Post Job Free
Sign in

Electrical Engineer Natural Gas

Location:
Hyderabad, Sindh, Pakistan
Posted:
May 01, 2024

Contact this candidate

Resume:

CURRICULUM VITAE

NAME AMJAD HUSSAIN AWAN

POSITION Electrical Engineer

CONTACT NO. 0092-334-***-****(Mobile) / 009*-**-*******(Landline) E-Mail ad5euw@r.postjobfree.com

OBJECTIVE

To select a job which will enhance knowledge with supportive environment seeking Responsible challenging and growth oriented opportunity in a good reliable Organization where my skill and experience can be utilized at a full extend and should Provide me a space to dream and exposure to cutting edge technology PERSONAL INFORMATION

Father Name Nazeer Hussain

Date of Birth 15th September 1955

Nationality Pakistani

Religion Islam

Marital Status Married

Home Address : House No. 94-B, Block No. E, Unit No. 6, Latifabad, Hyderabad. Sind.Pakistan Driving License Having Pakistani Driving License (LTV) QUALIFICATION

BE Electrical from Mehran University of Engineering and Technology. Jamshoro. Pakistan.(1984)

SUMMARY OF SKILL

1. Professionally qualified and highly experienced in Electrical engineering offering 28years of experience in Electrical Construction work for Civil Projects and Manage, Operation, Maintenance, Troubleshooting of MV and LV Power Generation Plant(Diesel,HFO and Natural gas fired), Utilities, Sub Station & Varies type of machines.

2. Manage and run all construction projects and familiar in construction aspect

3. Experienced in reviewing and coordinating drawing and other technical data and monitoring progress of the project 4. Well coordination between consultant, client and subcontractors EXPERIENCE

POSITION

Maintenance Engineer Power 01st Jan 1983 – 20th Dec 1983 COMPANY NAME

Working with Al – Rafhaqs Engineering. Hyderabad. Pakistan(Contractor) RESPONSIBILITY

Electrical erection and maintenance work of a textile mills POSITION

Trainee Engineer Electrical 21st Oct 1984 – 01st Jan 1985 COMPANY NAME

Working with GPI Ltd. Karachi. Pakistan

RESPONSIBILITY

Electrical Switchgear and Electrical Panel Manufacturing POSITION

Dy. Manager Electrical 15th June 1985 – 30th Nov 1995 COMPANY NAME

Working with Rupali Polyester Ltd (Textorium Ltd) Pakistan RESPONSIBILITY

: Daihatsu Generator Sets(Diesel and HFO fired) 11KV/1.4MW

: Centrifugal Chillers (Hitachi) 400 Tones

: Screw Compressors GA1408W of Atlas Copco

: Central Air Conditioning System

POSITION

Dy. Manager Electrical 06th Nov 1995 – 10th Nov 2006 COMPANY NAME

Working with Ellahi Electrical Co.(Nagina Group) Kotri. Pakistan RESPONSIBILITY

: Niigata Generator Sets (Diesel and HFO fired) 11KV/2.3MW

: Caterpillar Diesel Generator Sets 3512, 400Volts

: Caterpillar Generator Sets G-3516/G-3520B (Natural gas fired), 400Volts

: GE Jenbacher Generator Sets j620gs(Natural gas fired) 11KV/3.3MW

: Reciprocating Compressors, MV/LV Switchgears, MV/LV Substation, Electrical

:Panel, Motor Control Panel, Motors, Transformers

POSITION

Senior Electrical Engineer 14th Jan 2007 – 31st Oct 2007 COMPANY NAME

Working with Saudi Bin Laden Group(ABCD) Saudi Arabia(Contractor) PROJECT NAME

Residential and Security Buildings. Ministry of Interior Project, Dammam. Saudi Arabia POSITION

Senior Electrical Engineer(Zone Manager) 31st Oct 2007 – 5th Oct 2011 COMPANY NAME

W/with Saudi Bin Laden Group(ABCD & Advanced Vision) Saudi Arabia(Contractor) PROJECT NAME

Residential and Central Facility Buildings(King Abdullah University of Science and Technology(KAUST)(Client) and ARAMCO(Consultant) Project, Jeddah. Saudi Arab POSITION

Senior Electrical Engineer 05th Oct 2011 – 20th Oct 2012 COMPANY NAME

Working with Saudi Bin Laden Group(Advanced Vision) Saudi Arabia(Contractor) PROJECT NAME

King Saud Bin Abdul Aziz Hospital(Client) & Dar Al-Handasah(Consultant) Project, Al-Hassa. Saudi Arabia

RESPONSIBILITY

Manage and Execute the Electrical Construction work (Indoor & Outdoor) for Civil Projects, Such as:- Wiring, Wiring devices, Lighting Fixture, Switchboard, Electrical Panel installation and termination, Ring main unit(RMU) installation and termination, High mast pole installation and Electrical work, High rise buildings Electrification and Electrical work, Substation and Transformer installation and Electrical work, Power House and Chillers installation and Electrical work, LV and MV cables laying and termination, Grounding and Air Terminal system Installation, HVAC system installation and Electrical work, Maggering, HI Pot Test and Testing the Installation.

POSITION

Manager Power House 15th Jan 2013 – Till Date

COMPANY NAME

Working with Lucky Textile Mills. Nooriabad. Pakistan RESPONSIBILITY

Manage, Operation, Maintenance and Troubleshooting of GE Jenbacher Generator sets, Natural gas fired. Model:- (1). Jgs420, 420Volts, 1415KW

(2). Jgs320, 420Volts, 1034KW & (3). Jgs320, 420Volts, 1064KW



Contact this candidate