Name of Employer : NKAS Services Pvt Ltd.

Head Office posted at Durgapur, WB Current Position : Sr. Manager (Survey)

Profession : Marine & Land Survey

Permanent Address : Village- Jemari, P.O- Basudebpur Jemari

P.S- Salanpur, Dist.- Paschim Burdwan, Pin-713335, State- West. Bengal

CARRIER OBJECTIVE:-

I am Md Ajmal, I have 14 years of experience in the Construction Field of Marine Cable Stay Bridge, Segmental Bridge and Road Construction. I am fully conversant with topographical, contour, boundary, and highway Construction and preparation of all drawings related to the survey as per Construction Drawing and other Authority Standards.

Also worked as a Highway Surveyor, in bed preparation. Independently handled the site with the entire satisfaction to the senior’s and Authority Engineer and Consultancy

ABSTRACT (FROM CURRENT ORGANIZATION)

Name of Employer

Designation

Project

Period

NKAS Services Pvt Ltd.

Sr. Manager (Survey)

I monitor the entire project from the head office in Durgapur, and visiting the site in between.

May 2023

Till Date

GR Infra Project Limited

Asst. Manager (Survey)

VADODRA - MUMBAI EXPRESSWAY

Nov 2021

Apr 2023

Dilip Buildcon Ltd

Sr. Surveyor

ZUARI RIVER CABLE STAYED BRIDGE PROJECT, GOA

Sep 2016

Nov 2021

Dilip Buildcon Ltd

Sr. Surveyor

HIGHWAY PROJECT NH-212 (KARNATAKA)

Apr 2015

Sep 2016

Apco Infratech Pvt Ltd

Sr. Surveyor

Varanasi Ring Road

Feb 2015

Mar 2015

JKM Infra Project Ltd

Sr. Surveyor

HIGHWAY PROJECT NH-28

(Muzaffarpur, Bihar)

Aug 2012

Feb 2015

Sapex architect Engineers, Om Sai Survey Engineers

Surveyor

DPR Project NH, SH, PMGSY

(Jharkhand, Bihar, Orissa, MP)

NOV 2009

Aug 2012

TECHNICAL QUALIFICATION

S.no

Qualification

Institute

Board

Year of Passing

1

Land Surveyor

Nehru Yuva Kendra

West Bengal

Govt. of India

2009

2

Computer

Youth Computer Training Centre.

Govt. of West

Bengal

2009

3

Diploma in Civil

Engineering

Luthfaa Polytechnic Institute, Durgapur

W.B.S.C.T.E

2019

EDUCATION QUALIFICATION

S.no

Qualification

Institute

Board

Year of Passing

1

Madhyamic

Achra Jagneshwar Institution

W.B.B.S.E

2006

2

Higher Secondary

Achra Jagneshwar Institution

W.B.C.H.S.E

2008

WORKING COMPANY

1)VADODRA - MUMBAI EXPRESSWAY

Employer : GR INFRA PROJET LIMITED

Client : NHAI MAHARASTRA

Authority Engineer : Malviya

Position Held : Asst. Manager

Projects Cost : 3,000 Cr.

Project : Construction of Eight Lane access controlled Expressway From KM.26+582 to KM. 50+700 of Main Expressway and KM. 0+000 KM. 3+000 Spur (Shirsad to Maswan Section of Vadodra Mumbai Expressway) in the state of Maharashtra on Hybrid Annuity Mod under bharatmala Pariyojana (Phase II – Package XIII).

JOB RESPONSIBILITES

Marine pile layout with DGPS

Jack up Barge shifting with DGPS

Preparation of Segment Casting Yard Layout and Level as per Drawing.

Preparation of Segment Casting Yard.

Preparation of Segment Casting Yard bed.

Preparation of Layout Segment Launching Alignment.

Preparation of Marine/River Structure Layout and Level as per Drawing Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal Etc.

Preparation of Major Bridge Structure Layout and Level as per Drawing Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal Etc.

Preparation of Test Pile, Anchor Pile as per Drawing.

Monthly Stock Measurement and Quantity Calculation.

2)ZUARI RIVER CABLE STAYED BRIDGE PROJCT, GOA

Employer : DILIP BUILDCONLIMITED

Client : MORTH / Public Works Department, Goa Authority Engineer : TPF Engineer Pvt. Ltd

Position Held : Sr. Surveyor

Projects Cost : 1402 Cr.

Project : Construction of Bridge including Approaches across Zuari River Cable Stayed Bridge on NH-17/NH-66 on Panjim - Mangalore

CABLE STAYED BRIDGE DETAILS

TOTAL LENGHT : 640M

MAIN SPAN : 360M

BACK SPAN : 140X2 PYLON PIER (NO'S) : 8 NO'S

PYLON HEIGHT : 100M FROM PILE CAP,

PYLON TOP RL 106.8 M FROM SEA LEVEL

GROUP PILE : 78 PILE ONE GROUP PILE

PILE CAP SIZE : 89.8X27X4

STEEL SEGMENT : 106 NO'S PYLON STEEL GUID BOX : 112 NO'S CABLE : 224 NO'S

section in the state of GOA-on EPC mode.(522+615 to 536+250)

JOB RESPONSIBILITES

Preparation of Structure Layout and Level as per Drawing Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal Etc.

Preparation of Co-ordinate and Level of Cable Stay Bridge like Pylon, Pylon Anchor Frame of

Steel Guide Pipe in Pylon, Steel Segment of Cable Stay Bridge etc.

Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier

Cap, Pedestal Etc.

Field Layout marking of Soil Investigation Bore hole, Layout of Pile, Pile cap, Pier wall, Pier cap, Pedestal, Slab, crash barrier, Liner,Pylon etc.

Concrete Segment Alignment, Wings Level Setup.

Monthly Stock Measurement and Quantity Calculation.

TBM & Traverse, Calculation, Correction & Summery Sheet Preparation.

Preparation of Bed - SG, GSB, WMM, DBM and BC & DLC, PQC as per technical Specification.

Preparation Grid Sheet / Layer Chart & Tolerance Sheet FRL like EMB, SG, GSB, WMM, DBM, BC, DLC, PQC as per P&P & TCS

Preparation RFI and Maintain Status of RFI

Monitoring, inspection, documentation and implementation of work as per plan and specifications.

Topographical Survey data Drawing Preparation.

Digitalization of Village Map & Superimpose in Drawing.

3)HIGHWAY PROJECT

Employer : DILIP BUILDCONLIMITED

Client : THE PUBLIC WORKS DEPT, GOVT.OF KARNATAKA

Authority Engineer : LEA ASSOCIATES SOUTH ASIA PVT. LTD Position Held : Sr. Surveyor

Projects Cost : 419.40 Cr.

Project : Rehabilitation and Upgradation of Kerala Border to Kollegala Section of NH-212 (km136.600 – km 268.475) Excluding (Km 239.600 - Km 241.520) in the state of Karnataka to Two lanes with paved shoulders/Four lanes Under NHDP IV A on EPC basis.

4)HIGHWAY PROJECT

Employer : JKM INFRA PROJECTS LIMITED

Client : NATIONAL HIGHWAYS AUTHORITY OF INDIA

Independent Consultant : Frischman Prabhu Position Held : Sr. Surveyor

Projects Cost : 359 Crore

Project : Improvement works Two Laning of Muzaffarpur – Barauni Section of NH-28 From Km. 519.600 to Km. 627.00 in the state of Bihar under NHDP Phase IVB through Public Private Partnership (PPP) On Design, Build Finance Operate and Transfer (“DBFOT”) TOLL Basis.

JOB RESPONSIBILITES

TBM Fixing, Auto-Level, Execution of DBM and BC Work Include my main Responsibility. Besides this I am also looking After Various Works Like- Earth Work, GSB, WMM.

I was Responsible for conducting all the Field Activities for Construction Work like Earth Work, GSB, WMM, DBM, BC. Day to Day Manpower and Machinery Utilization and Various work Fronts has been my Routine Responsibilities.

Responsible for Preparation of Pavement Bed Preparation - GSB, WMM, DBM and BC as per technical Specification

Responsible for preparing Survey Data, Prepare RFI and Maintain Status of RFI

Responsible for, Camber Calculation, Calculation of RL of Pavement Layer as per Site Condition

Responsible for Level Sheet calculation.

Responsible for Rigid Pavement Bed Preparation – DLC, PQC etc.

Provide technical survey expertise to enable accurate activities, quantification of onsite lay outs.

Monitoring, inspection, documentations and ensure quality of work is maintained in the implementation of work as per plan and specifications

Checks the location or coordinates of all shop drawings and master plan before the construction starts and calculate coordinates and elevations to be set out (includes civil and isometric drawings). Topographic survey and Calculates the cut & fill, Volume of Stockpiles using AutoCAD, Surfer, for billing purposes.

Surveying of the project and fixing of alignment & layout of all structures through Total Station as per the drawing.

Supervision construction activities and execution of project.

Draw necessary plan as per requirements of the project through Auto-cad

Laying of Bituminous work (DBM/BC) as per FRL.

5)DPR PROJECT

Survey Consultancy : i) Sapex Architects Engineers, ii) Om Sai Survey Engineer

Position Held : Surveyor

Project : National Highway, State Highway, PMGSY

Place : Tata Jamshedpur, Orissa, Bihar, MP.

JOB RESPONSIBILITES

TBM Pillar Fixing.

TBM FLY Level, Check Level, Traverse.

Topographical Survey, Center line marking, OGL taken.

Topographical Survey data Drawing Preparation.

3 to 4 Survey Team Site Management.

SOFTWARE KNOWLEDGE

AutoCAD 2007,2012,2018

Civil 3D

Esurvey CAD

SURFER,

SWDTM

Global Mapper

Google Earth

Ms-office, Word, Excel, Power point, Access)

INSTRUMENT HANDLING:-

DGPS

Total station:- Trimble Robotic Total Station S5, Leica, Topcon, Sokia, South, Kolida, Horizon

Auto level

Theodolite

PERSONAL DETAILS

Passport No. – J8713295

Date of Issue - 21-09-2011 Date of Expiry- 20-09-2021 Place of Issue – Kolkata, India

PERSONAL PROFILE

Name : Md. Ajmal

Father' Name : Md Harun

Date of Birth : 30.07.1987

Nationality : Indian

Status : Married

Languages : Hindi, English, Bengali & Urdu. Interests and Activities : Traveling, Playing Cricket

Declaration

I, undersigned, certify that to the best of my knowledge and belief, these data correctly describe me, my qualification and my experience.

~ Thanking you to spend your expensive Time for my Resume~

Date: MD AJMAL

Marine Cable stayed Bridge, Segmental Bridge Goa Experience: Sep 2016 to Nov 2021

Vaitarna River Bridge, Vadodra Mumbai Expressway: - Nov 2021 to Apr 2023



Contact this candidate