September 2011 Onwards

PRESENT DESIGNATION : SENIOR GENERAL MANAGER (CPP)

COMPANY PROFILE:

This is Leading Cement Manufacturing Company in south India. Having 9 Captive

Power Plants at various locations totaling of 181 MW and Cement based Waste Heat

Recovery Power Plants totaling of 26.35 MW

RESPONSIBILITIES :

Reporting to Chief Operating officer and leading a team of Chettinad Engineers and

Operation and Maintenance team (Hofincon) for the following activities.

1.Complete Operation and Maintenance of Captive Power plants and Waste Heat Recovery Power Plants.

2. Complete day to day operation, maintenance and monitoring of various critical

Parameters of Plant Load factors (PLF), Availability, Heat Rate, Aux power

Consumption, Variable cost & Fixed cost of Power Generation.

3. Preparation of Tender for the Operation and maintenance contract and awarding to the

successful bidder. Conducting various meeting with O&M contractor for smooth

running of Power Plant.

4. Planning and Implementation of Preventive maintenance schedule and Condition monitoring of equipments. Planning and completion of shutdown activities as per the targets.

5. Responsible for complete overhauling of Turbine, Boilers, Air cooled condensers and other Power Plant Equipments.

6. Involved in various energy conservation measures and reduced the heat rate and Aux Power consumption drastically.

7. Resposible for the Preparation of Production and Revenue Budgets and reviewing the same with management for approval.

8. Involved in Power purchase agreement with TANGEDCO and IEX for power export from Power Plant.

9. Identification and finalization of Technical consultant for new projects, Preparation of Tender, offers receiving & securitizing, Evaluation, releasing of contract to the successful bidder, conducting various technical meetings with the suppliers, smooth execution &erection and commissioning of the Captive Power Plants and Cement Based Waste Heat Recovery power Plants.

10. Complete Erection and Successful commissioning of Power plants carried out under my supervision.

1.Karikkali 2 x30 MW

2.Kallur 1 x30 MW

3.Anjani 1 x16 MW

11. Complete Erection and Commissioning of Cement Based Waste Heat Recovery

Power plants carried out under my supervision.

1.Kallur 1 x7.3 MW

2.Dachepalli 1x 19.05 MW

12. After successful commissioning of Captive Power Plants and Cement Based Waste Heat Recovery Power Plants PG Tests were conducted along with vendor.

13. Involved in Chettinad Power corporation private Limited of 2 x660 MW Super Critical Power plant from tendering stage to erection, commissioning, Operation and Maintenance of complete Power plant.

14. Involved in erection and commissioning of 3 MW Solar PV Module Power plant in Kallur site, Karnataka state & 3MW IN Solapur, Maharashtra.

II. ORGANISATION : M/S RAIN CII CARBON (INDIA) LIMITED

VISAKHAPATNAM

DURATION : From October 1997 to Aug 2011

DESIGNATION : SENIOR MANAGER (MECH)

COMPANY PROFILE:

This is a Multi National Company having collaboration of M/S RELENT ENERGY,

M/S AMCOR & M/S HIE of USA .

Having 53.5 Mwe Co-Generation plant, which is equipped with Axial flow Impulse

Turbine of M/S ABB Make, having 3 Boilers of each 110 TPH, 64 Kg/sq.cm at 485

Deg.c.

One Waste Heat Recovery Boiler manufactured by M/S AMERICAN SCHACK, USA

&the second is Circulating Fluidized Bed Combustion Boiler by M/S FOSTER

WHEELER LTD, USA & the third one is Waste Heat Recovery Boiler by GEC

ALSTOM.

RESPONSIBILITIES :

Reporting to General Manager (Operations). Leading a team of Engineers and

Technicians for the following activities.

1. Completion of all balance of plant system erection and commissioning i.e Coke, Lime, Fuel handling system and auxiliary steam supply system within the scheduled dates. Includes Planning and Procurement of material requirement to support the erection.

2. Coordinated with M/s AMERICAN SCHACK,USA & M/s L&T for the complete erection and commissioning of Waste heat recovery boiler 110T/hr,64 kg/cm2&485·c.

3. Coordinated with M/S ALSTOM, USA for the complete erection and commissioning of Waste heat recovery boiler 110 T/hr, 64 kg/cm2&485·c.

4. Coordinated with M/s FOSTER WHEELER INC, USA for the complete erection and commissioning of India’s first coke fired circulating fluidized bed combustion boiler.

5. Follow up of erection and commissioning of entire power plant in association with M/s SURGENT&LUNDY, USA

6. Coordinated with M/S THERMAX, INDIA for the complete erection and commissioning of auxiliary boiler 4 T/hr, 10.54 kg/cm2& 100·c

7. Preparation of ISO documentation and implementation of the same and training of Engineers and Technicians for ISO.

8. Coordination with boiler regulatory authorities to get certification of boilers.

9. Running the Plant with highest PLF with lowest manpower and preparing budgetary planning of spares requirements.

10. Planning and Implementation of preventive maintenance schedules and condition monitoring of equipments. Planning and completion of shutdown activities as per the targets.

11. Successfully carried out the complete erection and commissioning of Sea water Reverse Osmosis Plant capacity of 25 TPH.

12. Involved in successful implementation of SAP –ERP Package –PM Module during the year MAY 2009.Worked as a PM Module Project Coordinator between Rain CII Carbon (India) Ltd and Wipro team.

13. Involved in erection and commissioning of addition of one more economizer module in one of the Waste Heat Recovery Boiler in order to drop the Flue gas temperature from 220 Deg.c to 200 Deg.c and thereby increase in steam generation by 3 T/HR.

III. ORGANISATION : M/S HEAVY WATER PROJECT, MANUGURU

DEPARTMENT OF ATOMIC ENERGY

DURATION : From May 1987 to October 1997.

DESIGNATION : ASST.ENGINEER.

COMPANY PROFILE:

This is a Department of Atomic energy establishment of 200 T/HR Heavy water generation capacity. Having 3 x 30 MW Power plant with three numbers of M/s Bharat Heavy Electricals, India mark IV Turbines and 3 Numbers of M/s BOBCOCK make Pulverized Fuel fired Boilers of each 265T/Hr,106 Kg/Cm2 at 485· C

RESPONSIBILITES:

Reporting to Engineer-In-Charge. Leading a team of technicians and coordinated with M/s Tata Projects Ltd,M/s Bobcoke &Wilcox and M/s BHEL for the following activities.

1.Commissioning of Steam Generators of 3x 265T/Hr and 106 kg/cm2 at 485·c,

2.Commissioning of BHEL make 3x30 Mwe Mark –IV turbine.

3.Involved in Annual overhauling of steam generators, Induced draught fans, Forced draught fans.

4.Involved in maintenance of all types of pumps including Boiler Feed Pumps, Condensate Extraction Pumps, and Circulating water pumps.

5.Involved in preventive, breakdown maintenance and overhauling of ball& race ABL make 8.5E mills of capacity 30.2 T/hr

6.Involved in preventive,breakdown maintenance and overhauling of Ingersoll-Rand make-Reciprocating multistage compressors (855 m3/hr &8.1 kg/cm2)

7.Involved in Preventive and Break down maintenance of boilers and its rectification.

8.Involved in Planning of Inventory and making them ready to achieve maximum

availability of Plants. .



Contact this candidate