Post Job Free
Sign in

Mechanical Inspector Project Management

Location:
Fresno, CA
Posted:
June 07, 2024

Contact this candidate

Resume:

Mr. Riichard Satterfiielld

**** *. ********* ***

Fresno CA 93722

(559) 281 - 7163

** ***** *********** *** *** Constructiion buiilldiing trades. Superviisor on many projects. Most of my experiience came from Power pllant constructiion, and Oiill Refiinery outages. Summary of Qualliifiicatiions :

Current superviisor of piipe fabriicatiion and iinstallllatiion of four (LFGTE) Landfiillll gas to energy faciilliitiies, for Ameresco. (Buiillt by T.T.S.C) Foreman of welldiing/piipe fabriicatiion crew. at Giillll Ranch naturall gas storage/compressor statiion.

(BuiilltbySnellson Companiies Inc.)

Superviisor of the Piipe Crew for a GE LM6000 iinstallllatiion project (Allgonquiin Repower Project

,Sanger CA 2007)

Superviised the fabriicatiion and iinstallllatiion of piipe for a fiilllliing termiinall at Kiinder Morgan faciilliity

(Fresno CA)

Work hiistory:

T.T.S.C

Lodii, CA

2001-Present

Tiitlle: Superviisor of Piipe Dept.

· Responsiibiilliitiies iinclluded, materiiall take offs, crew superviisiion, coordiinate/schedulle tasks,iinsure qualliity controll. (buiillt to specs, accordiing to P & I D''s) generate Requests for iinformatiion when needed. Assiist iin commiissiioniing and start up process.

Snellson Companiies Inc.

March 2010 to Jan 2011

Tiitlle: Superviisor

· Responsiibiilliitiies iinclluded, workiing clloselly wiith project management to determiine materiiall needs, proper constructiion of piipiing spoolls. Coordiinate work to be done. Assiist iincommiissiioniing, startup and redlliines Rockford Corporatiion

2009-2010

Tiitlle: Superviisor

· Responsiibiilliitiies iinclluded, fabriicatiion and iinstallllatiion of gas piipiing. Gemma Power Systems

2009

· Responsiibiilliitiies iinclluded fabriicatiionofheavywallll piipe,sch. 160 allll x-ray test. Proper fiit-up of piipe fiittiings.

·

Kiiewiit Power Constructiion

2008-2009

Journeyman/Superviisor

· Responsiibiilliitiies iinclluded iinstrumentatiion iinstallllatiion wiith tube bendiing requiirements, oversee the compllete llube oiill system fllushiing project for four GE LM6000 fast start turbiine generators, . Assiist iin startup

T.I.C

1987-2000

· Started my career iinthe iindustriiall piipe trades here ( a llong tiime ago) as an apprentiice



Contact this candidate