Post Job Free

Resume

Sign in

Assembly Technician, egineering technician, electo mechanical assembl

Location:
Sacramento, CA
Posted:
April 26, 2024

Contact this candidate

Resume:

●Dante D. Aquino

**** ***** **. *** ****, CA ****7

Phone:669-***-****

ad5a4i@r.postjobfree.com

OBJECTIVE: To utilize my skills as a machine operator, maintenance, assembler and technician

QUALIFICATIONS: Honest, highly motivated, dependable, work well with others

June 2015 – February 2021 Lam Research- Assembly Technician/Semi-Conductor Equipment

Assembled and test chambers, worked with generator cart and pump, tested water leak, water flow, and linearity, worked with engineers, followed written and verbal instructions, familiar Lam with print and schematic diagrams

●August 2012-March 2015 Festo Corporation

Assembled and test power supply and pneumatic panels. Worked with engineers. Followed written and verbal instructions, familiar with prints and schematic diagrams.

February 2009-April 2012 Nano Solar- Machine Operator

Maintain and operated machines such as Pilot Anneal,

Manufacturing Anneal, Grid, Coating Machines, performed inspection and sorting on product, worked with power tools and with engineers

July 2004-September 2008 Lam Research- Assembly Technician/Semi-Conductor Equipment Assembled and test chambers, worked with generator cart and pump, tested water leak, water flow, and linearity, worked with engineers, followed written and verbal instructions, familiar Lam with print and schematic diagrams

October 1997-February 2004 Applied Komatsu Technology-

Engineering Technician/Semi-Conductor Equipment

Assembled 1600, 4300, 5500, 10K chambers and mainframes, performed mechanical and electrical set-up, adjustments troubleshooting, modifications, final testing integration, and leak checks, provided training and support to assemblers, responsible for incoming system inspections, verifying customer configuration installation

March 1993-August 1997 Novellus System-

Assembly Technician/Semi-Conductor Equipment

Worked on final assembly process, performed point to point wiring, soldering through surface mount and hole on PC board, installed transfer chamber, load lock, Bimbas, heater box, 4-inch vacuum lines, Photohelic, IOC and turbo

, assembled robotics, cable harness, pneumatic panels and fiber-optic sensor, converted and modified mechanical and electrical assemblies using caliper and power tools, conducted final testing, plumbing and drilling, interfaced with engineers and followed written and verbal instructions, worked with prints an schematic diagrams

January 1989-February 1993 Thermo Electron- Electro-Mechanical Assembly/Medical Devices Assembled and aligned monochromatic assembly, performed mechanical and electrical set-ups, soldering resistor, diode, transistor and capacitor on PC board, adjustment, troubleshooting, modifications, and final testing, worked with engineers, followed verbal and written instructions, worked with print and schematic diagrams

REFERENCES: Available upon request



Contact this candidate